Requests similar to 'How much diesel the freight trains use and how much freight is carried?' (page 5)
Good evening Barry
I'd like to acknowledge receipt of your official information request for information as per the below
We received your request on...
Interislander using google suit (google docs, sheets ect)
Information not held.
Good evening
I'd like to acknowledge receipt of your official information request for information as per the below.
We received your request on 5 July...
IREX: Cost expended with the ECI Contractor (Downer and HEB) between Feb 2022 and the closing of the Project
Response by KiwiRail to Adrian Sykes on .
Long overdue.
Good afternoon Adrian
I'd like to acknowledge receipt of your official information request dated 4 August 2024, for information on ECI contractor spen...
IREX: Cost expended with the engineering and design team (Jacobs and WSP) from Feb 2022 - the closing of the Project
Response by KiwiRail to Adrian Sykes on .
Awaiting classification.
Good afternoon Adrian
I'd like to acknowledge receipt of your official information request dated 4 August 2024, for information on the design team spe...
Reasons for nuisance alarm tripping at Norfolk Road, Waingawa
Response by KiwiRail to Patrick Dunford on .
Successful.
Thanks Patrick - received.
I'll see what I can find out for you, I can't imagine it is a manually activated crossing, i.e that the staff would be sett...
Total number of non-compliant level rail crossings and how many have been upgraded with financial support or as a joint venture with a developer
Response by KiwiRail to Jessica Dingle on .
Awaiting classification.
Good afternoon
I'd like to acknowledge receipt of your official information request for information on non-compliant rail crossings.
We received your...
Good morning Tony
I'd like to acknowledge receipt of your official information request for information on the Capital Connection.
We received your re...
Progress on Halswell Junction Road realignment
Partially successful.
Good afternoon Cody
Just to clarify, I had thought the information would have been sufficient
to answer your queries, but to be definitive.
Wh...
Project iRex turnaround time modelling
Response by KiwiRail to James Robinson on .
Awaiting classification.
Kia ora James
Please find attached the response to your OIA request for information on
Project iReX turnaround time modelling.
Ngā mihi...
Good afternoon Sam
Thank you for your enquiry.
This is a simple on to answer as all that information is reported on publicly as part of KiwiRail's res...
Good afternoon Tirth
We have received your request, through the FYI website asking for information on KiwiRail projects spanning the period from 1990...
Bridge strike issues at Main South Line Bridge 43, "Tinwald Viaduct"
Response by KiwiRail to Patrick Dunford on .
Partially successful.
Good afternoon Patrick.
I'd like to acknowledge receipt of your request - just be aware we are considering a possible transfer to Ashburton District C...
Good afternoon Cody
Our response below -
KiwiRail does not have any current upgrade plans for the Amyes/ Shand Road level crossing in the next 10 yea...
Level crossing improvements on Wairarapa Line
Response by KiwiRail to Patrick Dunford on .
Partially successful.
Good afternoon Patrick
Please see below the response form our Wairarapa Upgrades Team.
KiwiRail has funding from the New Zealand Upgrade Programme (NZ...
Concept Design for Rail Ro-Ro Passenger Ferry (2011)
Information not held.
Good afternoon
I am responding to your OIA request as per the below.
Unfortunately, we are declining your request under Section 18(e) - does not exis...
Good afternoon Isaac
Apologies for the delay in getting the reports loaded, but as per our previous letter, the studies and reports on the Decarbonisa...
Train Control Operating Irregularities
Response by KiwiRail to A. Puohotaua on .
Awaiting classification.
Good afternoon
We have attempted to make contact to refine your request into a more manageable size, however we have not heard from you as at time of...
In progress and planned construction/maintenance
Response by KiwiRail to Connor Johnson on .
Partially successful.
Good afternoon Connor
Thank you for your request.
Information on our major projects, including the Northland Rail Rejuvenation, Wellington/Wairarapa...
Request for Information to decline transfer of Land to Council for Solid Waste purpose 36 Station Road Te Puke
Response by KiwiRail to Wendy O'Neill on .
Awaiting classification.
Good afternoon Wendy
Thank you for your enquiry regarding the land at 36 Station Road, Te Puke, currently leased by the Western Bay of Plenty District...
Good afternoon
We can advise the current version of AMICUS was put in production in 2005.
Kind regards
Dave
Dave Allard | Senior Government Relati...
Critical Path Project Plan for upgrading the Picton Rail Enabled Ferry Terminal
Response by KiwiRail to Jon Eriksen on .
Awaiting classification.
Good morning Jon
We have received your request, as per the below.
This information however is not held by KiwiRail, and instead is the responsibility...
Good morning Colin, and thank you for your request.
Please note, we are declining your request under Section 9(2)(f)(iv) of the Act - i.e. Active Cons...
Wellington Ferry Terminal Infrastructure and Linkspan
Awaiting classification.
Good afternoon TJ
This email is to advise we are transferring part of your request to Ferry Holdings Ltd.
Any information post 5 March 2025 on the reu...
Good afternoon Joel
Please find the attached which is the current fleet list for 2024.
Please be advised, we have been unable to locate a list of roll...
Maintenance arrangements for the underpass in Waltham between Thackeray and Falsgrave Streets
Successful.
Good morning Cody
The response to this question was part of the previous letter answering your questions as you asked three queries at the same time....