Costs for the development of the Cobbler/Davenport/Abraham & Williams Buildings in Marton for Council's adminitrative centre and town library
Robert Snijders made this Official Information request to Rangitikei District Council
The request was successful.
      From: Robert Snijders
      
    
    Dear Rangitikei District Council,
Please provide the costs, including the peer review, referred to on page 78 of the Order Papers for the Council Meeting dated the 30th of March 2017.
To assist, the reference is made in the Top Ten Projects Memorandum issued by Ross McNeil. The paragraph starts "The costs have now peen peer-reviewed. Given ...".
Yours faithfully,
Robert Snijders
        From: Carol Downs
        Rangitikei District Council
      
    
    We have received your Official Information Act request. As required under the provisions of the Local Government Official Information Act your request will be responded to within 20 working days.
Regards
| Carol Downs| Executive Officer|
| Rangitikei District Council | 46 High Street, Private Bag 1102, Marton 4741 |
| P 06 327 0163 or 0800 422 522 | F 06 327 6970 | M 027 541 2523| www.rangitikei.govt.nz |
show quoted sections
        From: Carol Downs
        Rangitikei District Council
      
    
    Good afternoon Robert, we realise our OIA response is due to you today, we
 will have this information to you tomorrow.
 
Regards
 
Carol
 
| Carol Downs| Executive Officer|
| Rangitikei District Council | 46 High Street, Private Bag 1102, Marton
 4741 |
| P 06 327 0163 or 0800 422 522 | F 06 327 6970 | M 027 541 2523|
 [1]www.rangitikei.govt.nz |
 
If you have received this email and any attachments to it in error, please
 take no action based on it, copy it or show it to anyone.  Please advise
 the sender and delete your copy.  Thank you.
References
Visible links
 1. http://www.rangitikei.govt.nz/
        From: Carol Downs
        Rangitikei District Council
      
    
    Good morning Robert
 
Here is our response to your official information act request:
 
The following table sets out the indicative costs for the 3 options as
 presented in the 2017/18 Annual Plan Consultation Document, plus two
 additional option variations:
 
Option Gross Opus/Rawlinson Colspec
 Floor Area
 Initial estimate Peer
 (Sq review/estimate
 metres)
 Retain all buildings - 2096 $9.2M $13.8M
 strengthen/upgrade to IL2 and
 IL4 (CDEM building)
 Demolish all and build new 2000 $11.4M $10.5M
 Retain all facades, new build 2000 Not costed $10.8M
 behind
 Retain all facades and retain 2096 $10.3M $13.5M
 all buildings except Cobbler
 A. Demolish Cobbler A (retain
 façade) and build new CDEM
 building (IL4), with rest of
 the buildings
 strengthened/refurbished to
 IL2
 Retain all facades and 2042 $11.8M $12.3M
 buildings except Cobbler A.
 Demolish Cobbler A completely
 and build new CDEM building
 (IL4), with rest of the
 buildings
 strengthened/refurbished to
 IL2
Note: Cobbler A refers to the section of the Cobbler Building to the left
 of the High Street accessway
 
The above cost estimates include the following components:
1.       Demolition and removal as appropriate for the option
2.       Provision of retail space (shells)
3.       Fit out of the Council/Library areas
4.       Provision of canopies to street frontage
5.       Courtyard area
6.       Carparking and vehicle access
7.       Provision for part of the building to be constructed/strengthened
 to IL4 rating
8.       Design and estimating contingency
9.       Professional fees and consents
 
Regards
 
| Carol Downs| Executive Officer|
| Rangitikei District Council | 46 High Street, Private Bag 1102, Marton
 4741 |
| P 06 327 0163 or 0800 422 522 | F 06 327 6970 | M 027 541 2523|
 [1]www.rangitikei.govt.nz |
 
 
show quoted sections
Things to do with this request
- Add an annotation (to help the requester or others)
 - Download a zip file of all correspondence (note: this contains the same information already available above).
 