Cost of “gifted” names
Response by KiwiRail to Alex Daniels on .
Successful.
Good afternoon   Please find the attached.   Kind regards Dave   Dave Allard  | Senior Government Relations Advisor DDI: 027 201 8182...
Progress on Halswell Junction Road realignment
Response by KiwiRail to Cody C on .
Partially successful.
Good afternoon Cody   Just to clarify, I had thought the information would have been sufficient to answer your queries, but to be definitive.   Wh...
Options for ballast replacement in Auckland
Response by KiwiRail to R S Grant on .
Partially successful.
Good afternoon Grant. If you have a look at document three under the release, I think you will find that will answer your query about the various opti...
Block of line impact on freight share
Response by KiwiRail to Isaac Morrison on .
Long overdue.
Good afternoon Isaac Apologies for the delay in getting the reports loaded, but as per our previous letter, the studies and reports on the Decarbonisa...
Northland Rail Line beyond Kauri
Response by KiwiRail to Andrew Jones on .
Successful.
Good afternoon Andrew,   The planned rail upgrades between Kauri and Otiria are currently paused, pending the Government's decision about building...
Good evening David Please find our reply below. 1. How many train movements occurred on the Shands Rd/Hornby branch spur in the last 12 months? The...
Good afternoon Please find the attached. Kind regards Dave Dave Allard  | Senior Government Relations Advisor DDI: 027 201 8182 Level 4, Wellington...
Interislander using google suit (google docs, sheets ect)
Response by KiwiRail to Luna on .
Information not held.
Apologies, I had your request noted as being due on 6 August 2024. I have enquired as to your request and am advised that KiwiRail uses the Microsoft...
Spend on staff transport
Response by KiwiRail to Sam Ballantine on .
Partially successful.
Good afternoon Sam Thank you for your enquiry. This is a simple on to answer as all that information is reported on publicly as part of KiwiRail's res...
Wairarapa Line tunnel works
Response by KiwiRail to Lloyd Davies on .
Awaiting classification.
Good afternoon Lloyd Please find our response below. Please note we have taken your query to mean the work completed at Easter, and any further work....
Locomotive Mean Distance Between Failures (MDBF)
Response by KiwiRail to LJ Holden on .
Successful.
Good afternoon Lewis   Please find the attached.   As noted previously there is considerable fluctuation in the figures from month to month, w...
Compton St level crossing Tinwald MSL 97.54 km
Response by KiwiRail to Patrick Dunford on .
Successful.
Good afternoon Patrick Apologies for the delay in responding to your query. KiwiRail has looked at the Compton Street level crossing in relation to t...
Golden Triangle Electrification Detailed Business Case aka GTEP DBC
Response by KiwiRail to Bob on .
Awaiting classification.
Good morning Bob We have proactively published the detailed business case - this can be found here https://www.kiwirail.co.nz/who-we-are/sustainabilit...
Train Control Operating Irregularities
Response by KiwiRail to A. Puohotaua on .
Refused.
Good afternoon We have attempted to make contact to refine your request into a more manageable size, however we have not heard from you as at time of...
Thanks Patrick - received. I'll see what I can find out for you, I can't imagine it is a manually activated crossing, i.e that the staff would be sett...
Master fleet list
Response by KiwiRail to Connor Johnson on .
Successful.
Good afternoon Connor A quick email to acknowledge we have received your request for the Masterfleet and call sign for all KiwiRail trains. I note you...
Request for Information on Gender Diversity at KiwiRail
Response by KiwiRail to Anna on .
Successful.
Good afternoon   Please find our response below.   1) The percentage of women holding Project Manager positions. Using our Project Management...
Working from heights ban
Response by KiwiRail to Mark Montgomerie on .
Successful.
Good afternoon Mark.   Please find our response re your OIA query below.   1. Details of the incident(s) that led to the ban, including any in...
Marsden Point Spur Business Case
Response by KiwiRail to Colin Jones on .
Refused.
Good morning Colin, and thank you for your request. Please note, we are declining your request under Section 9(2)(f)(iv) of the Act - i.e. Active Cons...
Worksite
Response by KiwiRail to jayson chilvers on .
Long overdue.
Good afternoon Jayson   Please find our response below.   1) Why is everything stacked right underneath my window where it is the most disrupt...
In progress and planned construction/maintenance
Response by KiwiRail to Connor Johnson on .
Partially successful.
Good afternoon Connor Thank you for your request. Information on our major projects, including the Northland Rail Rejuvenation, Wellington/Wairarapa...
Level crossing improvements on Wairarapa Line
Response by KiwiRail to Patrick Dunford on .
Partially successful.
Good afternoon Patrick Please see below the response form our Wairarapa Upgrades Team. KiwiRail has funding from the New Zealand Upgrade Programme (NZ...
Passenger rail diesel consumption
Response by KiwiRail to Peter King on .
Successful.
Good afternoon Peter   Please find our response below.   These figures include the generator vans which are critical to the service operating....
Parker Street level crossing and cycleway integration design delays
Response by KiwiRail to Cody C on .
Information not held.
Good afternoon Cody Reading your query, there isn't a succinct answer that one person made the decision. As the email of 28 Feb notes the decision to...
Track rebuild Papakura to Pukekohe
Response by KiwiRail to Niall Robertson on .
Partially successful.
Good afternoon Niall. Please find our response below. As part of Stage 3b of the Rail Network Rebuild (RNR), drainage work is planned between Puhinui...