Survey of Kerikeri river by Total marine

Chris Claydon made this Official Information request to Northland Regional Council

The request was successful.

From: Chris Claydon

Dear Northland Regional Council,

A year or two ago I spoke to Total Marine staff working on a barge in Kerikeri river who told me they were carrying out a survey of the river, funded by NRC, in preparation for the mooring pile replacement programme which was originally planned for around 2015 but has still not happened.

It appears that the council has abandoned organising the pile replacement and pile owners have been left to each organise contractors to replace their own piles individually.

So that the money already spent on that survey is not entirely wasted, it would be very helpful if NRC could please make public under this LGOIMA request a complete copy of all the material (including data, documents, drawings and reports) produced by Total Marine from their survey of the river and moorings in case that data is of use to individual mooring owners wanting to replace their piles and to identify piles which may or may not need replacement.

For any data files please provide both the original machine-readable data formats (CSV, vector graphic, spreadsheet, etc.) and a human-readable PDF or JPEG version.

If the council has similar/relevant information from sources other than Total marine or generated within the council (including internal documents and correspondence about the pile replacement) then please include that too.

I understand that some information may be withheld (such as hiding quoted prices for commercial reasons), however I ask that no document is entirely withheld - please only redact the minimum part of the document which must be redacted and disclose the rest of it.

Yours faithfully,

Chris Claydon

Link to this

From: mailroom
Northland Regional Council

Kia ora

Thank you for contacting the Northland Regional Council.

Our hours of work are 8am to 4.30pm Monday to Friday. If you have emailed
us outside of these hours or on a public holiday, your request will be
processed on the following business day.
 
If you are contacting us regarding an environmental incident or maritime
incident, please phone the Environmental Hotline 0800 504 639.

Link to this

From: mailroom
Northland Regional Council


Attachment image001.jpg
31K Download


Morena Chris,

 

Your request has been received, accepted and sent through to the Maritime
Department for their reply.

 

Please note your reference number of REQ.619181 and please quote this
number for further information or if you wish to withdraw this LGOIMA.

 

Ngā mihi

Stephanie Calder

Customer Services/Mailroom Officer
Northland Regional Council  »  Te Kaunihera ā rohe o Te Taitokerau

 

DDI 09 4701098

[1][IMG]

 

Disclaimer
Users are reminded that Northland Regional Council data is provided in
good faith and is valid at the date of publication. However, data may
change as additional information becomes available. For this reason,
information provided here is intended for short-term use only. Users are
advised
to check figures are still valid for any future projects and should
carefully consider the accuracy/quality of information provided before
using it for decisions that concern personal or public safety. Similar
caution should be applied for the conduct of business that involves
monetary or opera-
tional consequences. The Northland Regional Council, its employees and
external suppliers of data, while providing this information in good
faith, accept no responsibility for any loss, damage, injury in value to
any person, service or otherwise resulting from its use. All data provided
is in NZ
Standard Time. During daylight saving, data is one hour behind NZ Daylight
Time.

 

From: Chris Claydon <[FOI #25611 email]>
Sent: Friday, February 2, 2024 10:31 PM
To: mailroom <[email address]>
Subject: LGOIMA REQ.619181 Claydon C Information Request Kerikeri River
Survey by Total Marine 2015 20240202

 

Dear Northland Regional Council,

A year or two ago I spoke to Total Marine staff working on a barge in
Kerikeri river who told me they were carrying out a survey of the river,
funded by NRC, in preparation for the mooring pile replacement programme
which was originally planned for around 2015 but has still not happened.

It appears that the council has abandoned organising the pile replacement
and pile owners have been left to each organise contractors to replace
their own piles individually.

So that the money already spent on that survey is not entirely wasted, it
would be very helpful if NRC could please make public under this LGOIMA
request a complete copy of all the material (including data, documents,
drawings and reports) produced by Total Marine from their survey of the
river and moorings in case that data is of use to individual mooring
owners wanting to replace their piles and to identify piles which may or
may not need replacement.

For any data files please provide both the original machine-readable data
formats (CSV, vector graphic, spreadsheet, etc.) and a human-readable PDF
or JPEG version.

If the council has similar/relevant information from sources other than
Total marine or generated within the council (including internal documents
and correspondence about the pile replacement) then please include that
too.

I understand that some information may be withheld (such as hiding quoted
prices for commercial reasons), however I ask that no document is entirely
withheld - please only redact the minimum part of the document which must
be redacted and disclose the rest of it.

Yours faithfully,

Chris Claydon

-------------------------------------------------------------------

This is an Official Information request made via the FYI website.

Please use this email address for all replies to this request:
[2][FOI #25611 email]

Is [3][Northland Regional Council request email] the wrong address for Official Information
requests to Northland Regional Council? If so, please contact us using
this form:
[4]https://fyi.org.nz/change_request/new?bo...

Disclaimer: This message and any reply that you make will be published on
the internet. Our privacy and copyright policies:
[5]https://fyi.org.nz/help/officers

If you find this service useful as an Official Information officer, please
ask your web manager to link to us from your organisation's OIA or LGOIMA
page.

-------------------------------------------------------------------

References

Visible links
1. https://www.nrc.govt.nz/
2. mailto:[FOI #25611 email]
3. mailto:[Northland Regional Council request email]
4. https://fyi.org.nz/change_request/new?bo...
5. https://fyi.org.nz/help/officers

Link to this

From: Jim Lyle
Northland Regional Council


Attachment Daily Report 20210301.pdf
154K Download View as HTML

Attachment Daily Report 20210302.pdf
149K Download View as HTML

Attachment Daily Report 20210225.pdf
135K Download View as HTML

Attachment Daily Report 20210226.pdf
152K Download View as HTML


 

Dear Mr Claydon

 

REQUEST FOR OFFICIAL INFORMATION

 

I refer to your request for information contained in your email of 2^nd
February 2024.

 

Your request for information relating to the survey carried out by Total
Marine of the Kerikeri River under the Local Government Official
Information and Meetings Act 1987 (LGOIMA) has been considered and
granted.  Please find enclosed the following:

 

o All reports received from the survey undertaken in 2021. This survey
was of the riverbed substrate in which existing piles are embedded.

 

Regarding your request for all internal documents and internal
correspondence about the pile replacement, this would take substantial
collation and a charge will apply due to the amount of resource required
to process this request. The Regional Council holds many years of records
under individual files. In the interests of providing information quickly,
and of use, if you can be more specific about what would be helpful for
you in relation to your pile mooring that may be faster to provide.

 

The pile replacement project has been delayed due to complications
regarding consents, the ownership structure of piles, and contractor
availability. Options are still being looked at but the difficulties in
predicting accurate costs, along with owner’s abilities or wish to commit
are causing difficulties in moving forward.

 

Ngâ mihi

Jim Lyle| Regional Harbourmaster
Northland Regional Council | Te Kaunihera A Rohe O Te Taitokerau
P Please think of the environment before printing this email

 

 

 

 

 

From: Chris Claydon <[1][FOI #25611 email]>
Sent: Friday, February 2, 2024 10:31 PM
To: mailroom <[2][email address]>
Subject: LGOIMA REQ.619181 Claydon C Information Request Kerikeri River
Survey by Total Marine 2015 20240202

 

Dear Northland Regional Council,

A year or two ago I spoke to Total Marine staff working on a barge in
Kerikeri river who told me they were carrying out a survey of the river,
funded by NRC, in preparation for the mooring pile replacement programme
which was originally planned for around 2015 but has still not happened.

It appears that the council has abandoned organising the pile replacement
and pile owners have been left to each organise contractors to replace
their own piles individually.

So that the money already spent on that survey is not entirely wasted, it
would be very helpful if NRC could please make public under this LGOIMA
request a complete copy of all the material (including data, documents,
drawings and reports) produced by Total Marine from their survey of the
river and moorings in case that data is of use to individual mooring
owners wanting to replace their piles and to identify piles which may or
may not need replacement.

For any data files please provide both the original machine-readable data
formats (CSV, vector graphic, spreadsheet, etc.) and a human-readable PDF
or JPEG version.

If the council has similar/relevant information from sources other than
Total marine or generated within the council (including internal documents
and correspondence about the pile replacement) then please include that
too.

I understand that some information may be withheld (such as hiding quoted
prices for commercial reasons), however I ask that no document is entirely
withheld - please only redact the minimum part of the document which must
be redacted and disclose the rest of it.

Yours faithfully,

Chris Claydon

-------------------------------------------------------------------

This is an Official Information request made via the FYI website.

Please use this email address for all replies to this request:
[3][FOI #25611 email]

Is [4][Northland Regional Council request email] the wrong address for Official Information
requests to Northland Regional Council? If so, please contact us using
this form:
[5]https://fyi.org.nz/change_request/new?bo...

Disclaimer: This message and any reply that you make will be published on
the internet. Our privacy and copyright policies:
[6]https://fyi.org.nz/help/officers

If you find this service useful as an Official Information officer, please
ask your web manager to link to us from your organisation's OIA or LGOIMA
page.

-------------------------------------------------------------------

References

Visible links
1. mailto:[FOI #25611 email]
2. mailto:[email address]
3. mailto:[FOI #25611 email]
4. mailto:[Northland Regional Council request email]
5. https://fyi.org.nz/change_request/new?bo...
6. https://fyi.org.nz/help/officers

Link to this

From: Chris Claydon

Hi Jim,

Thanks very much for your response, this contains the information I was looking for so I don't require anything more thanks.

I'm sure the data on the depth of mud and rock at each pile position will be very useful indeed so that individual mooring owners can obtain quotes for their own pile replacement and so that piling contractors can purchase the right materials in advance, including the right length piles without wastage - piling for rock costs a lot more and requires different equipment and materials so this is helpful.

Perhaps you could contact other mooring owners and mooring contractors to direct them to this response on the FYI website as I am not in touch with all of them? It's posted in public here:
https://fyi.org.nz/request/25611

For the benefit of other readers of these documents, I have checked some of the GPS positions and it looks like "Row 1" is the row opposite the Electric Boat Company marina in Kerikeri River, upstream of the Waipapa Stream junction. The pile numbering appears to start at the downstream end of that row. It looks like they then worked their way upstream from here towards the Stone Store wharf numbering the piles and rows in order.

Many thanks and best regards,
Chris

Link to this

Things to do with this request

Anyone:
Northland Regional Council only: