Requests similar to 'P2P Line speed' (page 2)

Further Capacity Improvements (WMUP 7)
Response by KiwiRail to T.J. Pohl on .
Successful.
Good afternoon TJ Please find the attached. We note this document is best read in conjunction with the Wellington Network Programme Business case whic...
Lincoln Road Level Crossing Incidents
Response by Christchurch City Council to Sam Jenkins on .
Successful.
Dear Sam,   Thank you for your email, received on 21.08.2023. You requested the following information, under the Local Government Official Informa...
Class AM EMU Dwell Times
Response by Auckland Transport to Harriet Gale on .
Successful.
Dear Harriet   Thank you for your email this morning.  Please accept my sincere apologies for the delay in sending this response out to you.  We h...
Good afternoon Please find the attached. Any questions, please get in touch. This information has been released under the OIA. You have the right to...
Good afternoon Wade   Please find our response to your OIA request.   Kind regards   Dave   Dave Allard  | Senior Government Relations...
Request for AT Mass Rapid Transit Criteria
Response by Auckland Transport to Tony Randle on .
Successful.
Kia ora Tony    I’ve attached the official information you asked for   On 25/11/2021  you asked for information about the Regional Land Transpo...
Good morning Cody As noted in my previous email on this one, this was answered in my letter which responded to the three OIA requests you'd asked of u...
Tēnā koe Patrick, Request for information 2023-122 I refer to your request for information dated 15 May 2023, which was received by Greater Wellin...
Hybrid trains vs other options
Response by Wellington Regional Council to Patrick Dunford on .
Successful.
Tēnā koe Patrick Request for information 2023-105 I refer to your request for information dated 30 April 2023, which was received by Greater Welli...
LCSIA for Heathcote Expressway cycleway
Response by KiwiRail to Cody C on .
Successful.
Good afternoon Cody Please find the attached which covers your three requests. Apologies for the delay. Kind regards Dave Dave Allard  | Senior Gov...
Track rebuild Papakura to Pukekohe
Response by KiwiRail to Niall Robertson on .
Partially successful.
Good afternoon Niall. Please find our response below. As part of Stage 3b of the Rail Network Rebuild (RNR), drainage work is planned between Puhinui...
Dear Harriet   Thank you for contacting Auckland Transport on 5 February 2017 requesting the Full Rail Level Crossing Removal Feasibility Report....
Link: [1]File-List Link: [2]Edit-Time-Data Hello Mr Randle   Please see attached Greater Wellington Regional Council’s response to your recent...
Parker Street level crossing and cycleway integration design delays
Response by KiwiRail to Cody C on .
Information not held.
Good afternoon Cody Please find the attached letter and corresponding documents. Any further questions please get in touch - I am following up on you...
Cattle grazing on Kiwirail land
Response by KiwiRail to Harrison on .
Refused.
Good afternoon   On 22 December 2020, you asked under the OIA;   Could I please request the following 1 - a list of locations owned by Kiwira...
Heritage Train SPAD incidents
Response by KiwiRail to Lloyd Davies on .
Information not held.
Good morning Lloyd Apologies for slightly delay, I was hoping to acknowledge and respond all in one, as I wasn't sure if we'd hold the information req...
Track conditions Swanson to Huapai
Request sent to KiwiRail by Niall Robertson on .
Long overdue.
Kia ora KiwiRail, There is a proposal for a passenger train to run shuttles from Huapai to Swanson to serve the 20,000 people of Huapai and the surrou...
Track speed
Response by KiwiRail to Grady Connell on .
Partially successful.
Good afternoon Grady Thanks for your enquiry. I have checked with our team, and there isn't such a map of the line speeds in existence I'm afraid. Whi...
Tçnâ koe   Request for information 2025-200   I refer to your request for information dated 27 June 2025, which was received by Greater Wellin...
Auckland Rapid Transit Plan
Response by Auckland Transport to Arthur Johnston on .
Reported for administrator attention.
Kia ora Arthur    On 1/02/2022 you asked about the Auckland Rapid Transit Plan (ARTP) and its investigation of rapid transit alignments in the cit...
Kaitaki Ferry Conversion Project Related to the KiwiRail Turnaround Plan
Response by KiwiRail to T.J. Pohl on .
Partially successful.
Good evening Please find the attached response and associated documents. Any questions, please feel free to get in touch with me directly. Kind reg...
Kia ora L Connolly,   We've now reviewed the details of your case (case number CAS-292101-L6N0H8 ).     Thank you for getting in touch regar...
Upper North Island Freight Story
Response by KiwiRail to Harriet Gale on .
Successful.
Good afternoon Harriet,   We refer to your request for information dated 22 June 2017 in which you ask for:   1.       Marsden Point Rail Link...
Kia ora Patrick   Please find attached the response to your request of 05 March 2023 for information under the Official Information Act 1982.  ...
Potential SH54 Improvements
Response by New Zealand Transport Agency to Josh Thompson on .
Successful.
Dear Josh   Please find attached the response to your Official Information Act request of 27 December 2016.     Regards     Official C...