Transdev, Dunedin Railways, Great Journeys of NZ and FRONZ network Access Aggrements.
Awaiting classification.
Dear Steve Shields, could you please provide a physical address so we can
send you the documents requested. They are too large to email.
Kind re...
Good afternoon Miss Forest
You have requested under the OIA: Provide the total actual cost and / or
estimated cost of the cancellation of iReX p...
Proposed closure of Ava railway bridge footpath
Response by KiwiRail to Mike Mellor on .
Successful.
Good afternoon
Please find our response as per the attached.
Kind regards
Dave
Dave Allard | Senior Government Relations Advisor
DDI: 027 201 8182...
Good evening Isaac
Please find our response below.
Temporary Speed Restrictions (TSRs) are a standard maintenance tool used internationally to keep t...
Track rebuild Papakura to Pukekohe
Response by KiwiRail to Niall Robertson on .
Partially successful.
Good afternoon Niall.
Please find our response below.
As part of Stage 3b of the Rail Network Rebuild (RNR), drainage work is planned between Puhinui...
Thomas,
Thanks for contacting us.
KiwiRail monitors the condition of the rail network on an ongoing basis
through a variety of inspection...
Good afternoon Isaac
I'd like to acknowledge receipt of your official information request for information on KiwiRail’s upgrade of the Wellington Metr...
Concept Design for Rail Ro-Ro Passenger Ferry (2011)
Information not held.
Good afternoon
I am responding to your OIA request as per the below.
Unfortunately, we are declining your request under Section 18(e) - does not exis...
Good afternoon
I'd like to acknowledge receipt of your official information request for information on KiwiRail's WMUP programme of works as noted bel...
Facts regarding replacement inter-island ferry design - Emissions
Response by KiwiRail to Brent Yardley on .
Refused.
Good afternoon
Please find attached our response to your request.
Kind regards
Dave
Dave Allard | Government Relations Advisor...
Maintenance arrangements for the underpass in Waltham between Thackeray and Falsgrave Streets
Successful.
Good morning Cody
The response to this question was part of the previous letter answering your questions as you asked three queries at the same time....
Level crossing safety information for level crossings in the Wairarapa
Response by KiwiRail to Patrick Dunford on .
Successful.
This transfer expires on 2023-07-17
[1]Click 'Download images' to view images
[2][email address]
sent you rpt_4925_Northern_Carterton_230125.pdf
1...
Information relating to the track closures announced 3rd October
Response by Auckland Transport to J Turner on .
Successful.
Good afternoon
I’d like to acknowledge that we have had part of your request asking for
details on the announced rail closures transferred to Ki...
DC 4012's retirement for preservation.
Request sent to KiwiRail by Colby James on .
Becuase I know this is a state-owned enterprise and not many assets do go to preservation-wise, but since I am well aware DX 5051 is going to preser...
DC 4012's retirement for preservation.
Request sent to KiwiRail by Colby James on .
Awaiting response.
Becuase I know this is a state-owned enterprise and not many assets do go to preservation-wise, but since I am well aware DX 5051 is going to preser...
Double tracking on the NIMT between Amokura and Te Kauwhata and Ngaruawahia Bridge
Response by KiwiRail to Isaac Morrison on .
Partially successful.
Kia ora Isaac,
Please find the below in response to your official information request for
information on whether a business case was performed o...
Bridge strike issues at Main South Line Bridge 43, "Tinwald Viaduct"
Response by KiwiRail to Patrick Dunford on .
Partially successful.
Good afternoon Patrick.
I'd like to acknowledge receipt of your request - just be aware we are considering a possible transfer to Ashburton District C...
Total number of non-compliant level rail crossings and how many have been upgraded with financial support or as a joint venture with a developer
Response by KiwiRail to Jessica Dingle on .
Awaiting classification.
Good afternoon
I'd like to acknowledge receipt of your official information request for information on non-compliant rail crossings.
We received your...
License descriptions needed for map datasets on data.govt.nz
Response by KiwiRail to Patrick Dunford on .
Handled by post.
Good afternoon Patrick.
Please be advised, all datasets on this site are licenced under:
Licenses: Creative Commons Attribution 4.0 International
Ki...
Hi Sam,
Just a quick update on your OIA.
It has been transferred to the Greater Wellington Regional Council as it is looking after this project....
Good afternoon
We can advise the current version of AMICUS was put in production in 2005.
Kind regards
Dave
Dave Allard | Senior Government Relati...
Good afternoon
Thank you for your enquiry on the break costs for the ships contract with the Hyundai Mipo Dockyard.
Please be advised we are declining...
Good evening Barry
I'd like to acknowledge receipt of your official information request for information as per the below
We received your request on...
IREX: Cost expended with the ECI Contractor (Downer and HEB) between Feb 2022 and the closing of the Project
Response by KiwiRail to Adrian Sykes on .
Long overdue.
Good afternoon Adrian
I'd like to acknowledge receipt of your official information request dated 4 August 2024, for information on ECI contractor spen...
IREX: Cost expended with the engineering and design team (Jacobs and WSP) from Feb 2022 - the closing of the Project
Response by KiwiRail to Adrian Sykes on .
Awaiting classification.
Good afternoon Adrian
I'd like to acknowledge receipt of your official information request dated 4 August 2024, for information on the design team spe...