We don't know whether the most recent response to this request contains information or not – if you are Andrew Jones please sign in and let everyone know.

Ross Hill Tunnel (NAL Tunnel No.7) Tunnel upgrade design reports

Andrew Jones made this Official Information request to KiwiRail

This request has an unknown status. We're waiting for Andrew Jones to read a recent response and update the status.

From: Andrew Jones

Dear KiwiRail,

We have been engaged by our client who is concerned that the recent track upgrades to the Ross Hill Tunnel (No.7) northern portal on the North Auckland Line, which as she states included lowering of the track, has increased erosion on her land adjacent to the northern portal.

We would like to review the design report regarding the upgrade to the Ross Hill Tunnel (No.7), to determine the extent of earthworks, and also what measures were taken in order to prevent erosion of the site.

Yours faithfully,

Andrew Jones

Link to this

From: Dave Allard
KiwiRail


Attachment T7 Detailed Design Report.pdf
10.0M Download View as HTML


Good afternoon

Please find the attached.
Any questions, please get in touch.

This information has been released under the OIA. You have the right to seek an investigation and review by the Ombudsman of this decision. Information about how to make a complaint is available at www.ombudsman.parliament.nz or freephone 0800 802 602.

Kind regards

Dave

Dave Allard  | Senior Government Relations Advisor
DDI: 027 201 8182
Level 4, Wellington Railway Station, Bunny Street, Wellington 6011 | PO Box 593, Wellington 6140, New Zealand

www.kiwirail.co.nz

show quoted sections

Link to this

We don't know whether the most recent response to this request contains information or not – if you are Andrew Jones please sign in and let everyone know.

Things to do with this request

Anyone:
KiwiRail only: