ATAP Individual Projects Costs

Harriet Gale made this Official Information request to New Zealand Transport Agency

The request was successful.

From: Harriet Gale

Dear New Zealand Transport Agency,

Hope your day is going well.

Would it please be possible to be provided the costings, understand they will be estimates for the individual projects, I believe they were called interventions that were in the Indicative Package for the ATAP Final Report, could this also please include a breakdown of the costs for the Rail Development Plan as well.

So for example.

1. Third Track to Papakura $$$
2. Fourth Track to Papakura $$$
3. Train tranche Set 1 $$$
4. SH1 Widening Papakura - Drury South $$$

etc.

Please let me know if you have any questions regarding my request, and sorry about the pedanticness of the request format.

Yours faithfully,

Harriet Gale

Link to this

From: Info@nzta.govt.nz
New Zealand Transport Agency

Thank you for contacting the NZ Transport Agency.  This is an automated
response to confirm we have received your email.   

We aim to reply to your email within 3 working days.   If your email is
urgent please call us on one of the following:

*  Motor vehicle licensing 0800 108 809
*  Driver licensing 0800 822 422 
*  Overseas +64 6 9536200
* Tolling 0800 40 20 20

If you need to report a State Highway issue that requires urgent
attention, please call our 24/7 Highway Information Team on 0800 444 449

 

Find the latest transport news, information, and advice on our website:

[1]www.nzta.govt.nz

--------------------------------------------------------------------------

This email is only intended to be read by the named recipient.  It may
contain information which is confidential, proprietary or the subject of
legal privilege.  If you are not the intended recipient you must delete
this email and may not use any information contained in it.  Legal
privilege is not waived because you have read this email.

--------------------------------------------------------------------------

References

Visible links
1. http://www.nzta.govt.nz/

hide quoted sections

Link to this

From: Official Correspondence
New Zealand Transport Agency


Attachment image001.jpg
2K Download

Attachment image002.jpg
1K Download

Attachment image003.jpg
0K Download

Attachment image004.jpg
1K Download


Dear Harriet

 

This email acknowledges your below request made under the Official
Information Act 1982 for information.

 

Your request has been forwarded to the appropriate section of the
Transport Agency to respond to. They will contact you if they require
clarification of your request, more time to respond, or if your request
has been transferred to another organisation to respond to. Unless more
time is required, the Transport Agency will send a response to you within
20 working days of receiving your request.

 

If you would like to discuss your request with the Transport Agency,
please contact us by email at [1][email address].

 

 

Regards

 

_________  _____________________________________________   

Official Correspondence Unit

Office of the Chief Executive

National Office / Victoria Arcade, 50 Victoria Street,
Private Bag 6995, Wellington 6141, New Zealand 

_________  _____________________________________________   

 

[2]cid:image001.jpg@01CF322A.4C836B10            
            [3]cid:image002.jpg@01CF322A.4C836B10 [4]cid:image003.jpg@01CF322A.4C836B10 [5]cid:image004.jpg@01CF322A.4C836B10  

 

-----Original Message-----
From: Harriet Gale [6][FYI request #4671 email]
To: [7][email address]
Sent: 28/09/2016 2:48:56 p.m.
Subject: Official Information request - ATAP Individual Projects Costs

Dear New Zealand Transport Agency,

Hope your day is going well.

Would it please be possible to be provided the costings, understand they
will be estimates for the individual projects, I believe they were called
interventions that were in the Indicative Package for the ATAP Final
Report, could this also please include a breakdown of the costs for the
Rail Development Plan as well.

So for example.

1. Third Track to Papakura $$$
2. Fourth Track to Papakura $$$
3. Train tranche Set 1 $$$
4. SH1 Widening Papakura - Drury South $$$

etc.

Please let me know if you have any questions regarding my request, and
sorry about the pedanticness of the request format.

Yours faithfully,

Harriet Gale

-------------------------------------------------------------------

This is an Official Information request made via the FYI website.

Please use this email address for all replies to this request:
[8][FYI request #4671 email]

Is [9][NZTA request email] the wrong address for Official Information
requests to New Zealand Transport Agency? If so, please contact us using
this form:
[10]http://scanmail.trustwave.com/?c=2838&am...

Disclaimer: This message and any reply that you make will be published on
the internet. Our privacy and copyright policies:
[11]http://scanmail.trustwave.com/?c=2838&am...

If you find this service useful as an Official Information officer, please
ask your web manager to link to us from your organisation's OIA or LGOIMA
page.

 

 

Find the latest transport news, information, and advice on our website:

[12]www.nzta.govt.nz

--------------------------------------------------------------------------

This email is only intended to be read by the named recipient.  It may
contain information which is confidential, proprietary or the subject of
legal privilege.  If you are not the intended recipient you must delete
this email and may not use any information contained in it.  Legal
privilege is not waived because you have read this email.

--------------------------------------------------------------------------

References

Visible links
1. mailto:[email address]
2. http://www.nzta.govt.nz/
3. https://www.facebook.com/TransportAgency
4. https://twitter.com/nzta_news
5. http://www.youtube.com/user/NZTransportA...
6. mailto:[FYI request #4671 email]
7. mailto:[email address]
8. mailto:[FYI request #4671 email]
9. mailto:[NZTA request email]
10. http://scanmail.trustwave.com/?c=2838&am...
11. http://scanmail.trustwave.com/?c=2838&am...
12. http://www.nzta.govt.nz/

hide quoted sections

Link to this

From: Cedric Horner
New Zealand Transport Agency

Hi Harriet

 

Transfer of request made under the Official Information Act 1982

 

This letter is to advise you that the NZ Transport Agency is transferring
part of your request to Auckland Transport.

 

Questions 1, 2 and 3 of your request are more closely connected with the
functions of Auckland Transport. Accordingly, we are transferring this
part of your request under section 14 of the Official Information Act
1982.

 

You will therefore receive further correspondence on your request from
Auckland Transport. The time limit for their response to you will be 20
working days from the date they receive our advice of the transfer.

 

We are, however, going to process Question number 4 regarding SH1 Widening
Papakura – Drury south. You can expect a response to that question by 27
October 2016 at the latest.

 

Yours sincerely

 

 

Cedric Horner / Senior Adviser |Official Correspondence Unit I

 

-----Original Message-----
From: Harriet Gale [1][FOI #4671 email]
To: [2][email address]
Sent: 28/09/2016 2:48:56 p.m.
Subject: Official Information request - ATAP Individual Projects Costs

Dear New Zealand Transport Agency,

Hope your day is going well.

Would it please be possible to be provided the costings, understand they
will be estimates for the individual projects, I believe they were called
interventions that were in the Indicative Package for the ATAP Final
Report, could this also please include a breakdown of the costs for the
Rail Development Plan as well.

So for example.

1. Third Track to Papakura $$$
2. Fourth Track to Papakura $$$
3. Train tranche Set 1 $$$
4. SH1 Widening Papakura - Drury South $$$

etc.

Please let me know if you have any questions regarding my request, and
sorry about the pedanticness of the request format.

Yours faithfully,

Harriet Gale

-------------------------------------------------------------------

This is an Official Information request made via the FYI website.

Please use this email address for all replies to this request:
[3][FOI #4671 email]

Is [4][NZTA request email] the wrong address for Official Information
requests to New Zealand Transport Agency? If so, please contact us using
this form:
[5]http://scanmail.trustwave.com/?c=2838&am...

Disclaimer: This message and any reply that you make will be published on
the internet. Our privacy and copyright policies:
[6]http://scanmail.trustwave.com/?c=2838&am...

If you find this service useful as an Official Information officer, please
ask your web manager to link to us from your organisation's OIA or LGOIMA
page.

 

 

Find the latest transport news, information, and advice on our website:

[7]www.nzta.govt.nz

 

--------------------------------------------------------------------------

This email is only intended to be read by the named recipient.  It may
contain information which is confidential, proprietary or the subject of
legal privilege.  If you are not the intended recipient you must delete
this email and may not use any information contained in it.  Legal
privilege is not waived because you have read this email.

--------------------------------------------------------------------------

 

WARNING This email may contain information which is CONFIDENTIAL and may
be subject to LEGAL PRIVILEGE. If you are not the intended recipient, you
must not peruse, use, disseminate, distribute or copy this email or
attachments. If you have received this in error, please notify us
immediately by return email, facsimile or telephone (call us collect) and
delete this email. Thank you. Phone: +64 9 355 3553 or Fax: +64 9 355
3550. AUCKLAND TRANSPORT ACCEPTS NO RESPONSIBILITY FOR CHANGES MADE TO
THIS EMAIL OR TO ANY ATTACHMENTS AFTER TRANSMISSION FROM AUCKLAND
TRANSPORT. Nothing in this email designates an information system for the
purposes of section 11(a) of the New Zealand Electronic Transaction Act
2002, unless expressly stated otherwise.

 

Find the latest transport news, information, and advice on our website:

[8]www.nzta.govt.nz

--------------------------------------------------------------------------

This email is only intended to be read by the named recipient.  It may
contain information which is confidential, proprietary or the subject of
legal privilege.  If you are not the intended recipient you must delete
this email and may not use any information contained in it.  Legal
privilege is not waived because you have read this email.

--------------------------------------------------------------------------

References

Visible links
1. mailto:[FOI #4671 email]
2. mailto:[email address]
3. mailto:[FOI #4671 email]
4. mailto:[NZTA request email]
5. http://scanmail.trustwave.com/?c=2838&am...
6. http://scanmail.trustwave.com/?c=2838&am...
7. http://scanmail.trustwave.com/?c=2838&am...
8. http://www.nzta.govt.nz/

hide quoted sections

Link to this

From: Harriet Gale

Dear Cedric Horner,

Just clarifying as think there maybe some confusion, they were examples of the set out that it would be great to have the reply, my actual request was for the cost of each intervention of the final ATAP package this includes but is not limited to the examples above.

Just checking that the costings of all except those AT is best to answer I don't mind you forwarding them on, will be part of the reply not just SH1 Pakakura-Drury South?

Happy to explain further

Yours sincerely,

Harriet Gale

Link to this

From: Cedric Horner
New Zealand Transport Agency

Hi Harriet

 

That's understood. We'll work with Auckland Transport to get the
information to you regardless.

 

Cheers

 

Cedric Horner / Senior Adviser |Official Correspondence Unit I

 

-----Original Message-----
From: Harriet Gale [mailto:[FOI #4671 email]]
Sent: Monday, 3 October 2016 3:20 p.m.
To: Cedric Horner
Subject: RE: OIA-2596 HC: 25760085 - Official Information request - ATAP
Individual Projects Costs

 

Dear Cedric Horner,

 

Just clarifying as think there maybe some confusion, they were examples of
the set out that it would be great to have the reply, my actual request
was for the cost of each intervention of the final ATAP package this
includes but is not limited to the examples above.

 

Just checking that the costings of all except those AT is best to answer I
don't mind you forwarding them on, will be part of the reply not just SH1
Pakakura-Drury South?

 

Happy to explain further

 

Yours sincerely,

 

Harriet Gale

 

-----Original Message-----

 

Hi Harriet

 

 

 

Transfer of request made under the Official Information Act 1982

 

 

 

This letter is to advise you that the NZ Transport Agency is transferring 
part of your request to Auckland Transport.

 

 

 

Questions 1, 2 and 3 of your request are more closely connected with the 
functions of Auckland Transport. Accordingly, we are transferring this 
part of your request under section 14 of the Official Information Act 
1982.

 

 

 

You will therefore receive further correspondence on your request from 
Auckland Transport. The time limit for their response to you will be 20 
working days from the date they receive our advice of the transfer.

 

 

 

We are, however, going to process Question number 4 regarding SH1
Widening  Papakura – Drury south. You can expect a response to that
question by 27  October 2016 at the latest.

 

 

 

Yours sincerely

 

 

 

 

 

Cedric Horner / Senior Adviser |Official Correspondence Unit I

 

 

 

-------------------------------------------------------------------

Please use this email address for all replies to this request:

[1][FOI #4671 email]

 

Disclaimer: This message and any reply that you make will be published on
the internet. Our privacy and copyright policies:

[2]http://scanmail.trustwave.com/?c=2838&am...

 

If you find this service useful as an Official Information officer, please
ask your web manager to link to us from your organisation's OIA or LGOIMA
page.

 

-------------------------------------------------------------------

 

Find the latest transport news, information, and advice on our website:

[3]www.nzta.govt.nz

--------------------------------------------------------------------------

This email is only intended to be read by the named recipient.  It may
contain information which is confidential, proprietary or the subject of
legal privilege.  If you are not the intended recipient you must delete
this email and may not use any information contained in it.  Legal
privilege is not waived because you have read this email.

--------------------------------------------------------------------------

References

Visible links
1. mailto:[FOI #4671 email]
2. http://scanmail.trustwave.com/?c=2838&am...
3. http://www.nzta.govt.nz/

hide quoted sections

Link to this

From: Harriet Gale

Dear Cedric Horner,

So just checking I will receive from the NZTA the estimates for every individual roading intervention in the Final ATAP Package that the NZTA has estimated and from AT every individual PT/Roading intervention estimates that AT has the estimated for the Final ATAP Package not just the 4 examples?

Sorry it's just unclear at the moment, apologies for the inconvenience

Yours sincerely,

Harriet Gale

Link to this

From: Harriet Gale

Dear Cedric Horner,

Sorry for another reply, just making sure everything is clear, not sure my responses to you have been, so I will just put the question into a better format. I have split to Interventions in Likely NZTA & AT Categories to hopefully make it easier to forward on as you advised some are better answered by AT.

My question is can I have the $ CAPEX estimates of the following Interventions of the Final ATAP Package, please let me know if split across decades or inflation adjusted.

Likely AT
1. Penlink
2. Bus Improvement Henderson-Constellation
3. Mass Transit (City to Takapuna & Grand Drive)
4. Northwestern Busway Extension (Brigham Creek Road to Kumeu)
5. Kumeu Alternative Access
6. Northwestern Busway (Westgate to Te Atatu)
7. Northwestern Busway Extension (Pt Chev to Newton) would it also please be possible to know if this is full busway or shoulder bus lanes?
8. Bus Improvements New Lynn - Otahuhu
9. Rail (Improved port access and increase capacity for freight, additional stabling) would it also please be possible to know what the improved port access was?
10. Mass Transit (Isthmus)
11. Mass Transit (Isthmus to Airport)
12. Rail Development Program Priorities (3rd Main from Pakakura to Pukekohe)
13. Rail Development Program Priorities (Electrification to Pukekohe)
14. Mill Road: Southern Extension (Alfriston to Drury South)
15. Rail Development Program Priorities (3rd Main from Wiri to Papakura)
16. Rail Development Program Priorities (4th Main from Wiri to Papakura)
17. Rail Development Program Priorities (3rd Main from Wiri to Westfield)
18. Rail Development Program Priorities (4th Main from Wiri to Westfield)
19. Bus Improvements Airport - Manukau - Botany
20. AMETI (Busway from Panmure to Botany)
21. AMETI (Panmure - Pakuranga Busway)
22. City Rail Link
23. Level Crossing Removals, if possible would it be possible to know how many would be removed and if any discussion on which ones?
24. Tranche 1 of 21 Trains
25. Tranche 2 of 21 Trains + Depot
26. Tranche 3 of 21 Trains

Likely NZTA
1. SH1 Widening (Albany to Silverdale)
2. SH1 Widening (Constellation to Onewa Road)
3. AWHC Road
4. SH16 to 18 Connection Improvements (Connection of SH16 and SH18)
5. Improved Port/Grafton Gully Access.
6. SH20 Widening (Dominion Road to Queenstown Road)
7. SH20 Widening (Mangere Bridge to Mangere Town Centre)
8. SH20A Widening (Mangere Town Centre to Tom Pearce Drive)
9. SH20B Widening (Manukau to Airport via SH20B)
10. SH1 Widening (Hill Road to Papakura)
11. SH1 Widening (Papakura to Drury South)
12. Pukekohe Expressway
13. Accelerated Motorway Package (Airport Access Northern Improvements)
14. East West Link
15. Accelerated Motorway Package (Southern Motorway Improvements)
16. Waterview
17. Western Ring Route (Includes Bus Shoulders between Te Atatu and Pt Chev)
18. Accelerated Motorway Package (Northern Motorway Improvements)
19. Accelerated Motorway Package (Northern Busway Extension)
20. Puhoi to Warkworth Extension

Not Sure
1. AWHC PT
2. AMETI (Morrin to Merton)
3. Improve East Tamaki Connections
4. AMETI (Reeves Road Flyover)
5. Any other minor interventions not mentioned above that were part of the Final ATAP Package.

Again sorry for the inconvenience

Yours sincerely,

Harriet Gale

Link to this

From: Cedric Horner
New Zealand Transport Agency

Thanks Harriet, that's some pretty helpful context. I'll pass it along to AT :)

Cedric Horner / Senior Adviser |Official Correspondence Unit I

-----Original Message-----
From: Harriet Gale [mailto:[FOI #4671 email]]
Sent: Tuesday, 4 October 2016 7:53 a.m.
To: Cedric Horner
Subject: RE: OIA-2596 HC: 25760085 - Official Information request - ATAP Individual Projects Costs

Dear Cedric Horner,

Sorry for another reply, just making sure everything is clear, not sure my responses to you have been, so I will just put the question into a better format. I have split to Interventions in Likely NZTA & AT Categories to hopefully make it easier to forward on as you advised some are better answered by AT.

My question is can I have the $ CAPEX estimates of the following Interventions of the Final ATAP Package, please let me know if split across decades or inflation adjusted.

Likely AT
1. Penlink
2. Bus Improvement Henderson-Constellation 3. Mass Transit (City to Takapuna & Grand Drive) 4. Northwestern Busway Extension (Brigham Creek Road to Kumeu) 5. Kumeu Alternative Access 6. Northwestern Busway (Westgate to Te Atatu) 7. Northwestern Busway Extension (Pt Chev to Newton) would it also please be possible to know if this is full busway or shoulder bus lanes?
8. Bus Improvements New Lynn - Otahuhu
9. Rail (Improved port access and increase capacity for freight, additional stabling) would it also please be possible to know what the improved port access was?
10. Mass Transit (Isthmus)
11. Mass Transit (Isthmus to Airport)
12. Rail Development Program Priorities (3rd Main from Pakakura to Pukekohe) 13. Rail Development Program Priorities (Electrification to Pukekohe) 14. Mill Road: Southern Extension (Alfriston to Drury South) 15. Rail Development Program Priorities (3rd Main from Wiri to Papakura) 16. Rail Development Program Priorities (4th Main from Wiri to Papakura) 17. Rail Development Program Priorities (3rd Main from Wiri to Westfield) 18. Rail Development Program Priorities (4th Main from Wiri to Westfield) 19. Bus Improvements Airport - Manukau - Botany 20. AMETI (Busway from Panmure to Botany) 21. AMETI (Panmure - Pakuranga Busway) 22. City Rail Link 23. Level Crossing Removals, if possible would it be possible to know how many would be removed and if any discussion on which ones?
24. Tranche 1 of 21 Trains
25. Tranche 2 of 21 Trains + Depot
26. Tranche 3 of 21 Trains

Likely NZTA
1. SH1 Widening (Albany to Silverdale)
2. SH1 Widening (Constellation to Onewa Road) 3. AWHC Road 4. SH16 to 18 Connection Improvements (Connection of SH16 and SH18) 5. Improved Port/Grafton Gully Access.
6. SH20 Widening (Dominion Road to Queenstown Road) 7. SH20 Widening (Mangere Bridge to Mangere Town Centre) 8. SH20A Widening (Mangere Town Centre to Tom Pearce Drive) 9. SH20B Widening (Manukau to Airport via SH20B) 10. SH1 Widening (Hill Road to Papakura) 11. SH1 Widening (Papakura to Drury South) 12. Pukekohe Expressway 13. Accelerated Motorway Package (Airport Access Northern Improvements) 14. East West Link 15. Accelerated Motorway Package (Southern Motorway Improvements) 16. Waterview 17. Western Ring Route (Includes Bus Shoulders between Te Atatu and Pt Chev) 18. Accelerated Motorway Package (Northern Motorway Improvements) 19. Accelerated Motorway Package (Northern Busway Extension) 20. Puhoi to Warkworth Extension

Not Sure
1. AWHC PT
2. AMETI (Morrin to Merton)
3. Improve East Tamaki Connections
4. AMETI (Reeves Road Flyover)
5. Any other minor interventions not mentioned above that were part of the Final ATAP Package.

Again sorry for the inconvenience

Yours sincerely,

Harriet Gale

-----Original Message-----

Hi Harriet

 

That's understood. We'll work with Auckland Transport to get the information to you regardless.

 

Cheers

 

Cedric Horner / Senior Adviser |Official Correspondence Unit I

 

-------------------------------------------------------------------
Please use this email address for all replies to this request:
[FOI #4671 email]

Disclaimer: This message and any reply that you make will be published on the internet. Our privacy and copyright policies:
http://scanmail.trustwave.com/?c=2838&am...

If you find this service useful as an Official Information officer, please ask your web manager to link to us from your organisation's OIA or LGOIMA page.

-------------------------------------------------------------------

Find the latest transport news, information, and advice on our website:
www.nzta.govt.nz

######################################################################
This email is only intended to be read by the named recipient. It may
contain information which is confidential, proprietary or the subject
of legal privilege. If you are not the intended recipient you must
delete this email and may not use any information contained in it.
Legal privilege is not waived because you have read this email.
######################################################################

hide quoted sections

Link to this

From: Cedric Horner
New Zealand Transport Agency


Attachment Scan from Xerox MFD.txt
0K Download View as HTML

Attachment 11 49 2 417 26 10 2016.pdf
40K Download View as HTML


Morning Harriet

 

It's taking a little bit of time to pull together the information you've
asked for. So I've had to extend this (see letter attached).

 

 

Cedric Horner / Senior Adviser
Official Correspondence Unit 

Office of the Chief Executive

DDI 64 4 894 6367

E [1][email address] / w [2]nzta.govt.nz

 

 

-----Original Message-----
From: Cedric Horner
Sent: Tuesday, 4 October 2016 8:44 a.m.
To: 'Harriet Gale'
Subject: RE: OIA-2596 HC: 25760085 - Official Information request - ATAP
Individual Projects Costs

 

Thanks Harriet, that's some pretty helpful context. I'll pass it along to
AT :)

 

Cedric Horner / Senior Adviser |Official Correspondence Unit I

 

 

-----Original Message-----

From: Harriet Gale
[[3]mailto:[FOI #4671 email]]

Sent: Tuesday, 4 October 2016 7:53 a.m.

To: Cedric Horner

Subject: RE: OIA-2596 HC: 25760085 - Official Information request - ATAP
Individual Projects Costs

 

Dear Cedric Horner,

 

Sorry for another reply, just making sure everything is clear, not sure my
responses to you have been, so I will just put the question into a better
format. I have split to Interventions in Likely NZTA & AT Categories to
hopefully make it easier to forward on as you advised some are better
answered by AT.

 

My question is can I have the $ CAPEX estimates of the following
Interventions of the Final ATAP Package, please let me know if split
across decades or inflation adjusted.

 

Likely AT

1. Penlink

2. Bus Improvement Henderson-Constellation 3. Mass Transit (City to
Takapuna & Grand Drive) 4. Northwestern Busway Extension (Brigham Creek
Road to Kumeu) 5. Kumeu Alternative Access 6. Northwestern Busway
(Westgate to Te Atatu) 7. Northwestern Busway Extension (Pt Chev to
Newton) would it also please be possible to know if this is full busway or
shoulder bus lanes?

8. Bus Improvements New Lynn - Otahuhu

9. Rail (Improved port access and increase capacity for freight,
additional stabling) would it also please be possible to know what the
improved port access was?

10. Mass Transit (Isthmus)

11. Mass Transit (Isthmus to Airport)

12. Rail Development Program Priorities (3rd Main from Pakakura to
Pukekohe) 13. Rail Development Program Priorities (Electrification to
Pukekohe) 14. Mill Road: Southern Extension (Alfriston to Drury South) 15.
Rail Development Program Priorities (3rd Main from Wiri to Papakura) 16.
Rail Development Program Priorities (4th Main from Wiri to Papakura) 17.
Rail Development Program Priorities (3rd Main from Wiri to Westfield) 18.
Rail Development Program Priorities (4th Main from Wiri to Westfield) 19.
Bus Improvements Airport - Manukau - Botany 20. AMETI (Busway from Panmure
to Botany) 21. AMETI (Panmure - Pakuranga Busway) 22. City Rail Link 23.
Level Crossing Removals, if possible would it be possible to know how many
would be removed and if any discussion on which ones?

24. Tranche 1 of 21 Trains

25. Tranche 2 of 21 Trains + Depot

26. Tranche 3 of 21 Trains

 

Likely NZTA

1. SH1 Widening (Albany to Silverdale)

2. SH1 Widening (Constellation to Onewa Road) 3. AWHC Road 4. SH16 to 18
Connection Improvements (Connection of SH16 and SH18) 5. Improved
Port/Grafton Gully Access.

6. SH20 Widening (Dominion Road to Queenstown Road) 7. SH20 Widening
(Mangere Bridge to Mangere Town Centre) 8. SH20A Widening (Mangere Town
Centre to Tom Pearce Drive) 9. SH20B Widening (Manukau to Airport via
SH20B) 10. SH1 Widening (Hill Road to Papakura) 11. SH1 Widening (Papakura
to Drury South) 12. Pukekohe Expressway 13. Accelerated Motorway Package
(Airport Access Northern Improvements) 14. East West Link 15. Accelerated
Motorway Package (Southern Motorway Improvements) 16. Waterview 17.
Western Ring Route (Includes Bus Shoulders between Te Atatu and Pt Chev)
18. Accelerated Motorway Package (Northern Motorway Improvements) 19.
Accelerated Motorway Package (Northern Busway Extension) 20. Puhoi to
Warkworth Extension

 

Not Sure

1. AWHC PT

2. AMETI (Morrin to Merton)

3. Improve East Tamaki Connections

4. AMETI (Reeves Road Flyover)

5. Any other minor interventions not mentioned above that were part of the
Final ATAP Package.  

 

Again sorry for the inconvenience

 

Yours sincerely,

 

Harriet Gale

 

-----Original Message-----

 

Hi Harriet

 

 

 

That's understood. We'll work with Auckland Transport to get the 
information to you regardless.

 

 

 

Cheers

 

 

 

Cedric Horner / Senior Adviser |Official Correspondence Unit I

 

 

 

-------------------------------------------------------------------

Please use this email address for all replies to this request:

[4][FOI #4671 email]

 

Disclaimer: This message and any reply that you make will be published on
the internet. Our privacy and copyright policies:

[5]http://scanmail.trustwave.com/?c=2838&am...

 

If you find this service useful as an Official Information officer, please
ask your web manager to link to us from your organisation's OIA or LGOIMA
page.

 

-------------------------------------------------------------------

 

Find the latest transport news, information, and advice on our website:

[6]www.nzta.govt.nz

--------------------------------------------------------------------------

This email is only intended to be read by the named recipient.  It may
contain information which is confidential, proprietary or the subject of
legal privilege.  If you are not the intended recipient you must delete
this email and may not use any information contained in it.  Legal
privilege is not waived because you have read this email.

--------------------------------------------------------------------------

References

Visible links
1. mailto:[email address]
2. http://www.nzta.govt.nz/
3. mailto:[FOI #4671 email]
4. mailto:[FOI #4671 email]
5. http://scanmail.trustwave.com/?c=2838&am...
6. http://www.nzta.govt.nz/

hide quoted sections

Link to this

From: Harriet Gale

Thanks Cedric,

Do you know how AT is doing with the request sections transferred to them?

Yours sincerely,

Harriet Gale

Link to this

From: Cedric Horner
New Zealand Transport Agency

Hi Harriet

We didn’t actually transfer any of the request to AT in the end. They will just provide us with the information to respond to you. So you'll get everything from NZTA.

Cedric Horner / Senior Adviser |Official Correspondence Unit I DDI (04) 894 6367

-----Original Message-----
From: Harriet Gale [mailto:[FOI #4671 email]]
Sent: Wednesday, 26 October 2016 2:08 p.m.
To: Cedric Horner
Subject: RE: OIA-2596 HC: 25760085 - Official Information request - ATAP Individual Projects Costs

Thanks Cedric,

Do you know how AT is doing with the request sections transferred to them?

Yours sincerely,

Harriet Gale

-----Original Message-----

Morning Harriet

 

It's taking a little bit of time to pull together the information you've asked for. So I've had to extend this (see letter attached).

 

 

Cedric Horner / Senior Adviser
Official Correspondence Unit 

Office of the Chief Executive

DDI 64 4 894 6367

E [1][email address] / w [http://scanmail.trustwave.com/?c=2838&am...

 

 

-------------------------------------------------------------------
Please use this email address for all replies to this request:
[FOI #4671 email]

Disclaimer: This message and any reply that you make will be published on the internet. Our privacy and copyright policies:
http://scanmail.trustwave.com/?c=2838&am...

If you find this service useful as an Official Information officer, please ask your web manager to link to us from your organisation's OIA or LGOIMA page.

-------------------------------------------------------------------

Find the latest transport news, information, and advice on our website:
www.nzta.govt.nz

######################################################################
This email is only intended to be read by the named recipient. It may
contain information which is confidential, proprietary or the subject
of legal privilege. If you are not the intended recipient you must
delete this email and may not use any information contained in it.
Legal privilege is not waived because you have read this email.
######################################################################

hide quoted sections

Link to this

From: Harriet Gale

Thanks Cedric,

Yours sincerely,

Harriet Gale

Link to this

From: Harriet Gale

Dear Cedric Horner,

Any update on this?

Yours sincerely,

Harriet Gale

Link to this

From: Cedric Horner
New Zealand Transport Agency

Hi Harriet

Sincere apologies for the delay.

We were all set to get your response approved and sent off and then had an earthquake to deal with. The office is back to normal now and I will look to get this to you by the end of the week.

Thanks so much for your patience

Cedric Horner / Senior Adviser |Official Correspondence Unit I DDI (04) 894 6367

-----Original Message-----
From: Harriet Gale [mailto:[FOI #4671 email]]
Sent: Monday, 21 November 2016 9:37 a.m.
To: Cedric Horner
Subject: RE: OIA-2596 HC: 25760085 - Official Information request - ATAP Individual Projects Costs

Dear Cedric Horner,

Any update on this?

Yours sincerely,

Harriet Gale

-----Original Message-----

Hi Harriet

We didn’t actually transfer any of the request to AT in the end. They will just provide us with the information to respond to you. So you'll get everything from NZTA.

Cedric Horner / Senior Adviser |Official Correspondence Unit I DDI (04) 894 6367

-------------------------------------------------------------------
Please use this email address for all replies to this request:
[FOI #4671 email]

Disclaimer: This message and any reply that you make will be published on the internet. Our privacy and copyright policies:
http://scanmail.trustwave.com/?c=2838&am...

If you find this service useful as an Official Information officer, please ask your web manager to link to us from your organisation's OIA or LGOIMA page.

-------------------------------------------------------------------

Find the latest transport news, information, and advice on our website:
www.nzta.govt.nz

######################################################################
This email is only intended to be read by the named recipient. It may
contain information which is confidential, proprietary or the subject
of legal privilege. If you are not the intended recipient you must
delete this email and may not use any information contained in it.
Legal privilege is not waived because you have read this email.
######################################################################

hide quoted sections

Link to this

From: Harriet Gale

Thanks Cedric Horner,

Understand completely, thanks for your help.

Yours sincerely,

Harriet Gale

Link to this

From: Harriet Gale

Hello Cedric,

Sorry to bother you again, hope you had a great weekend, has there been any update on this?

Yours sincerely,

Harriet Gale

Link to this

From: Harriet Gale

Hello Cedric,

Sorry to bother you again, but I haven't received a reply to my follow up regarding how this is going.

Yours sincerely,

Harriet Gale

Link to this

From: Cedric Horner
New Zealand Transport Agency


Attachment OIA 2596 Attachment 1.pdf
526K Download View as HTML

Attachment OIA 2596 Attachment 2.pdf
721K Download View as HTML

Attachment OIA 2596 signed.pdf
89K Download View as HTML


Hi Harriet

 

It’s taken a while, but please find attached a response to your request
below, including two attachments.

 

Apologies for the delay, and thanks so much for your on-going patience.

 

Feel free to get back to me if you have any questions about the
information provided.

 

Cheers,

 

 

 

 

Cedric Horner / Senior Adviser
Official Correspondence Unit 

Office of the Chief Executive

 

 

 

-----Original Message-----
From: Harriet Gale [mailto:[FOI #4671 email]]
Sent: Tuesday, 4 October 2016 7:53 a.m.
To: Cedric Horner
Subject: RE: OIA-2596 HC: 25760085 - Official Information request - ATAP
Individual Projects Costs

 

Dear Cedric Horner,

 

Sorry for another reply, just making sure everything is clear, not sure my
responses to you have been, so I will just put the question into a better
format. I have split to Interventions in Likely NZTA & AT Categories to
hopefully make it easier to forward on as you advised some are better
answered by AT.

 

My question is can I have the $ CAPEX estimates of the following
Interventions of the Final ATAP Package, please let me know if split
across decades or inflation adjusted.

 

Likely AT

1. Penlink

2. Bus Improvement Henderson-Constellation 3. Mass Transit (City to
Takapuna & Grand Drive) 4. Northwestern Busway Extension (Brigham Creek
Road to Kumeu) 5. Kumeu Alternative Access 6. Northwestern Busway
(Westgate to Te Atatu) 7. Northwestern Busway Extension (Pt Chev to
Newton) would it also please be possible to know if this is full busway or
shoulder bus lanes?

8. Bus Improvements New Lynn - Otahuhu

9. Rail (Improved port access and increase capacity for freight,
additional stabling) would it also please be possible to know what the
improved port access was?

10. Mass Transit (Isthmus)

11. Mass Transit (Isthmus to Airport)

12. Rail Development Program Priorities (3rd Main from Pakakura to
Pukekohe) 13. Rail Development Program Priorities (Electrification to
Pukekohe) 14. Mill Road: Southern Extension (Alfriston to Drury South) 15.
Rail Development Program Priorities (3rd Main from Wiri to Papakura) 16.
Rail Development Program Priorities (4th Main from Wiri to Papakura) 17.
Rail Development Program Priorities (3rd Main from Wiri to Westfield) 18.
Rail Development Program Priorities (4th Main from Wiri to Westfield) 19.
Bus Improvements Airport - Manukau - Botany 20. AMETI (Busway from Panmure
to Botany) 21. AMETI (Panmure - Pakuranga Busway) 22. City Rail Link 23.
Level Crossing Removals, if possible would it be possible to know how many
would be removed and if any discussion on which ones?

24. Tranche 1 of 21 Trains

25. Tranche 2 of 21 Trains + Depot

26. Tranche 3 of 21 Trains

 

Likely NZTA

1. SH1 Widening (Albany to Silverdale)

2. SH1 Widening (Constellation to Onewa Road) 3. AWHC Road 4. SH16 to 18
Connection Improvements (Connection of SH16 and SH18) 5. Improved
Port/Grafton Gully Access.

6. SH20 Widening (Dominion Road to Queenstown Road) 7. SH20 Widening
(Mangere Bridge to Mangere Town Centre) 8. SH20A Widening (Mangere Town
Centre to Tom Pearce Drive) 9. SH20B Widening (Manukau to Airport via
SH20B) 10. SH1 Widening (Hill Road to Papakura) 11. SH1 Widening (Papakura
to Drury South) 12. Pukekohe Expressway 13. Accelerated Motorway Package
(Airport Access Northern Improvements) 14. East West Link 15. Accelerated
Motorway Package (Southern Motorway Improvements) 16. Waterview 17.
Western Ring Route (Includes Bus Shoulders between Te Atatu and Pt Chev)
18. Accelerated Motorway Package (Northern Motorway Improvements) 19.
Accelerated Motorway Package (Northern Busway Extension) 20. Puhoi to
Warkworth Extension

 

Not Sure

1. AWHC PT

2. AMETI (Morrin to Merton)

3. Improve East Tamaki Connections

4. AMETI (Reeves Road Flyover)

5. Any other minor interventions not mentioned above that were part of the
Final ATAP Package.  

 

Again sorry for the inconvenience

 

Yours sincerely,

 

Harriet Gale

 

-----Original Message-----

 

Hi Harriet

 

 

 

That's understood. We'll work with Auckland Transport to get the 
information to you regardless.

 

 

 

Cheers

 

 

 

Cedric Horner / Senior Adviser |Official Correspondence Unit I

 

 

 

-------------------------------------------------------------------

Please use this email address for all replies to this request:

[1][FOI #4671 email]

 

Disclaimer: This message and any reply that you make will be published on
the internet. Our privacy and copyright policies:

[2]http://scanmail.trustwave.com/?c=2838&am...

 

If you find this service useful as an Official Information officer, please
ask your web manager to link to us from your organisation's OIA or LGOIMA
page.

 

-------------------------------------------------------------------

 

Find the latest transport news, information, and advice on our website:

[3]www.nzta.govt.nz

--------------------------------------------------------------------------

This email is only intended to be read by the named recipient.  It may
contain information which is confidential, proprietary or the subject of
legal privilege.  If you are not the intended recipient you must delete
this email and may not use any information contained in it.  Legal
privilege is not waived because you have read this email.

--------------------------------------------------------------------------

References

Visible links
1. mailto:[FOI #4671 email]
2. http://scanmail.trustwave.com/?c=2838&am...
3. http://www.nzta.govt.nz/

hide quoted sections

Link to this

From: Harriet Gale

Thanks Cedric for you help in getting this information.

Yours sincerely,

Harriet Gale

Link to this

From: Cedric Horner
New Zealand Transport Agency

I'm on bereavement leave today 20 December. 

 

For anything urgent, please contact Suzanne Howard at
[email address]. Otherwise, I'll see to your email on Monday.

 

Find the latest transport news, information, and advice on our website:

[1]www.nzta.govt.nz

--------------------------------------------------------------------------

This email is only intended to be read by the named recipient.  It may
contain information which is confidential, proprietary or the subject of
legal privilege.  If you are not the intended recipient you must delete
this email and may not use any information contained in it.  Legal
privilege is not waived because you have read this email.

--------------------------------------------------------------------------

References

Visible links
1. http://www.nzta.govt.nz/

hide quoted sections

Link to this

From: Harriet Gale

Dear Cedric Horner,

Just following up on this ATAP has $38,600.00 million of CAPEX however the projects returned here have a CAPEX cost of $23,738.70 million.

Is there a reason for the difference such as additional types of cost, or interventions being missed as I did include "Any other minor interventions not mentioned above that were part of the Final ATAP Package."?

Yours sincerely,

Harriet Gale

Link to this

From: Official Correspondence
New Zealand Transport Agency

Hi Harriet

As noted in the response to you , you are welcome to contact Kevin Wright for any further questions you may have.

-----Original Message-----
From: Cedric Horner
Sent: Tuesday, 7 February 2017 9:54 a.m.
To: Official Correspondence
Subject: FW: Automatic reply: OIA-2596 HC: 25760085 - Official Information request - ATAP Individual Projects Costs

Cedric Horner | Senior Adviser | Official Correspondence Unit 

-----Original Message-----
From: Harriet Gale [mailto:[FYI request #4671 email]]
Sent: Sunday, 5 February 2017 11:08 a.m.
To: Cedric Horner
Subject: Re: Automatic reply: OIA-2596 HC: 25760085 - Official Information request - ATAP Individual Projects Costs

Dear Cedric Horner,

Just following up on this ATAP has $38,600.00 million of CAPEX however the projects returned here have a CAPEX cost of $23,738.70 million.

Is there a reason for the difference such as additional types of cost, or interventions being missed as I did include "Any other minor interventions not mentioned above that were part of the Final ATAP Package."?

Yours sincerely,

Harriet Gale

-----Original Message-----

I'm on bereavement leave today 20 December. 

 

For anything urgent, please contact Suzanne Howard at [email address]. Otherwise, I'll see to your email on Monday.

 

Find the latest transport news, information, and advice on our website:

[http://scanmail.trustwave.com/?c=2838&am...

References

Visible links
1. http://scanmail.trustwave.com/?c=2838&am...

-------------------------------------------------------------------
Please use this email address for all replies to this request:
[FYI request #4671 email]

Disclaimer: This message and any reply that you make will be published on the internet. Our privacy and copyright policies:
http://scanmail.trustwave.com/?c=2838&am...

If you find this service useful as an Official Information officer, please ask your web manager to link to us from your organisation's OIA or LGOIMA page.

-------------------------------------------------------------------

Find the latest transport news, information, and advice on our website:
www.nzta.govt.nz

######################################################################
This email is only intended to be read by the named recipient. It may
contain information which is confidential, proprietary or the subject
of legal privilege. If you are not the intended recipient you must
delete this email and may not use any information contained in it.
Legal privilege is not waived because you have read this email.
######################################################################

hide quoted sections

Link to this

From: Harriet Gale

Dear Cedric Horner,

I tried emailing Kevin Wright on another question when I first received a documents, however his email bounces back, could you forward this onto him, or could I have alternative contact details?

Yours sincerely,

Harriet Gale

Link to this

From: Harriet Gale

Dear Official Correspondence,

Don't worry, looks like the email has gone through this time.

Yours sincerely,

Harriet Gale

Link to this

Things to do with this request

Anyone:
New Zealand Transport Agency only: