Requests similar to 'Bridge strike issues at Main South Line Bridge 43, "Tinwald Viaduct"' (page 2)
Improvements to Midland Line / Main South Line connectivity at Rolleston
Response by KiwiRail to Patrick Dunford on .
Successful.
Good afternoon Patrick.
To answer your query - Waka Kotahi NZTA is suggesting it will be possible
to provide improved connectivity at Rolleston...
Meterage for locations on the Kiwirail network
Information not held.
Good afternoon John
Thank you for your request for - a spreadsheet containing the meterage (i.e., km from the beginning of the line) for all named loc...
Options for ballast replacement in Auckland
Partially successful.
Good afternoon Grant.
If you have a look at document three under the release, I think you will find that will answer your query about the various opti...
Good afternoon Isaac
Apologies for the delay in getting the reports loaded, but as per our previous letter, the studies and reports on the Decarbonisa...
Good morning Michael
Thank you for your enquiry, asking for information on:
1. Please inform me how much money has already been paid to Hyu...
Golden Triangle Electrification Detailed Business Case aka GTEP DBC
Awaiting classification.
Good morning Bob
We have proactively published the detailed business case - this can be found here https://www.kiwirail.co.nz/who-we-are/sustainabilit...
Distances of stations on the rail network
Response by KiwiRail to Patrick Dunford on .
Handled by post.
Get in touch directly, and I'll see if I can put you in touch with our data guys.
Dave Allard | Senior Government Relations Advisor
DDI: 027 201 8182...
Advice and correspondence regarding the decision to not extend New World's lease on the site at 2 Bunny Street
Response by KiwiRail to Regan Gibbons on .
Refused.
Good afternoon Regan, and thank you for your enquiry.
We are declining your request in full under sections 9(2)(b)(ii) and 9(2)(i) – Commercial inform...
Interislander using google suit (google docs, sheets ect)
Information not held.
Apologies, I had your request noted as being due on 6 August 2024.
I have enquired as to your request and am advised that KiwiRail uses the Microsoft...
Good evening Niall
Thank you for your enquiry on price increases for logging trains on the Wairoa line.
We note that you are stating that "KiwiRail s...
Track rebuild Papakura to Pukekohe
Response by KiwiRail to Niall Robertson on .
Partially successful.
Good morning Nial
I'd like to acknowledge receipt of your official information request for information on KiwiRail’s track rebuild work on the Papakur...
KiwiRail Interislander and Great Journeys of NZ - Promo Code System
Response by KiwiRail to Michael Nicholson on .
Successful.
Good afternoon
Thank you for your enquiry, received through the FYI.org website and noted
as the below.
In 2024, has KiwiRail made, /or do...
Good afternoon Tony
Thanks for your enquiry.
I can advise that under Section 18(e) we are declining your request, as no
such reports or re...
Good afternoon Connor
A quick email to acknowledge we have received your request for the Masterfleet and call sign for all KiwiRail trains.
I note you...
Process behind alternatively fueled vehicles policy
Response by KiwiRail to Matt Johnston on .
Long overdue.
Good afternoon Matt
I'd like to acknowledge receipt of your official information request for information on KiwiRail/Interislander's policy on transpo...
Parker Street level crossing and cycleway integration design delays
Information not held.
Good afternoon Cody
Reading your query, there isn't a succinct answer that one person made the decision.
As the email of 28 Feb notes the decision to...
Good afternoon Lindon
Please find our responses below.
* The key coal loading facility on the West Coast is Ngakawau. We also
regularly load...
Good afternoon Peter
Please find our response below.
These figures include the generator vans which are critical to the service
operating....
Good afternoon
Please find our response below.
1) The percentage of women holding Project Manager positions.
Using our Project Management...
Good afternoon Lewis
Please find the attached.
As noted previously there is considerable fluctuation in the figures from
month to month, w...
Critical Path Project Plan for upgrading the Picton Rail Enabled Ferry Terminal
Response by KiwiRail to Jon Eriksen on .
Awaiting classification.
Good morning Jon
We have received your request, as per the below.
This information however is not held by KiwiRail, and instead is the responsibility...
Good afternoon Lloyd
Please find our response below.
Please note we have taken your query to mean the work completed at Easter, and any further work....
Wellington Ferry Terminal Infrastructure and Linkspan
Awaiting classification.
Good afternoon TJ
This email is to advise we are transferring part of your request to Ferry Holdings Ltd.
Any information post 5 March 2025 on the reu...
Good afternoon Isaac
I'd like to acknowledge receipt of your official information request for information on KiwiRail’s upgrade of the Wellington Metr...
Concept Design for Rail Ro-Ro Passenger Ferry (2011)
Information not held.
Good afternoon
I am responding to your OIA request as per the below.
Unfortunately, we are declining your request under Section 18(e) - does not exis...