Requests similar to 'Bridge strike issues at Main South Line Bridge 43, "Tinwald Viaduct"' (page 2)

Good afternoon Patrick.   To answer your query - Waka Kotahi NZTA is suggesting it will be possible to provide improved connectivity at Rolleston...
Meterage for locations on the Kiwirail network
Response by KiwiRail to John Voss on .
Information not held.
Good afternoon John Thank you for your request for - a spreadsheet containing the meterage (i.e., km from the beginning of the line) for all named loc...
Options for ballast replacement in Auckland
Response by KiwiRail to R S Grant on .
Partially successful.
Good afternoon Grant. If you have a look at document three under the release, I think you will find that will answer your query about the various opti...
Block of line impact on freight share
Response by KiwiRail to Isaac Morrison on .
Long overdue.
Good afternoon Isaac Apologies for the delay in getting the reports loaded, but as per our previous letter, the studies and reports on the Decarbonisa...
Non-refundable costs paid to HMD
Response by KiwiRail to Michael Steere on .
Refused.
Good morning Michael   Thank you for your enquiry, asking for information on:   1. Please inform me how much money has already been paid to Hyu...
Golden Triangle Electrification Detailed Business Case aka GTEP DBC
Response by KiwiRail to Bob on .
Awaiting classification.
Good morning Bob We have proactively published the detailed business case - this can be found here https://www.kiwirail.co.nz/who-we-are/sustainabilit...
Distances of stations on the rail network
Response by KiwiRail to Patrick Dunford on .
Handled by post.
Get in touch directly, and I'll see if I can put you in touch with our data guys. Dave Allard  | Senior Government Relations Advisor DDI: 027 201 8182...
Good afternoon Regan, and thank you for your enquiry. We are declining your request in full under sections 9(2)(b)(ii) and 9(2)(i) – Commercial inform...
Interislander using google suit (google docs, sheets ect)
Response by KiwiRail to Luna on .
Information not held.
Apologies, I had your request noted as being due on 6 August 2024. I have enquired as to your request and am advised that KiwiRail uses the Microsoft...
Wairopa logging trains
Response by KiwiRail to Niall Robertson on .
Awaiting classification.
Good evening Niall Thank you for your enquiry on price increases for logging trains on the Wairoa line. We note that you are stating that "KiwiRail s...
Track rebuild Papakura to Pukekohe
Response by KiwiRail to Niall Robertson on .
Partially successful.
Good morning Nial I'd like to acknowledge receipt of your official information request for information on KiwiRail’s track rebuild work on the Papakur...
Good afternoon   Thank you for your enquiry, received through the FYI.org website and noted as the below.   In 2024, has KiwiRail made, /or do...
Titanic references
Response by KiwiRail to Tony on .
Information not held.
Good afternoon Tony   Thanks for your enquiry.   I can advise that under Section 18(e) we are declining your request, as no such reports or re...
Master fleet list
Response by KiwiRail to Connor Johnson on .
Successful.
Good afternoon Connor A quick email to acknowledge we have received your request for the Masterfleet and call sign for all KiwiRail trains. I note you...
Process behind alternatively fueled vehicles policy
Response by KiwiRail to Matt Johnston on .
Long overdue.
Good afternoon Matt I'd like to acknowledge receipt of your official information request for information on KiwiRail/Interislander's policy on transpo...
Parker Street level crossing and cycleway integration design delays
Response by KiwiRail to Cody C on .
Information not held.
Good afternoon Cody Reading your query, there isn't a succinct answer that one person made the decision. As the email of 28 Feb notes the decision to...
West Coast (SI) Coal Various
Response by KiwiRail to Lindon Boyce on .
Successful.
Good afternoon Lindon   Please find our responses below.   * The key coal loading facility on the West Coast is Ngakawau.  We also regularly load...
Passenger rail diesel consumption
Response by KiwiRail to Peter King on .
Successful.
Good afternoon Peter   Please find our response below.   These figures include the generator vans which are critical to the service operating....
Request for Information on Gender Diversity at KiwiRail
Response by KiwiRail to Anna on .
Successful.
Good afternoon   Please find our response below.   1) The percentage of women holding Project Manager positions. Using our Project Management...
Locomotive Mean Distance Between Failures (MDBF)
Response by KiwiRail to LJ Holden on .
Successful.
Good afternoon Lewis   Please find the attached.   As noted previously there is considerable fluctuation in the figures from month to month, w...
Good morning Jon We have received your request, as per the below. This information however is not held by KiwiRail, and instead is the responsibility...
Wairarapa Line tunnel works
Response by KiwiRail to Lloyd Davies on .
Awaiting classification.
Good afternoon Lloyd Please find our response below. Please note we have taken your query to mean the work completed at Easter, and any further work....
Wellington Ferry Terminal Infrastructure and Linkspan
Response by KiwiRail to T.J. Pohl on .
Awaiting classification.
Good afternoon TJ This email is to advise we are transferring part of your request to Ferry Holdings Ltd. Any information post 5 March 2025 on the reu...
Wellington Upgrades
Response by KiwiRail to Isaac Morrison on .
Successful.
Good afternoon Isaac I'd like to acknowledge receipt of your official information request for information on KiwiRail’s upgrade of the Wellington Metr...
Concept Design for Rail Ro-Ro Passenger Ferry (2011)
Response by KiwiRail to T.J. Pohl on .
Information not held.
Good afternoon I am responding to your OIA request as per the below. Unfortunately, we are declining your request under Section 18(e) - does not exis...