Risk Registers
Rodney Parsons made this Official Information request to Shane Reti
This request has an unknown status. We're waiting for Rodney Parsons to read recent responses and update the status.
From: Rodney Parsons
Dear Shane Reti,
Please provide copies of:
- The risk management policies and procedures for Te Whatu Ora.
- Copies of the most recent risk registers for each of the four regions.
- Copies of the most recent risk registers for each NZ hospital.
Yours faithfully,
Rodney Parsons
From: Shane Reti (MIN)
Shane Reti
Kia ora
Thank you for your email to the Minister of Health and Minister for
Pacific Peoples, Hon Dr Shane Reti.
We will endeavour to respond to your email as soon as possible. However,
due to the high volume of emails, we may not be able to provide you with
an individualised response. Please note:
* If you are an Whangârei constituent contacting the Minister about an
issue related to his electorate, your email will be passed to his
electorate office for consideration.
* Invitations and requests to meet with the Minister will be considered
and his office will be in touch with you in due course.
* Requests for official information will be managed in accordance with
provisions of the Official Information Act 1982, which may include a
transfer to a more relevant Minister or agency.
If your email falls outside of the Minister's portfolio responsibilities,
expresses a personal view, or is copied to multiple Members of Parliament,
then your email will be noted and may be transferred to another Minister’s
office, or there may be no further response to you.
If your email relates to matters including:
* Smokefree 2025, smoking or vaping - these matters fall within the
portfolio responsibilities of Hon Casey Costello, Associate Minister
of Health. You can contact her by emailing
[1][email address].
* Mental health & ACC - these matters fall within the portfolio
responsibilities of Hon Matt Doocey, Minister for ACC, Minister for
Mental Health, and Associate Minister of Health. You can contact him
by emailing [2][email address].
* Pharmac, Medsafe or medicines funding - these matters fall within the
portfolio responsibilities of Hon David Seymour, Associate Minister of
Health. You can contact him by emailing
[3][email address].
Further delegations details of Associate Ministers of Health can be found
[4]here.
Please do not expect a response from this office if your email relates to
the above matters.
If it’s a medical emergency – call 111
* This can include chest pain or tightness, difficulty breathing,
choking, severe bleeding or bleeding that won’t stop, sudden weakness
or difficulty talking, fainting or unconsciousness.
Vaccination advice
* Call the Vaccination Healthline for information about COVID-19, flu,
MMR (measles, mumps, and rubella), Boostrix (whooping cough) on 0800
28 29 26 8AM – 6PM Monday to Friday.
* You can also visit: [5]bookmyvaccine.health.nz/.
Other health support and services
* Healthline – call free on 0800 611 116
* if you’re concerned or not sure about something
* if you can’t access a GP or you don’t have one
* for advice about what’s happening for you and next steps
* if you want advice on finding services near visit [6]Healthpoint.
* Healthcare services and support [7]available in New Zealand.
* Contact your doctor or clinician.
* Need to talk? Free call or text 1737 any time for support from a
trained counsellor.
* Call the COVID-19 Healthline on 0800 358 5453.
* For disability health and wellbeing support:
* visit the Whaikaha [8]website
* with any general health concerns, including managing COVID-19,
call the Disability Helpline on 0800 11 12 13 or text 8988.
Ngâ mihi
Office of Hon Dr Shane Reti
Minister of Health
Minister for Pacific Peoples
Email: [email address]
Private Bag 18041, Parliament Buildings, Wellington 6160, New Zealand
--------------------------------------------------------------------------
References
Visible links
1. mailto:[email address]
2. mailto:[email address]
3. mailto:[email address]
4. http://www.dpmc.govt.nz/our-business-uni...
5. https://bookmyvaccine.health.nz/
6. https://www.healthpoint.co.nz/
7. https://info.health.nz/services-support/
8. https://www.whaikaha.govt.nz/support-and...
From: Shane Reti (MIN)
Shane Reti
Kia ora Rodney
Thank you for your request for official information under the Official
Information Act 1982 (the Act) to the Office of Hon Dr Shane Reti. You
requested:
“Please provide copies of:
- The risk management policies and procedures for Te Whatu Ora.
- Copies of the most recent risk registers for each of the four regions.
- Copies of the most recent risk registers for each NZ hospital.”
The reference number for your request is: SROIA-388
As required under the Official Information Act 1982, the Office will
endeavour to respond to your request no later than 20 working days after
the day your request was received. Please be advised that due dates for
requests received on 27 November 2024 onwards will take into account the
summer holiday period (25 December 2024 to 15 January 2025). Please refer
to this guide for an explanation of the [1]statutory obligations under the
Official Information Act 1982. As such you can expect a response no later
than 5 February 2024. If we are unable to respond to your request within
this time frame, we will notify you of an extension of that time
frame. 2024.
Under section 28(3) of the Act you have the right to ask the Ombudsman to
review any decisions made under this request. The Ombudsman may be
contacted by email at: [2][email address] or by calling 0800
802 602.
Ngâ mihi
Office of Hon Dr Shane Reti
Minister of Health
Minister for Pacific Peoples
Email: [3][email address]
Private Bag 18041, Parliament Buildings, Wellington 6160, New Zealand
-----Original Message-----
From: Rodney Parsons <[FOI #29577 email]>
Sent: Tuesday, 17 December 2024 12:22 AM
To: Shane Reti (MIN) <[email address]>
Subject: SRINV-388: Official Information request - Risk Registers
Dear Shane Reti,
Please provide copies of:
- The risk management policies and procedures for Te Whatu Ora.
- Copies of the most recent risk registers for each of the four regions.
- Copies of the most recent risk registers for each NZ hospital.
Yours faithfully,
Rodney Parsons
-------------------------------------------------------------------
This is an Official Information request made via the FYI website.
Please use this email address for all replies to this request:
[4][FOI #29577 email]
Is [5][Shane Reti request email] the wrong address for Official Information
requests to Shane Reti? If so, please contact us using this form:
[6]https://urldefense.com/v3/__https://fyi....
Disclaimer: This message and any reply that you make will be published on
the internet. Our privacy and copyright policies:
[7]https://urldefense.com/v3/__https://fyi....
If you find this service useful as an Official Information officer, please
ask your web manager to link to us from your organisation's OIA or LGOIMA
page.
-------------------------------------------------------------------
--------------------------------------------------------------------------
References
Visible links
1. https://www.ombudsman.parliament.nz/reso...
https://www.ombudsman.parliament.nz/reso...
2. mailto:[email address]
3. file:///tmp/[email address]
4. mailto:[FOI #29577 email]
5. mailto:[Shane Reti request email]
6. https://urldefense.com/v3/__https:/fyi.o...
7. https://urldefense.com/v3/__https:/fyi.o...
hide quoted sections
From: Shane Reti (MIN)
Shane Reti
Kia ora Rodney
Thank you for your request for official information under the Official
Information Act 1982 (the Act) to the Office of Hon Dr Shane Reti. Please
note, the correct reference number for your request is SROIA-389.
You requested:
“Please provide copies of:
- The risk management policies and procedures for Te Whatu Ora.
- Copies of the most recent risk registers for each of the four regions.
- Copies of the most recent risk registers for each NZ hospital.”
The information you have requested is more closely connected with the
functions of Health New Zealand | Te Whatu Ora. Therefore, this office has
decided to transfer your request to Health NZ under section 14(b)(ii) of
the Act. You can expect a response from Health NZ in due course.
Under section 28(3) of the Act, you have the right to ask the Ombudsman to
review any decisions made under this request. The Ombudsman may be
contacted by email at: [1][email address] or by calling 0800
802 602.
Ngâ mihi
Office of Hon Dr Shane Reti
Minister of Health
Minister for Pacific Peoples
Email: [2][email address]
Private Bag 18041, Parliament Buildings, Wellington 6160, New Zealand
From: Shane Reti (MIN) <[email address]>
Sent: Tuesday, 17 December 2024 9:13 am
To: Rodney Parsons <[FOI #29577 email]>
Subject: RE: SRINV-388: Official Information request - Risk Registers
Kia ora Rodney
Thank you for your request for official information under the Official
Information Act 1982 (the Act) to the Office of Hon Dr Shane Reti. You
requested:
“Please provide copies of:
- The risk management policies and procedures for Te Whatu Ora.
- Copies of the most recent risk registers for each of the four regions.
- Copies of the most recent risk registers for each NZ hospital.”
The reference number for your request is: SROIA-388
As required under the Official Information Act 1982, the Office will
endeavour to respond to your request no later than 20 working days after
the day your request was received. Please be advised that due dates for
requests received on 27 November 2024 onwards will take into account the
summer holiday period (25 December 2024 to 15 January 2025). Please refer
to this guide for an explanation of the [3]statutory obligations under the
Official Information Act 1982. As such you can expect a response no later
than 5 February 2024. If we are unable to respond to your request within
this time frame, we will notify you of an extension of that time
frame. 2024.
Under section 28(3) of the Act you have the right to ask the Ombudsman to
review any decisions made under this request. The Ombudsman may be
contacted by email at: [4][email address] or by calling 0800
802 602.
Ngâ mihi
Office of Hon Dr Shane Reti
Minister of Health
Minister for Pacific Peoples
Email: [5][email address]
Private Bag 18041, Parliament Buildings, Wellington 6160, New Zealand
-----Original Message-----
From: Rodney Parsons <[6][FOI #29577 email]>
Sent: Tuesday, 17 December 2024 12:22 AM
To: Shane Reti (MIN) <[7][email address]>
Subject: SRINV-388: Official Information request - Risk Registers
Dear Shane Reti,
Please provide copies of:
- The risk management policies and procedures for Te Whatu Ora.
- Copies of the most recent risk registers for each of the four regions.
- Copies of the most recent risk registers for each NZ hospital.
Yours faithfully,
Rodney Parsons
-------------------------------------------------------------------
This is an Official Information request made via the FYI website.
Please use this email address for all replies to this request:
[8][FOI #29577 email]
Is [9][Shane Reti request email] the wrong address for Official Information
requests to Shane Reti? If so, please contact us using this form:
[10]https://urldefense.com/v3/__https://fyi....
Disclaimer: This message and any reply that you make will be published on
the internet. Our privacy and copyright policies:
[11]https://urldefense.com/v3/__https://fyi....
If you find this service useful as an Official Information officer, please
ask your web manager to link to us from your organisation's OIA or LGOIMA
page.
-------------------------------------------------------------------
--------------------------------------------------------------------------
References
Visible links
1. mailto:[email address]
2. file:///tmp/S.Reti%40ministers.govt.nz
3. https://www.ombudsman.parliament.nz/reso...
https://www.ombudsman.parliament.nz/reso...
4. mailto:[email address]
5. file:///tmp/[email address]
6. mailto:[FOI #29577 email]
7. mailto:[email address]
8. mailto:[FOI #29577 email]
9. mailto:[Shane Reti request email]
10. https://urldefense.com/v3/__https:/fyi.o...
11. https://urldefense.com/v3/__https:/fyi.o...
hide quoted sections
From: hnzOIA
Tēnā koe,
Thank you for contacting Health NZ, Te Whatu Ora. This is an automatic
reply to confirm that we have received your email. Depending on the
nature of your request you may not receive a response for up to 20 working
days. We will try to respond to your query as quickly as possible.
Ngā mihi
Health NZ, Te Whatu Ora.
Statement of confidentiality: This email message and any accompanying
attachments may contain information that is IN-CONFIDENCE and subject to
legal privilege. If you are not the intended recipient, do not read, use,
disseminate, distribute or copy this message or attachments. If you have
received this message in error, please notify the sender immediately and
delete this message
From: hnzOIA
Kia ora Rodney
Thank you for your request for official information, which was transferred
from the Office of Hon Dr Shane Reti to Health New Zealand | Te Whatu Ora
(Health NZ) on 17 December 2024 for:
“Please provide copies of:
- The risk management policies and procedures for Te Whatu Ora.
- Copies of the most recent risk registers for each of the four regions.
- Copies of the most recent risk registers for each NZ hospital.”
Every directorate in each of the four regions and at every hospital will
have multiple risk registers at operational level. There are registers for
projects, for asbestos, health and safety, clinical risk etc. Collating
all of these risk registers would be a massive undertaking and would
likely result in a refusal of your request under section 18(f) of the Act.
Therefore, in order to provide you with the information requested, could
you please clarify what types of risks you were interested in whether you
mean security, clinical, or another type of risk you were seeking
information on?
Please note, under section 15 of the Official Information Act 1982, any
clarification or amendments made to a request within seven days after the
date it is received, that request may be treated as a new request and the
time limit for the response restarts.
We look forward to receiving your response.
Ngâ mihi
Office of the Chief Executive
Health New Zealand | Te Whatu Ora
Statement of confidentiality: This email message and any accompanying
attachments may contain information that is IN-CONFIDENCE and subject to
legal privilege. If you are not the intended recipient, do not read, use,
disseminate, distribute or copy this message or attachments. If you have
received this message in error, please notify the sender immediately and
delete this message
From: Rodney Parsons
Dear hnzOIA,
In some ways, you appear to have answered the question. It would be quite unusual for a large organisation not to have a strategic risk register that relates to the most important risks in organisation as a whole. If that's the case please confirm. Otherwise, could you start by providing the national and four regional strategic risk registers. That should only be five. If you could outline any other risk registers that exist, but not provide the actual registers, at this stage.
Yours sincerely,
Rodney Parsons
From: hnzOIA
Kia ora Rodney,
Thank you for your request for information on 17 December 2024. Please
find attached our response to your request.
If you have any questions, please get in touch at
[1][email address].
If you are not happy with this response, you have the right to make a
complaint to the Ombudsman. Information about how to do this is available
at [2]www.ombudsman.parliament.nz or by phoning 0800 802 602.
Ngā mihi
Government Services
Health New Zealand | Te Whatu Ora
Statement of confidentiality: This email message and any accompanying
attachments may contain information that is IN-CONFIDENCE and subject to
legal privilege. If you are not the intended recipient, do not read, use,
disseminate, distribute or copy this message or attachments. If you have
received this message in error, please notify the sender immediately and
delete this message
References
Visible links
1. mailto:[email address]
2. file:///tmp/
From: Rodney Parsons
Dear hnzOIA,
Please provide the minutes of Te Whatu Ora board/commissioner meetings. Provide the minutes of the national clinical governance committee meetings.
Yours sincerely,
Rodney Parsons
From: hnzOIA
Tēnā koe,
Thank you for contacting Health NZ, Te Whatu Ora. This is an automatic
reply to confirm that we have received your email. Depending on the
nature of your request you may not receive a response for up to 20 working
days. We will try to respond to your query as quickly as possible.
Ngā mihi
Health NZ, Te Whatu Ora.
------------------- Original Message -------------------
From: Rodney Parsons <[FOI #29577 email]>;
Received: Mon Feb 03 2025 01:23:36 GMT+1300 (New Zealand Daylight Time)
To: hnzOIA <[email address]>; HNZ OIA
<[email address]>;
Subject: Re: Response to your request for information, ref: HNZ00075608
CRM:0359310
Dear hnzOIA,
Please provide the minutes of Te Whatu Ora board/commissioner meetings.
Provide the minutes of the national clinical governance committee
meetings.
Yours sincerely,
Rodney Parsons
-----Original Message-----
Kia ora Rodney,
Thank you for your request for information on 17 December 2024. Please
find attached our response to your request.
If you have any questions, please get in touch at
[1][email address].
If you are not happy with this response, you have the right to make a
complaint to the Ombudsman. Information about how to do this is available
at [2]https://aus01.safelinks.protection.outlo...
or by phoning 0800 802 602.
Ngā mihi
Government Services
Health New Zealand | Te Whatu Ora
Statement of confidentiality: This email message and any accompanying
attachments may contain information that is IN-CONFIDENCE and subject to
legal privilege. If you are not the intended recipient, do not read, use,
disseminate, distribute or copy this message or attachments. If you have
received this message in error, please notify the sender immediately and
delete this message
References
Visible links
1. [1]mailto:[email address]
2. [2]file:///tmp/
-------------------------------------------------------------------
Please use this email address for all replies to this request:
[FOI #29577 email]
Disclaimer: This message and any reply that you make will be published on
the internet. Our privacy and copyright policies:
[3]https://aus01.safelinks.protection.outlo...
If you find this service useful as an Official Information officer, please
ask your web manager to link to us from your organisation's OIA or LGOIMA
page.
-------------------------------------------------------------------
Statement of confidentiality: This email message and any accompanying
attachments may contain information that is IN-CONFIDENCE and subject to
legal privilege. If you are not the intended recipient, do not read, use,
disseminate, distribute or copy this message or attachments. If you have
received this message in error, please notify the sender immediately and
delete this message
References
Visible links
1. mailto:[email
2. file:///tmp/
3. https://fyi.org.nz/help/officers
hide quoted sections
From: hnzOIA
Kia ora Rodney,
Thank you for your request for official information, received on 3
February 2025 for:
“Please provide the minutes of Te Whatu Ora board/commissioner meetings.
Provide the minutes of the national clinical governance committee
meetings”
Please note, we have undertaken initial scoping of your request with our
subject matter experts who have advised that the second part of your
request requires refining. This is because, as ithe second part of your
request stands, it will entail substantial collation to provide all
minutes of the national clinical governance meetings. We propose an
amendment of your request, to the last four sets of minutes of the
national clinical governance meetings.
We appreciate you are under no obligation to amend your request, but
requests that require substantial collation may be refused under section
18(f) of the OIA. We want to work with you to avoid this and ensure we are
able to provide a response that best meets your needs.
Please let us know before 21 February 2025 whether you are prepared to
amend or clarify your request and, if so, how.
We look forward to receiving your response.
Ngâ mihi
Government Services
Health New Zealand | Te Whatu Ora
Statement of confidentiality: This email message and any accompanying
attachments may contain information that is IN-CONFIDENCE and subject to
legal privilege. If you are not the intended recipient, do not read, use,
disseminate, distribute or copy this message or attachments. If you have
received this message in error, please notify the sender immediately and
delete this message
From: hnzOIA
Kia ora Rodney,
Thank you for your request for information, I apologise for the delay
in providing our response. Please find attached our response to your
request.
If you have any questions, please get in touch
at [1][email address].
If you are not happy with this response, you have the right to make a
complaint to the Ombudsman. Information about how to do this is available
at [2]www.ombudsman.parliament.nz or by phoning 0800 802 602.
Ngā mihi,
Hannah
Government Services (OIA)
[3][email address]
Health New Zealand | Te Whatu Ora
Statement of confidentiality: This email message and any accompanying
attachments may contain information that is IN-CONFIDENCE and subject to
legal privilege. If you are not the intended recipient, do not read, use,
disseminate, distribute or copy this message or attachments. If you have
received this message in error, please notify the sender immediately and
delete this message
References
Visible links
1. mailto:[email address]
2. http://www.ombudsman.parliament.nz/
3. mailto:[email address]
From: Rodney Parsons
Dear hnzOIA,
Please provide all agendas and minutes for formal meetings of the board over the last 12 months.
Yours sincerely,
Rodney Parsons
From: hnzOIA
Tēnākoe,
Thank you for contacting Health New Zealand | Te Whatu Ora.
This is an automatic reply to confirm that we have received your email.
Depending on the nature of your request you may not receive a response for
up to 20 working days.
We will try to respond to your query as quickly as possible.
Ngā mihi
Health NZ | Te Whatu Ora.
Statement of confidentiality: This email message and any accompanying
attachments may contain information that is IN-CONFIDENCE and subject to
legal privilege. If you are not the intended recipient, do not read, use,
disseminate, distribute or copy this message or attachments. If you have
received this message in error, please notify the sender immediately and
delete this message
From: hnzOIA
Kia ora Rodney,
Thank you for your request for information regarding HNZ
Board/Commissioner Meeting Minutes on 31 August 2025. Please find attached
our response to your request.
If you have any questions, please get in touch at
[1][email address]
If you are not happy with this response, you have the right to make a
complaint to the Ombudsman. Information about how to do this is available
at [2]www.ombudsman.parliament.nz or by phoning 0800 802 602.
Ngā mihi,
Cassandra
Government Services
Statement of confidentiality: This email message and any accompanying
attachments may contain information that is IN-CONFIDENCE and subject to
legal privilege. If you are not the intended recipient, do not read, use,
disseminate, distribute or copy this message or attachments. If you have
received this message in error, please notify the sender immediately and
delete this message
References
Visible links
1. mailto:[email address]
2. file:///tmp/
From: Rodney Parsons
Dear hnzOIA,
Provide all board policies and terms of reference for subcommittee meetings.
Yours sincerely,
Rodney Parsons
From: hnzOIA
Tçnâ koe,
Thank you for your email.
Under the Official Information Act (OIA), agencies are required to respond
to requests for official information as soon as reasonably practicable and
no later than 20 working days after receiving them.
Please note that the period from 25 December 2025 to 15 January 2026
(inclusive) is not counted as working days under the OIA. As a result, any
OIA requests received on or after 29 November 2025 may take longer to
process than usual, as the maximum response timeframe may extend into the
new year.
If your request is for data that Health NZ holds, have you checked
[1]Lighthouse first to see if the data you are seeking is already
published?
Lighthouse is a searchable catalogue that makes a range of data and
analytics products available to New Zealanders to enable easier, faster
access to insights about health services.
You can find further information about how OIA timeframes are calculated,
including the Ombudsman’s OIA calculator, at the link below:
[2]Official information calculators | Ombudsman New Zealand
We will provide a response to your request in line with the statutory
timeframes set out in the OIA.
We appreciate your understanding and patience during this time.
Ngâ mihi,
Health NZ | Te Whatu Ora.
Statement of confidentiality: This email message and any accompanying
attachments may contain information that is IN-CONFIDENCE and subject to
legal privilege. If you are not the intended recipient, do not read, use,
disseminate, distribute or copy this message or attachments. If you have
received this message in error, please notify the sender immediately and
delete this message
References
Visible links
1. https://www.tewhatuora.govt.nz/for-healt...
2. https://www.ombudsman.parliament.nz/agen...
From: hnzOIA
Kia ora Rodney,
Thank you for your request for information regarding all HNZ board
policies and terms of reference for subcommittee meetings on 5 January
2026. Please find attached our response to your request.
If you have any questions, please get in touch at
[1][email address]
If you are not happy with this response, you have the right to make a
complaint to the Ombudsman. Information about how to do this is available
at [2]www.ombudsman.parliament.nz or by phoning 0800 802 602.
Ngā mihi
Kelly
Government Services (OIA)
[3][email address]
Health New Zealand | Te Whatu Ora
Statement of confidentiality: This email message and any accompanying
attachments may contain information that is IN-CONFIDENCE and subject to
legal privilege. If you are not the intended recipient, do not read, use,
disseminate, distribute or copy this message or attachments. If you have
received this message in error, please notify the sender immediately and
delete this message
References
Visible links
1. mailto:[email address]
2. file:///tmp/
3. mailto:[email address]
Things to do with this request
- Add an annotation (to help the requester or others)
- Download a zip file of all correspondence (note: this contains the same information already available above).