Progress on Halswell Junction Road realignment
Partially successful.
Good afternoon Cody
Just to clarify, I had thought the information would have been sufficient
to answer your queries, but to be definitive.
Wh...
Options for ballast replacement in Auckland
Partially successful.
Good afternoon Grant.
If you have a look at document three under the release, I think you will find that will answer your query about the various opti...
Good afternoon Isaac
Apologies for the delay in getting the reports loaded, but as per our previous letter, the studies and reports on the Decarbonisa...
Good afternoon Andrew,
The planned rail upgrades between Kauri and Otiria are currently paused,
pending the Government's decision about building...
Track activity on the Shands Spur, Hornby, Christchurch
Response by KiwiRail to David Palmer on .
Successful.
Good evening David
Please find our reply below.
1. How many train movements occurred on the Shands Rd/Hornby branch spur in the last 12 months?
The...
Main North Line corridor between Christchurch and Rangiora
Response by KiwiRail to Patrick Dunford on .
Successful.
Good afternoon
Please find the attached.
Kind regards
Dave
Dave Allard | Senior Government Relations Advisor
DDI: 027 201 8182
Level 4, Wellington...
Interislander using google suit (google docs, sheets ect)
Information not held.
Apologies, I had your request noted as being due on 6 August 2024.
I have enquired as to your request and am advised that KiwiRail uses the Microsoft...
Good afternoon Sam
Thank you for your enquiry.
This is a simple on to answer as all that information is reported on publicly as part of KiwiRail's res...
Good afternoon Lloyd
Please find our response below.
Please note we have taken your query to mean the work completed at Easter, and any further work....
Good afternoon Lewis
Please find the attached.
As noted previously there is considerable fluctuation in the figures from
month to month, w...
Compton St level crossing Tinwald MSL 97.54 km
Response by KiwiRail to Patrick Dunford on .
Successful.
Good afternoon Patrick
Apologies for the delay in responding to your query.
KiwiRail has looked at the Compton Street level crossing in relation to t...
Golden Triangle Electrification Detailed Business Case aka GTEP DBC
Awaiting classification.
Good morning Bob
We have proactively published the detailed business case - this can be found here https://www.kiwirail.co.nz/who-we-are/sustainabilit...
Good afternoon
We have attempted to make contact to refine your request into a more manageable size, however we have not heard from you as at time of...
Reasons for nuisance alarm tripping at Norfolk Road, Waingawa
Response by KiwiRail to Patrick Dunford on .
Successful.
Thanks Patrick - received.
I'll see what I can find out for you, I can't imagine it is a manually activated crossing, i.e that the staff would be sett...
Good afternoon Connor
A quick email to acknowledge we have received your request for the Masterfleet and call sign for all KiwiRail trains.
I note you...
Good afternoon
Please find our response below.
1) The percentage of women holding Project Manager positions.
Using our Project Management...
Good afternoon Mark.
Please find our response re your OIA query below.
1. Details of the incident(s) that led to the ban, including any
in...
Good morning Colin, and thank you for your request.
Please note, we are declining your request under Section 9(2)(f)(iv) of the Act - i.e. Active Cons...
Good afternoon Jayson
Please find our response below.
1) Why is everything stacked right underneath my window where it is the
most disrupt...
In progress and planned construction/maintenance
Response by KiwiRail to Connor Johnson on .
Partially successful.
Good afternoon Connor
Thank you for your request.
Information on our major projects, including the Northland Rail Rejuvenation, Wellington/Wairarapa...
Level crossing improvements on Wairarapa Line
Response by KiwiRail to Patrick Dunford on .
Partially successful.
Good afternoon Patrick
Please see below the response form our Wairarapa Upgrades Team.
KiwiRail has funding from the New Zealand Upgrade Programme (NZ...
Good afternoon Peter
Please find our response below.
These figures include the generator vans which are critical to the service
operating....
Parker Street level crossing and cycleway integration design delays
Information not held.
Good afternoon Cody
Reading your query, there isn't a succinct answer that one person made the decision.
As the email of 28 Feb notes the decision to...
Track rebuild Papakura to Pukekohe
Response by KiwiRail to Niall Robertson on .
Partially successful.
Good afternoon Niall.
Please find our response below.
As part of Stage 3b of the Rail Network Rebuild (RNR), drainage work is planned between Puhinui...