Dear Wellington Regional Council,

I note todays DomPost included an article titled "New timetable for Johnsonville train line plagued by delays" (URL: http://www.stuff.co.nz/dominion-post/cap...). This article stated "A new timetable on the Johnsonville line is being rolled out in an effort to combat ongoing delays, mostly caused by a wet track, on the steep, single-tracked suburban Wellington railway."

Can you please provide me with a copy of any reports by the GWRC on the proposed changes to the Johnsonville Line timetable ?

Can you please provide me with a copy of any cost estimates by the GWRC on the proposed changes to the Johnsonville Line timetable ?

Can you please provide me with a copy of any correspondence between the GWRC and Kiwirail on the proposed changes to the Johnsonville Line timetable ?

Can you please provide me with a copy of any correspondence between the GWRC and the NZTA on the proposed changes to the Johnsonville Line timetable ?

If this information is held in electronic form, I would prefer it was provided in its complete and original electronic format.

Yours faithfully,

Tony Randle

Link to this

From: Darrell Young
Wellington Regional Council

Dear Tony,

Acknowledgement of Request for Information

 

Thank you for your email dated 27 July, 2015 requesting for information on
reports and correspondence on the new timetable for Johnsonville train
line.

 

Your request is being followed-up and a reply will be sent to you shortly.

 

Yours sincerely,

 

Darrell Young

 

 

for
Leigh-Anne Buxton

General Manager

People and Capability

 

ATTENTION: This correspondence is confidential and intended for the named
recipient(s) only. If you are not the named recipient and receive this
correspondence in error, you must not copy, distribute or take any action
in reliance on it and you should delete it from your system and notify the
sender immediately. Unless otherwise stated, any views or opinions
expressed are solely those of the author, and do not represent those of
the organisation.

Link to this

From: Tony Randle

Dear Darrell Young,

Thanks for your acknowledgement. I want to amend my request by adding the following informaiton.

Firstly, for the sake of clarity when I have asked for information on "proposed changes to the Johnsonville Line timetable", this includes information related to the inability of the Johnsonville Line Matangi trains being unable to meet the current timetable (e.g. this request includes asking any reports by GWRC on the inability of the Matangi trains being unable to meet the current Johnsonville Line timetable).

Secondly, I also ask for the GWRC to please provide me with a copy of any correspondence between the GWRC and the Matangi train manufacturer on the inability of the Matangi trains being unable to meet the current Johnsonville Line timetable and on the proposed changes to the Johnsonville Line timetable ?

Yours sincerely,

Tony Randle

Link to this

From: Darrell Young
Wellington Regional Council

Thanks Tony. I will amend your request, before I forward onto the department who will handle your request.

Darrell

show quoted sections

Link to this

From: Sharon Hornal
Wellington Regional Council


Attachment OIA Response 15 067 Extension Letter.docx
132K Download View as HTML


Good afternoon Mr Randle

 

Thank you for you OIA which was received on 27 July.

 

Attached is a letter which outlines that Greater Wellington will require a
time extension to respond to your request.

 

Regards

Sharon  

ATTENTION: This correspondence is confidential and intended for the named
recipient(s) only. If you are not the named recipient and receive this
correspondence in error, you must not copy, distribute or take any action
in reliance on it and you should delete it from your system and notify the
sender immediately. Unless otherwise stated, any views or opinions
expressed are solely those of the author, and do not represent those of
the organisation.

Link to this

From: Helen Plant
Wellington Regional Council


Attachment Letter of Response OIA 2015 067.pdf
131K Download View as HTML

Attachment Attachment 1 Report Johnsonville Trial 20th Sept 2014 Unredacted.pdf
90K Download View as HTML

Attachment Attachment 10 Correspondence Matangi Project Close of the test reports for EMC.pdf
336K Download View as HTML

Attachment Attachment 11 Correspondence Matangi Project response to close of the test for EMC.pdf
45K Download View as HTML

Attachment Attachment 12 Correspondence Matangi Project Johnsonville Line Performance Data.pdf
142K Download View as HTML

Attachment Attachment 13 Report Matangi Project Mainline Test of Propulsion System in AW3 Load Condition.pdf
523K Download View as HTML

Attachment Attachment 14 TRSS Propulsion System Mainline in AW3 RM Response.pdf
66K Download View as HTML

Attachment Attachment 15 Report Matangi Project Mainline Test Procedure for Propulsion System.pdf
1.0M Download View as HTML

Attachment Attachment 16 Report Matangi Project EMU 96 Train Performance Curve after Mainline Test.pdf
787K Download View as HTML

Attachment Attachment 17 Repor Journey Time and Energy Use Test Results.pdf
528K Download View as HTML

Attachment Attachment 18 Report Matangi Project EMU 96 Journey Time and Energy Consumption Measurement Signal Descriptions.pdf
3.0M Download View as HTML

Attachment Attachment 19 Correspondence Matangi Project Type Test Report for AW3 Load Condition.pdf
79K Download View as HTML

Attachment Attachment 2 GWRC Briefing KiwiRail Jville Line.pdf
600K Download View as HTML

Attachment Attachment 20 Report Matangi Project Review the Journey Time Test Results for Johnsonville Line.pdf
357K Download View as HTML

Attachment Attachment 21 Variation to Agreement Matangi Project Typical Running Schedule.pdf
132K Download View as HTML

Attachment Attachment 3 Johnsonville Line comms review FINAL July 2015.pdf
114K Download View as HTML

Attachment Attachment 4 Correspondence Oct 18 Graph.pdf
258K Download View as HTML

Attachment Attachment 5 Simulated 4 Train Peak Trial on Johnsonville Line.pdf
36K Download View as HTML

Attachment Attachment 6 Spreadsheet Report Sat 20th Johnsonville Trial Operating Plan.pdf
75K Download View as HTML

Attachment Attachment 6 1 Correspondence Sat 20th Johnsonville Line Trial Operating Plan.pdf
412K Download View as HTML

Attachment Attachment 7 Spreadsheet Report Trial 4 Car Peak Operating Plan.pdf
74K Download View as HTML

Attachment Attachment 8 Trial 4 Car Peak Draft Operating Plan.pdf
343K Download View as HTML

Attachment Attachment 9 Correspondence Matangi Project Johnsonville Line OTP.pdf
51K Download View as HTML

Attachment OIA 2015 067 List of attachments.pdf
34K Download View as HTML


Dear Mr Randle

Attached is our letter of response to OIA Request No.  2015/067 along with
22 Attachments (this includes the list of attachments).

 

Yours sincerely

 

Helen Plant

 

Helen Plant | Executive Secretary to Chair
GREATER WELLINGTON REGIONAL COUNCIL
Te Pane Matua Taiao
Shed 39, 2 Fryatt Quay, Pipitea, Wellington 6011:  PO Box 11646, Manners
St, Wellington 6142
T:  04 830 4246     M:  027 201 2478
www.gw.govt.nz

 

 

 

 

 

ATTENTION: This correspondence is confidential and intended for the named
recipient(s) only. If you are not the named recipient and receive this
correspondence in error, you must not copy, distribute or take any action
in reliance on it and you should delete it from your system and notify the
sender immediately. Unless otherwise stated, any views or opinions
expressed are solely those of the author, and do not represent those of
the organisation.

Link to this

Things to do with this request

Anyone:
Wellington Regional Council only: