IREX: Cost expended with the engineering and design team (Jacobs and WSP) from Feb 2022 - the closing of the Project

Adrian Sykes made this Official Information request to KiwiRail

This request has an unknown status. We're waiting for Adrian Sykes to read a recent response and update the status.

From: Adrian Sykes

Dear KiwiRail,

Can you please provide me with the following:

1. Cost expended with the Design and Engineering Consultants (Jacobs and WSP) between February 2022 and the closing of the Project.
2. Can you please provide me with a breakdown in connection with the above costs.
3. Can you please provide evidence that these costs were approved in accordance with KiwiRail's delegations of Authority, noting that all of these costs were outside of the budget?

Yours faithfully,

Adrian

Link to this

From: Adrian Sykes

Dear KiwiRail,

Sorry - I want to change the date range from Feb 2023 - the end of the Project.

Yours faithfully,

Adrian Sykes

Link to this

From: Dave Allard
KiwiRail

Good afternoon Adrian

I'd like to acknowledge receipt of your official information request dated 4 August 2024, for information on the design team spend (WSP and Jacobs) - as noted below (although we note the subsequent amendment to change the date range to Feb 2023 - the end of the Project).
We received your request on 5 August 2024, and will endeavour to respond to your request as soon as possible and in any event no later than 2 September 2024, i.e. the 20 working days after the day your request was received.
If we are unable to respond to your request by then, we will notify you of an extension of that timeframe.

I'll be looking after your request, so any questions please get in touch with me at this email address, or on the number below.

Cheers
Dave

Dave Allard | Senior Government Relations Advisor
DDI: 027 201 8182
Level 4, Wellington Railway Station, Bunny Street, Wellington 6011 | PO Box 593, Wellington 6140, New Zealand

www.kiwirail.co.nz

-----Original Message-----
From: Adrian Sykes <[FOI #27903 email]>
Sent: Sunday, August 4, 2024 10:43 AM
To: KiwiRail <[email address]>
Subject: Official Information request - IREX: Cost expended with the engineering and design team (Jacobs and WSP) from Feb 2022 - the closing of the Project

CAUTION EXTERNAL EMAIL: Do not click links or open attachments unless you know the content is safe.

Dear KiwiRail,

Can you please provide me with the following:

1. Cost expended with the Design and Engineering Consultants (Jacobs and WSP) between February 2022 and the closing of the Project.
2. Can you please provide me with a breakdown in connection with the above costs.
3. Can you please provide evidence that these costs were approved in accordance with KiwiRail's delegations of Authority, noting that all of these costs were outside of the budget?

Yours faithfully,

Adrian

-------------------------------------------------------------------

This is an Official Information request made via the FYI website.

Please use this email address for all replies to this request:
[FOI #27903 email]

Is [KiwiRail request email] the wrong address for Official Information requests to KiwiRail? If so, please contact us using this form:
https://fyi.org.nz/change_request/new?bo...

Disclaimer: This message and any reply that you make will be published on the internet. Our privacy and copyright policies:
https://fyi.org.nz/help/officers

If you find this service useful as an Official Information officer, please ask your web manager to link to us from your organisation's OIA or LGOIMA page.

-------------------------------------------------------------------

hide quoted sections

Link to this

We don't know whether the most recent response to this request contains information or not – if you are Adrian Sykes please sign in and let everyone know.

Things to do with this request

Anyone:
KiwiRail only: