We don't know whether the most recent response to this request contains information or not – if you are Thorndon Residents' Association please sign in and let everyone know.

Copies of Bike Network Thorndon connections plans i.e. current versions of the detailed layout drawings

Thorndon Residents' Association made this Official Information request to Wellington City Council

This request has an unknown status. We're waiting for Thorndon Residents' Association to read a recent response and update the status.

From: Thorndon Residents' Association

Dear Wellington City Council,

Please provide a digital copy of EVERY, or any, engineering drawing that details the present state-of-play regarding proposed layout changes being considered for all the streets that form any part of the proposed Thorndon connections routes of the Bike Network.

That is, all the routes outlined on this WCC page:
https://www.transportprojects.org.nz/cur...

Timing:
Please supply on 1 February 2023, otherwise please provide BEFORE 7th February 2023

The Association appreciates that the drawings will have a 'draft' status, being a work-in-progress.

Preferred format: PDF

Yours faithfully,

Thorndon Residents' Association

Link to this

From: BUS: Assurance
Wellington City Council

Tçnâ koe Thorndon Residents' Association

Thank you for your email dated 31 January 2023 requesting information.

Our team will manage your request under the Local Government Official Information and Meetings Act 1987 which requires us to provide a decision as soon as possible, but no later than 1 March 2023, being 20 working days of receipt.

I note that you have requested this information before 7 February 2023 – whilst we will endeavour to get this information to you as soon as possible, in order for us to assess whether it is appropriate for us to priorities this over other requests can you please provide a reason for this urgency?

The reference number for your request is IRC-4394

Please contact us if you have any further questions.

Kind regards

The Assurance Team
Email: [email address]
Wellington City Council | W Wellington.govt.nz | |

The information contained in this email is privileged and confidential and intended for the addressee only.
If you are not the intended recipient, you are asked to respect that confidentiality and not disclose, copy or make use of its contents.
If received in error you are asked to destroy this email and contact the sender immediately. Your assistance is appreciated.

Link to this

Thorndon Residents' Association left an annotation ()

The Association has been patient in this matter.

Association representatives viewed these plans on 4 November 2022. Advice received at that time was that the design was 30% complete and some updates were imminent. The expectation was set then that the Association would see updates in the near future.

The Association's position then, that it clearly established its information need (request) on 4 Nov. 2022, in a face-to-face meeting of representatives and WCC officers.

Two months on, the outstanding updates are 'urgent' as the Association has related priorities scheduled.

The Association trusts that PDF's can be uploaded today.

Link to this

From: Thorndon Residents' Association

Dear BUS: Assurance,

Additional to the annotation appended to this information request.

The Association has sound reasons to expect priority for this information request.
It arises from not responding to prior oral requests. This is a 'reminder' in writing. Hence the Association requests that this is now treated as a priority.

The desire for this information, updated, was signaled on 4 November 2022 i.e. 90 calendar days ago, (60 workdays). Clearly the plans are available, as representatives viewed them early in November last year.

The Association wishes to receive the PDF's well BEFORE commencement of the next business week.

Please upload the PDF's by COB tomorrow, Friday 3 February 2023 so that members can access them this weekend.

Yours sincerely,

Thorndon Residents' Association

Link to this

From: BUS: Assurance
Wellington City Council


Attachment IRC 4394 Thorndon Bike Network.pdf
622K Download View as HTML


Kia ora Thorndon Resident's Association,

Please see attached response to your request.

Please also note that we do not receive notifications of annotations on the FYI website.

I hope you enjoy the long weekend.

Ngā mihi
Claudia

Claudia Holgate
Senior Advisor | Official Information Team

-----Original Message-----
From: Thorndon Residents' Association <[FOI #21683 email]>
Sent: Thursday, 2 February 2023 5:28 pm
To: BUS: Assurance <[email address]>
Subject: Re: IRC-4394: Official Information request - Copies of Bike Network Thorndon connections plans i.e. current versions of the detailed layout drawings

Dear BUS: Assurance,

Additional to the annotation appended to this information request.

The Association has sound reasons to expect priority for this information request.
It arises from not responding to prior oral requests. This is a 'reminder' in writing. Hence the Association requests that this is now treated as a priority.

The desire for this information, updated, was signaled on 4 November 2022 i.e. 90 calendar days ago, (60 workdays). Clearly the plans are available, as representatives viewed them early in November last year.

The Association wishes to receive the PDF's well BEFORE commencement of the next business week.

Please upload the PDF's by COB tomorrow, Friday 3 February 2023 so that members can access them this weekend.

Yours sincerely,

Thorndon Residents' Association

-----Original Message-----

Tçnâ koe Thorndon Residents' Association

Thank you for your email dated 31 January 2023 requesting information.

Our team will manage your request under the Local Government Official Information and Meetings Act 1987 which requires us to provide a decision as soon as possible, but no later than 1 March 2023, being 20 working days of receipt.

I note that you have requested this information before 7 February 2023 – whilst we will endeavour to get this information to you as soon as possible, in order for us to assess whether it is appropriate for us to priorities this over other requests can you please provide a reason for this urgency?

The reference number for your request is IRC-4394

Please contact us if you have any further questions.

Kind regards

The Assurance Team
Email: [email address]
Wellington City Council | W Wellington.govt.nz | |

The information contained in this email is privileged and confidential and intended for the addressee only.
If you are not the intended recipient, you are asked to respect that confidentiality and not disclose, copy or make use of its contents.
If received in error you are asked to destroy this email and contact the sender immediately. Your assistance is appreciated.

-------------------------------------------------------------------
Please use this email address for all replies to this request:
[FOI #21683 email]

Disclaimer: This message and any reply that you make will be published on the internet. Our privacy and copyright policies:
https://aus01.safelinks.protection.outlo...

If you find this service useful as an Official Information officer, please ask your web manager to link to us from your organisation's OIA or LGOIMA page.

-------------------------------------------------------------------

hide quoted sections

Link to this

From: Thorndon Residents' Association

Dear Claudia Holgate,

The Association asked for drawings that detail the "present state of play"

Thank you for supplying documents (drawings) on Friday that reflect detail as of December 2022.
WCC advises that these drawings do not alone reflect the current state of play because a road safety audit has required significant changes to the designs and that these have been made "as a result of ... ongoing discussions with ... key stakeholders in the area."

The Association requests:

- a copy of the Road Safety audit on the basis that WCC advise that it contains information relevant to the present state of play and details on the drawings supplied.

- a list of all "key stakeholders in the area", by name and/or address, that WCC ever has had, or is currently having, discussions with concerning street layout design details i.e. stakeholders who have seen the detail.

- respectfully, that the Association is regarded and treated as a qualifying 'key stakeholder in the area', and therefore included in well facilitated discussions (workshops etc) about the design DETAILS, as well as any significant changes being proposed.

Yours sincerely,

Thorndon Residents' Association Inc

Link to this

From: BUS: Assurance
Wellington City Council

Kia ora,

Thank you for your email dated 06 February requesting information.

Our team will manage your request under the Local Government Official Information and Meetings Act 1987 which requires us to provide a decision as soon as possible, but no later than 06 March 2023, being 20 working days of receipt.

The reference number for your request is IRC-4404

Please contact us if you have any further questions.

Kind regards

The Assurance Team
Email: [email address]
Wellington City Council | W Wellington.govt.nz |

-----Original Message-----
From: Thorndon Residents' Association <[FOI #21683 email]>
Sent: Monday, 6 February 2023 11:20 pm
To: BUS: Assurance <[email address]>
Subject: RE: IRC-4394: Official Information request - Copies of Bike Network Thorndon connections plans i.e. current versions of the detailed layout drawings

Dear Claudia Holgate,

The Association asked for drawings that detail the "present state of play"

Thank you for supplying documents (drawings) on Friday that reflect detail as of December 2022.
WCC advises that these drawings do not alone reflect the current state of play because a road safety audit has required significant changes to the designs and that these have been made "as a result of ... ongoing discussions with ... key stakeholders in the area."

The Association requests:

- a copy of the Road Safety audit on the basis that WCC advise that it contains information relevant to the present state of play and details on the drawings supplied.

- a list of all "key stakeholders in the area", by name and/or address, that WCC ever has had, or is currently having, discussions with concerning street layout design details i.e. stakeholders who have seen the detail.

- respectfully, that the Association is regarded and treated as a qualifying 'key stakeholder in the area', and therefore included in well facilitated discussions (workshops etc) about the design DETAILS, as well as any significant changes being proposed.

Yours sincerely,

Thorndon Residents' Association Inc

-----Original Message-----

Kia ora Thorndon Resident's Association,

Please see attached response to your request.

Please also note that we do not receive notifications of annotations on the FYI website.

I hope you enjoy the long weekend.

Ngā mihi
Claudia

Claudia Holgate
Senior Advisor | Official Information Team

-------------------------------------------------------------------
Please use this email address for all replies to this request:
[FOI #21683 email]

Disclaimer: This message and any reply that you make will be published on the internet. Our privacy and copyright policies:
https://aus01.safelinks.protection.outlo...

If you find this service useful as an Official Information officer, please ask your web manager to link to us from your organisation's OIA or LGOIMA page.

-------------------------------------------------------------------

hide quoted sections

Link to this

From: Thorndon Residents' Association

Dear BUS: Assurance,

The letter dated 3 February 2023 which accompanied the plans advised:
' We can provide you with the updated plans when we receive them later in February.'

The Association respectfully requests the 'updated plans' please.

Please also supply a copy of the Safety Audit report for these updated designs.

Receipt of the updated plans (in particular) before 4:30PM on Monday 27 February 2023 would enable the latest design details to inform the discussions that day.

Yours sincerely,
Thorndon Residents' Association

PS
The Safety Audit report related to the December versions of the plans has yet to be supplied as requested. There are elevated concerns that fifteen (15) business days passed since the Association's confirmed request for this associated information.

Link to this

From: BUS: Assurance
Wellington City Council


Attachment IRC 4404 Thorndon Residents.pdf
626K Download View as HTML

Attachment Thorndon90 RSA Final 1.pdf
1.6M Download View as HTML

Attachment Thorndon 30 CASA Final 2.pdf
2.1M Download View as HTML


Kia ora,

Please see attached response to your LGOIMA request.

Nga mihi,

Claudia

Claudia Holgate
Senior Advisor Official Information Team
Te Kaunihera o Pōneke Wellington City Council

-----Original Message-----
From: Thorndon Residents' Association <[FOI #21683 email]>
Sent: Monday, 6 February 2023 11:20 pm
To: BUS: Assurance <[email address]>
Subject: RE: IRC-4394: Official Information request - Copies of Bike Network Thorndon connections plans i.e. current versions of the detailed layout drawings

Dear Claudia Holgate,

The Association asked for drawings that detail the "present state of play"

Thank you for supplying documents (drawings) on Friday that reflect detail as of December 2022.
WCC advises that these drawings do not alone reflect the current state of play because a road safety audit has required significant changes to the designs and that these have been made "as a result of ... ongoing discussions with ... key stakeholders in the area."

The Association requests:

- a copy of the Road Safety audit on the basis that WCC advise that it contains information relevant to the present state of play and details on the drawings supplied.

- a list of all "key stakeholders in the area", by name and/or address, that WCC ever has had, or is currently having, discussions with concerning street layout design details i.e. stakeholders who have seen the detail.

- respectfully, that the Association is regarded and treated as a qualifying 'key stakeholder in the area', and therefore included in well facilitated discussions (workshops etc) about the design DETAILS, as well as any significant changes being proposed.

Yours sincerely,

Thorndon Residents' Association Inc

-----Original Message-----

Kia ora Thorndon Resident's Association,

Please see attached response to your request.

Please also note that we do not receive notifications of annotations on the FYI website.

I hope you enjoy the long weekend.

Ngā mihi
Claudia

Claudia Holgate
Senior Advisor | Official Information Team

-------------------------------------------------------------------
Please use this email address for all replies to this request:
[FOI #21683 email]

Disclaimer: This message and any reply that you make will be published on the internet. Our privacy and copyright policies:
https://aus01.safelinks.protection.outlo...

If you find this service useful as an Official Information officer, please ask your web manager to link to us from your organisation's OIA or LGOIMA page.

-------------------------------------------------------------------

hide quoted sections

Link to this

From: BUS: Assurance
Wellington City Council

Kia ora

Thank you for your request made under the Local Government Official Information and Meetings Act 1987 (the Act). You requested the below information:

The Association respectfully requests the 'updated plans' please.

Please also supply a copy of the Safety Audit report for these updated designs.

Receipt of the updated plans (in particular) before 4:30PM on Monday 27 February 2023 would enable the latest design details to inform the discussions that day.

Wellington City Council has refused your request for information.

The plans are in the final stages of confirmation and will be made available to the public on Monday 6 March when consultation opens. Feedback will be open from 6-27 March.

There will be a webinar on Thursday 9 March to talk through the proposals and answer questions.

We are therefore refusing your request under section 17(d) of the Act as the information will soon be publicly available at the below address.
https://www.transportprojects.org.nz/cur...

Right of review
If you are not satisfied with the Council’s response, you may request the Office of the Ombudsman to investigate the Council’s decision. Further information is available on the Ombudsman website, www.ombudsman.parliament.nz.

Ngâ mihi
Claudia

Claudia Holgate
Senior Advisor | Official Information Team

-----Original Message-----
From: Thorndon Residents' Association <[FOI #21683 email]>
Sent: Friday, 24 February 2023 8:27 pm
To: BUS: Assurance <[email address]>
Subject: RE: IRC-4394: Official Information request - Copies of Bike Network Thorndon connections plans i.e. current versions of the detailed layout drawings

Dear BUS: Assurance,

The letter dated 3 February 2023 which accompanied the plans advised:
' We can provide you with the updated plans when we receive them later in February.'

The Association respectfully requests the 'updated plans' please.

Please also supply a copy of the Safety Audit report for these updated designs.

Receipt of the updated plans (in particular) before 4:30PM on Monday 27 February 2023 would enable the latest design details to inform the discussions that day.

Yours sincerely,
Thorndon Residents' Association

PS
The Safety Audit report related to the December versions of the plans has yet to be supplied as requested. There are elevated concerns that fifteen (15) business days passed since the Association's confirmed request for this associated information.

-----Original Message-----

Kia ora,

Thank you for your email dated 06 February requesting information.

Our team will manage your request under the Local Government Official Information and Meetings Act 1987 which requires us to provide a decision as soon as possible, but no later than 06 March 2023, being 20 working days of receipt.

The reference number for your request is IRC-4404

Please contact us if you have any further questions.

Kind regards

The Assurance Team
Email: [email address]
Wellington City Council | W Wellington.govt.nz |

-------------------------------------------------------------------
Please use this email address for all replies to this request:
[FOI #21683 email]

Disclaimer: This message and any reply that you make will be published on the internet. Our privacy and copyright policies:
https://aus01.safelinks.protection.outlo...

If you find this service useful as an Official Information officer, please ask your web manager to link to us from your organisation's OIA or LGOIMA page.

-------------------------------------------------------------------

hide quoted sections

Link to this

From: Thorndon Residents' Association

Dear BUS: Assurance,

Thank you for your letter dated 27 February 2023, file ref: IRC-4404

The information requested has NOT been supplied.

WCC's response letter merely lists stakeholders identified for the project who have been communicated with by a letter drop, or an officer greeting, or perhaps an email (or combinations thereof).

The Association specifically requested the list of all "key stakeholders in the area" (i.e. affected persons or entities) who have had discussions (consultation) concerning 'STREET LAYOUT DESIGN DETAILS' i.e. consulted on ALL the known DETAIL of the street layout proposals in the area.

Such affected people would have seen and discussed the latest detailed layout plans available at the time (e.g. the 90% design drawings from December 2022) so that they could fully interpret the detail of the scope of the proposals, and be informed adequately to appraise (in detail) any likely impacts arising for them, or others. Accordingly they would have been empowered to communicate matters arising from the detail to WCC during the 'discovery' phase of the Thorndon Connections project.

The Association looks forward to receiving the information originally requested please i.e. who, among the key stakeholders in the area, was consulted on STREET LAYOUT DESIGN DETAILS?
Some examples of the manner in which such DESIGN DETAIL was provisioned to these stakeholders would be appreciated please.

Yours sincerely,
Thorndon Residents' Association

Link to this

From: BUS: Assurance
Wellington City Council


Attachment Thorndon Residents stakeholder.pdf
590K Download View as HTML


Kia ora Thorndon Residents Association,

Thank you for your email. Please see the attached response.

Nga mihi,

Claudia

-----Original Message-----
From: Thorndon Residents' Association <[FOI #21683 email]>
Sent: Thursday, 2 March 2023 10:29 pm
To: BUS: Assurance <[email address]>
Subject: RE: IRC-4394: Official Information request - Copies of Bike Network Thorndon connections plans i.e. current versions of the detailed layout drawings

Dear BUS: Assurance,

Thank you for your letter dated 27 February 2023, file ref: IRC-4404

The information requested has NOT been supplied.

WCC's response letter merely lists stakeholders identified for the project who have been communicated with by a letter drop, or an officer greeting, or perhaps an email (or combinations thereof).

The Association specifically requested the list of all "key stakeholders in the area" (i.e. affected persons or entities) who have had discussions (consultation) concerning 'STREET LAYOUT DESIGN DETAILS' i.e. consulted on ALL the known DETAIL of the street layout proposals in the area.

Such affected people would have seen and discussed the latest detailed layout plans available at the time (e.g. the 90% design drawings from December 2022) so that they could fully interpret the detail of the scope of the proposals, and be informed adequately to appraise (in detail) any likely impacts arising for them, or others. Accordingly they would have been empowered to communicate matters arising from the detail to WCC during the 'discovery' phase of the Thorndon Connections project.

The Association looks forward to receiving the information originally requested please i.e. who, among the key stakeholders in the area, was consulted on STREET LAYOUT DESIGN DETAILS?
Some examples of the manner in which such DESIGN DETAIL was provisioned to these stakeholders would be appreciated please.

Yours sincerely,
Thorndon Residents' Association

-----Original Message-----

Kia ora

Thank you for your request made under the Local Government Official Information and Meetings Act 1987 (the Act). You requested the below information:

The Association respectfully requests the 'updated plans' please.

Please also supply a copy of the Safety Audit report for these updated designs.

Receipt of the updated plans (in particular) before 4:30PM on Monday 27 February 2023 would enable the latest design details to inform the discussions that day.

Wellington City Council has refused your request for information.

The plans are in the final stages of confirmation and will be made available to the public on Monday 6 March when consultation opens. Feedback will be open from 6-27 March.

There will be a webinar on Thursday 9 March to talk through the proposals and answer questions.

We are therefore refusing your request under section 17(d) of the Act as the information will soon be publicly available at the below address.
https://aus01.safelinks.protection.outlo...

Right of review
If you are not satisfied with the Council's response, you may request the Office of the Ombudsman to investigate the Council's decision. Further information is available on the Ombudsman website, https://aus01.safelinks.protection.outlo....

Ngâ mihi
Claudia

Claudia Holgate
Senior Advisor | Official Information Team

-------------------------------------------------------------------
Please use this email address for all replies to this request:
[FOI #21683 email]

Disclaimer: This message and any reply that you make will be published on the internet. Our privacy and copyright policies:
https://aus01.safelinks.protection.outlo...

If you find this service useful as an Official Information officer, please ask your web manager to link to us from your organisation's OIA or LGOIMA page.

-------------------------------------------------------------------

hide quoted sections

Link to this

From: Thorndon Residents' Association

Dear BUS: Assurance,
Attn: Claudia Holgate

Dear Claudia

Thank you for your letter which highlights in yellow the stakeholders WCC met with (either online or in person) concerning the Thorndon Connections project.

The Association's information request also requested other information, being examples of the manner in which such DESIGN DETAIL was provisioned to, and discussed with, these stakeholders.

Your letter would indicate, broadly, that some detailed designs were revealed, and only for specific areas around some premises; not the whole route. However, your letter also advises that discussions were also held on the overall project area as well.

Unfortunately the generality of the response is unhelpful. It does not reveal the actual information shared under the auspices of 'consultation', nor the actual extent of meaningful design detail discussed with each highlighted affected person/entity.

The Association specifically meant :
- the date or dates the effected persons or organisations were 'consulted' during the DISCOVERY stage of the Thorndon Connections project (the period from 1 October 2022 to 5 March 2023).

- which DESIGN DETAILS were discussed with these affected persons? i.e. which street layout design drawing VERSIONS were used in these consultations (date of drawing, title of drawing, etc? (uniquely identifying the drawing and its maturity)

- indicate whether any detailed design for the street network in their vicinity to test for combined or potential aggregated impacts to street users or street functionality and/or other affected persons in the street or adjacent streets (testing for the discovery of potential for combined bad effects).

- were any of these consultations on the design details with GROUPS of neighbours (affected persons) in the same street or vicinity? i.e. to test for combined positive or bad network effects - interactive impacts?

- which ALTERNATIVE detailed design OPTIONS were discussed with these affected persons?

- which affected persons were INVITED to present alternate detailed design options, in the spirit of consultation, during this 'discovery' period of the project?

- which affected persons were consulted on the road safety AUDIT report?

- was any other aspect of design detail provisioned or discussed with affected persons/parties. If so, what were they, and to whom of the highlighted affected parties?

Yours sincerely,

Thorndon Residents' Association

Link to this

From: BUS: Assurance
Wellington City Council

Tēnā koe

Thank you for your email dated 1 April 2023 following up on our response to your previous request.

We have logged this as a new request and will manage this under the Local Government Official Information and Meetings Act 1987 which requires us to provide a decision as soon as possible, but no later than 3 May 2023, being 20 working days of receipt.

The reference number for your request is IRC-4665.

Please contact us if you have any further questions.

Kind regards

The Assurance Team
Email: [email address]
Wellington City Council | W Wellington.govt.nz | |

The information contained in this email is privileged and confidential and intended for the addressee only.
If you are not the intended recipient, you are asked to respect that confidentiality and not disclose, copy or make use of its contents.
If received in error you are asked to destroy this email and contact the sender immediately. Your assistance is appreciated.

Link to this

From: BUS: Assurance
Wellington City Council


Attachment IRC 4665 Thorndon Connection.pdf
357K Download View as HTML


Kia ora,

Thank you kindly for your patience.

Please find attached the response to your request for information below.

Kind regards

The Assurance Team
Email: [email address]
Wellington City Council | W Wellington.govt.nz | |

The information contained in this email is privileged and confidential and intended for the addressee only.
If you are not the intended recipient, you are asked to respect that confidentiality and not disclose, copy or make use of its contents.
If received in error you are asked to destroy this email and contact the sender immediately. Your assistance is appreciated.

-----Original Message-----
From: Thorndon Residents' Association <[FOI #21683 email]>
Sent: Saturday, 1 April 2023 9:53 pm
To: BUS: Assurance <[email address]>
Subject: IRC-4394: Official Information request - Copies of Bike Network Thorndon connections plans i.e. current versions of the detailed layout drawings

Dear BUS: Assurance,
Attn: Claudia Holgate

Dear Claudia

Thank you for your letter which highlights in yellow the stakeholders WCC met with (either online or in person) concerning the Thorndon Connections project.

The Association's information request also requested other information, being examples of the manner in which such DESIGN DETAIL was provisioned to, and discussed with, these stakeholders.

Your letter would indicate, broadly, that some detailed designs were revealed, and only for specific areas around some premises; not the whole route. However, your letter also advises that discussions were also held on the overall project area as well.

Unfortunately the generality of the response is unhelpful. It does not reveal the actual information shared under the auspices of 'consultation', nor the actual extent of meaningful design detail discussed with each highlighted affected person/entity.

The Association specifically meant :
- the date or dates the effected persons or organisations were 'consulted' during the DISCOVERY stage of the Thorndon Connections project (the period from 1 October 2022 to 5 March 2023).

- which DESIGN DETAILS were discussed with these affected persons? i.e. which street layout design drawing VERSIONS were used in these consultations (date of drawing, title of drawing, etc? (uniquely identifying the drawing and its maturity)

- indicate whether any detailed design for the street network in their vicinity to test for combined or potential aggregated impacts to street users or street functionality and/or other affected persons in the street or adjacent streets (testing for the discovery of potential for combined bad effects).

- were any of these consultations on the design details with GROUPS of neighbours (affected persons) in the same street or vicinity? i.e. to test for combined positive or bad network effects - interactive impacts?

- which ALTERNATIVE detailed design OPTIONS were discussed with these affected persons?

- which affected persons were INVITED to present alternate detailed design options, in the spirit of consultation, during this 'discovery' period of the project?

- which affected persons were consulted on the road safety AUDIT report?

- was any other aspect of design detail provisioned or discussed with affected persons/parties. If so, what were they, and to whom of the highlighted affected parties?

Yours sincerely,

Thorndon Residents' Association

-----Original Message-----

Kia ora Thorndon Residents Association,

Thank you for your email. Please see the attached response.

Nga mihi,

Claudia

-------------------------------------------------------------------
Please use this email address for all replies to this request:
[FOI #21683 email]

Disclaimer: This message and any reply that you make will be published on the internet. Our privacy and copyright policies:
https://fyi.org.nz/help/officers

If you find this service useful as an Official Information officer, please ask your web manager to link to us from your organisation's OIA or LGOIMA page.

-------------------------------------------------------------------

hide quoted sections

Link to this

From: Thorndon Residents' Association

Dear BUS: Assurance,

Re: WCC's letter of 2 May 2023. Errors and misrepresentation.

- the Association does not have a record of a meeting on 25 October 2022.

- a 'focus group' on 7 February 2023 was specifically designed to AVOID structured consultation with affected parties on all the proposed DESIGN DETAILS or detailed DESIGN OPTIONS for the Thorndon Connections. Focus was merely on concepts and peripheral matters.

Yours sincerely,

Thorndon Residents' Association

Link to this

We don't know whether the most recent response to this request contains information or not – if you are Thorndon Residents' Association please sign in and let everyone know.

Things to do with this request

Anyone:
Wellington City Council only: