From: Matthew Hooton
Dear Auckland Council,
This LGOIMA request concerns City Rail Link Ltd, of which you and the Crown are the shareholders, and is about the costs of securing subsurface rights for the City Rail Link it is building.
My request is for:
1) the total cost already paid or agreed to be paid by CRLL for subsurface rights, up until 11.59pm on 28 May 2021
2) the total costs paid by CRLL for consultants and other external providers in relation to 1 above
3) CRLL's total cost estimate of further subsurface rights, beyond those covered by 1 above, to allow the completion of the project
4) CRLL's total cost estimate for consultants and other external providers in relation to 3 above
Please note I do not seek information paid to any specific party - just the total dollar figures.
I am also making this request under the OIA to the Minister of Finance.
Thank you
Yours sincerely
Matthew Hooton
From: Official Information
Auckland Council
Kia ora Matthew,
I refer to your request below which we received on 31 May 2021, requesting
information about the cost of securing subsurface rights for City Rail
Link.
I can advise that in accordance with section 12 of the Local Government
Official Information and Meetings Act 1987 (LGOIMA) we have transferred
your request to the City Rail Link. They will respond to your request
within 20 working days of receipt of your request.
If you would like to contact the City Rail Link, their contact details
are: City Rail Link (CRL): [1][email address]
If you have any further queries please contact us on 09 301 0101 or email
[2][Auckland Council request email]
Ngā mihi,
Divya Raghubar
Privacy and Official Information Coordinator
Governance Services
Auckland Council
From: Matthew Hooton <[FYI request #15615 email]>
Sent: Monday, 31 May 2021 3:47 pm
To: Official Information <[email address]>
Subject: Official Information request - Cost of Securing Subsurface Rights
for City Rail Link
Dear Auckland Council,
This LGOIMA request concerns City Rail Link Ltd, of which you and the
Crown are the shareholders, and is about the costs of securing subsurface
rights for the City Rail Link it is building.
My request is for:
1) the total cost already paid or agreed to be paid by CRLL for subsurface
rights, up until 11.59pm on 28 May 2021
2) the total costs paid by CRLL for consultants and other external
providers in relation to 1 above
3) CRLL's total cost estimate of further subsurface rights, beyond those
covered by 1 above, to allow the completion of the project
4) CRLL's total cost estimate for consultants and other external providers
in relation to 3 above
Please note I do not seek information paid to any specific party - just
the total dollar figures.
I am also making this request under the OIA to the Minister of Finance.
Thank you
Yours sincerely
Matthew Hooton
-------------------------------------------------------------------
This is an Official Information request made via the FYI website.
Please use this email address for all replies to this request:
[3][FYI request #15615 email]
Is [4][Auckland Council request email] the wrong address for
Official Information requests to Auckland Council? If so, please contact
us using this form:
[5]https://fyi.org.nz/change_request/new?bo...
Disclaimer: This message and any reply that you make will be published on
the internet. Our privacy and copyright policies:
[6]https://fyi.org.nz/help/officers
If you find this service useful as an Official Information officer, please
ask your web manager to link to us from your organisation's OIA or LGOIMA
page.
-------------------------------------------------------------------
[7]Discover your carbon footprint. Take the quiz!
CAUTION: This email message and any attachments contain information that
may be confidential and may be LEGALLY PRIVILEGED. If you are not the
intended recipient, any use, disclosure or copying of this message or
attachments is strictly prohibited. If you have received this email
message in error please notify us immediately and erase all copies of the
message and attachments. We do not accept responsibility for any viruses
or similar carried with our email, or any effects our email may have on
the recipient computer system or network. Any views expressed in this
email may be those of the individual sender and may not necessarily
reflect the views of Council.
References
Visible links
1. mailto:[email address]
2. mailto:[Auckland Council request email]
3. mailto:[FYI request #15615 email]
4. mailto:[Auckland Council request email]
5. https://fyi.org.nz/change_request/new?bo...
6. https://fyi.org.nz/help/officers
7. https://www.futurefit.nz/?utm_source=ac_...
hide quoted sections
From: Matthew Hooton
Dear Official Information,
Thank you. I look forward to receiving the information from CRLL.
Yours sincerely,
Matthew Hooton
From: Rachel Davies-Colley
Good afternoon,
Please see attached our letter in respect of the above matter.
Kind regards
Rachel
Rachel Davies-Colley – Property Documentation Specialist
City Rail Link Ltd | Level 2, 25 Teed Street, Newmarket, Auckland 1023
PO Box 9681, Newmarket, Auckland 1149, New Zealand
M [mobile number] | E [1][email address]
AUCKLAND ON TRACK TO A BETTER FUTURE
[2]A yellow and blue train traveling down train tracks Description
automatically generated
[3][IMG] [4][IMG] [5][IMG] [6][IMG] [7][IMG]
CAUTION: This email message and any attachments contain information that
may be confidential and may be subject to legal privilege. If you are not
the intended recipient, any use, disclosure or copying of this message or
attachments is strictly prohibited. If you have received this email
message in error please notify us immediately and erase all copies of the
message and attachments. We do not accept responsibility for any viruses
or similar carried with our email, or any effects our email may have on
the recipient computer system or network. Any views expressed in this
email may be those of the individual sender and may not necessarily
reflect the views of City Rail Link Limited.
References
Visible links
1. mailto:[email address]
3. https://aus01.safelinks.protection.outlo...
4. https://aus01.safelinks.protection.outlo...
5. https://aus01.safelinks.protection.outlo...
6. https://aus01.safelinks.protection.outlo...
7. https://aus01.safelinks.protection.outlo...
From: AT Official Information (AT)
Kia ora Matthew,
Auckland Transport (AT) acknowledges receipt of your request for official
information dated 31 May 2021 about The Cost of Securing Subsurface
Rights for City Rail Link to Auckland Council. The part of your request
has been transferred to Auckland Transport on 11 June 2021 as we are best
suited to respond to questions 1 and 2.
We hope to respond to your request as soon as possible, but not later than
9 July 2021, which is 20 working days after the day your request was
received. If we aren’t able to respond to your request by then, we will
notify you of an extension of that timeframe.
Your case is being managed by Varsha, who is one of our LGOIMA Business
partner. If you have any further queries, you can contact the team on (09)
355 3553 during business hours, quoting Local Government Official
Information request number CAS-390074-V9V9Z3.
Ngâ mihi,
Simran | Customer Care Coordinator
20 Viaduct Harbour Avenue, Auckland 1010
Private Bag 92250, Auckland 1142
P 09 355 3553 | F 09 355 3550
[1]www.at.govt.nz
[2]cid:image001.jpg@01D2927A.134A0850
[3]cid:image002.jpg@01D238E0.86F57A30[4]cid:image003.jpg@01D238E0.86F57A30 [5]cid:image004.jpg@01D238E0.86F57A30 [6]cid:image005.jpg@01D238E0.86F57A30[7]cid:image006.jpg@01D238E0.86F57A30
From: Matthew Hooton <[8][FOI #15615 email]>
Sent: Monday, 31 May 2021 3:47 pm
To: Official Information <[9][email address]>
Subject: Official Information request - Cost of Securing Subsurface Rights
for City Rail Link
Dear Auckland Council,
This LGOIMA request concerns City Rail Link Ltd, of which you and the
Crown are the shareholders, and is about the costs of securing subsurface
rights for the City Rail Link it is building.
My request is for:
1) the total cost already paid or agreed to be paid by CRLL for subsurface
rights, up until 11.59pm on 28 May 2021
2) the total costs paid by CRLL for consultants and other external
providers in relation to 1 above
3) CRLL's total cost estimate of further subsurface rights, beyond those
covered by 1 above, to allow the completion of the project
4) CRLL's total cost estimate for consultants and other external providers
in relation to 3 above
Please note I do not seek information paid to any specific party - just
the total dollar figures.
I am also making this request under the OIA to the Minister of Finance.
Thank you
Yours sincerely
Matthew Hooton
-------------------------------------------------------------------
This is an Official Information request made via the FYI website.
Please use this email address for all replies to this request:
[10][FOI #15615 email]
Is [11][Auckland Council request email] the wrong address for
Official Information requests to Auckland Council? If so, please contact
us using this form:
[12]https://fyi.org.nz/change_request/new?bo...
Disclaimer: This message and any reply that you make will be published on
the internet. Our privacy and copyright policies:
[13]https://fyi.org.nz/help/officers
If you find this service useful as an Official Information officer, please
ask your web manager to link to us from your organisation's OIA or LGOIMA
page.
We all have an important part to play in helping to reduce the spread of
COVID-19 in our communities. [14]Find the latest information and advice
from Auckland Transport. For the latest news from the Ministry of Health
go to the [15]Unite Against Covid-19 website.
Important notice: The contents of this email and any attachments may be
confidential and subject to legal privilege. If you have received this
email message in error please notify us immediately and erase all copies
of the message and attachments; any use, disclosure or copying of this
message or attachments is prohibited. Any views expressed in this email
may be those of the individual sender and may not necessarily reflect the
views of Auckland Transport.
References
Visible links
1. http://www.at.govt.nz/
3. http://www.facebook.com/akltransport
4. https://twitter.com/akltransport
5. https://www.instagram.com/akltransport/
6. https://www.linkedin.com/company/aucklan...
7. https://www.youtube.com/user/aucklandtra...
8. mailto:[FOI #15615 email]
9. mailto:[email address]
10. mailto:[FOI #15615 email]
11. mailto:[Auckland Council request email]
12. https://urldefense.com/v3/__https:/aus01...
13. https://urldefense.com/v3/__https:/aus01...
14. https://at.govt.nz/COVID-19
15. https://covid19.govt.nz/
hide quoted sections
From: CRL Property
Good afternoon,
Please see our letter attached.
Kind regards
Rachel
City Rail Link Ltd | Level 2, 25 Teed Street, Newmarket, Auckland 1023
PO Box 9681, Newmarket, Auckland 1149, New Zealand
AUCKLAND ON TRACK TO A BETTER FUTURE
[1]A yellow and blue train traveling down train tracks Description
automatically generated
[2][IMG] [3][IMG] [4][IMG] [5][IMG] [6][IMG]
CAUTION: This email message and any attachments contain information that
may be confidential and may be subject to legal privilege. If you are not
the intended recipient, any use, disclosure or copying of this message or
attachments is strictly prohibited. If you have received this email
message in error please notify us immediately and erase all copies of the
message and attachments. We do not accept responsibility for any viruses
or similar carried with our email, or any effects our email may have on
the recipient computer system or network. Any views expressed in this
email may be those of the individual sender and may not necessarily
reflect the views of City Rail Link Limited.
References
Visible links
2. https://aus01.safelinks.protection.outlo...
3. https://aus01.safelinks.protection.outlo...
4. https://aus01.safelinks.protection.outlo...
5. https://aus01.safelinks.protection.outlo...
6. https://aus01.safelinks.protection.outlo...
From: Matthew Hooton
Dear CRL Property,
Thank you for the update. Please proceed with 1, 3 and 4. At this stage, 2 can be put on hold.
Thank you.
Yours sincerely,
Matthew Hooton
From: AT Official Information (AT)
Kia ora Matthew
I’m the LGOIMA Business Partner who’s looking into your official
information request
My name is Varsha and I’m a LGOIMA Business Partner at Auckland Transport.
I’m responsible for looking into the official information request you
made on 11/06/2021 about City Rail Link. Questions 1 and 2 of your request
was transferred to Auckland Transport to respond.
The LGOIMA requires that we let you know our decision on your request no
later than 20 working days after the day we received your request.
Unfortunately, it won’t be possible to meet that time limit and we are
therefore letting you know of an extension of the time to make our
decision, to 23 July 2021.
This extension is necessary because consultations within Auckland
Transport are necessary to make a decision on your request. Therefore, a
proper response cannot reasonably be made within the original time limit.
If you need to provide us with more information relevant to your request
or you have any questions, simply reply to this email leaving the subject
line as it is. We’ll make sure this information is added to your case.
Ngā mihi
Varsha
LGOIMA Business Partner
Auckland Transport
20 Viaduct Harbour Avenue, Auckland 1010
[1]www.at.govt.nz
From: Matthew Hooton <[2][FOI #15615 email]>
Sent: Monday, 31 May 2021 3:47 pm
To: Official Information <[3][email address]>
Subject: Official Information request - Cost of Securing Subsurface Rights
for City Rail Link
Dear Auckland Council,
This LGOIMA request concerns City Rail Link Ltd, of which you and the
Crown are the shareholders, and is about the costs of securing subsurface
rights for the City Rail Link it is building.
My request is for:
1) the total cost already paid or agreed to be paid by CRLL for subsurface
rights, up until 11.59pm on 28 May 2021
2) the total costs paid by CRLL for consultants and other external
providers in relation to 1 above
3) CRLL's total cost estimate of further subsurface rights, beyond those
covered by 1 above, to allow the completion of the project
4) CRLL's total cost estimate for consultants and other external providers
in relation to 3 above
Please note I do not seek information paid to any specific party - just
the total dollar figures.
I am also making this request under the OIA to the Minister of Finance.
Thank you
Yours sincerely
Matthew Hooton
We all have an important part to play in helping to reduce the spread of
COVID-19 in our communities. [4]Find the latest information and advice
from Auckland Transport. For the latest news from the Ministry of Health
go to the [5]Unite Against Covid-19 website.
Important notice: The contents of this email and any attachments may be
confidential and subject to legal privilege. If you have received this
email message in error please notify us immediately and erase all copies
of the message and attachments; any use, disclosure or copying of this
message or attachments is prohibited. Any views expressed in this email
may be those of the individual sender and may not necessarily reflect the
views of Auckland Transport.
References
Visible links
1. http://www.at.govt.nz/
2. mailto:[FOI #15615 email]
3. mailto:[email address]
4. https://at.govt.nz/COVID-19
5. https://covid19.govt.nz/
From: Matthew Hooton
Dear AT Official Information (AT),
Thank you your reply. Under the Act, please also advise who within Auckland Transport is involved in the consultations, what they are about, why they are necessary and why they will take three weeks to complete, on top of the four weeks statutory timeframe you have already had since the request.
Thank you.
Yours sincerely,
Matthew Hooton
From: AT Official Information (AT)
Kia ora Matthew,
Thank you for your email. Your request was transferred to us by CRL on 10
June 2021.
Your request required consultations between the following teams within AT
for information dating prior to 2017.
I have worked with the below teams:
* Finance
* Property and Planning and;
* Integrated Networks
The above teams are working on your request, as well as other requests,
alongside their daily duties. We will provide you with the information we
hold as soon as possible, but no later than 23 July 2021. This time is
necessary because all of the information needs to be collated and checked
to ensure that nothing is missing.
However, I am pleased to inform you that the team are making progress and
it is looking like we will be able to provide the information sooner.
Kind regards,
Varsha
LGOIMA Business Partner
------------------- Original Message -------------------
From: Matthew Hooton <[FOI #15615 email]>;
Received: Tue Jul 06 2021 06:36:08 GMT+1200 (New Zealand Standard Time)
To: [email address] <[email address]>;
AT Official Information # <[email address]>; LGOIMA
<[email address]>;
Subject: Re: We’re making progress on your official information request
(case number CAS-390074-V9V9Z3 ) CRM:005570001306
Dear AT Official Information (AT),
Thank you your reply. Under the Act, please also advise who within
Auckland Transport is involved in the consultations, what they are about,
why they are necessary and why they will take three weeks to complete, on
top of the four weeks statutory timeframe you have already had since the
request.
Thank you.
Yours sincerely,
Matthew Hooton
-----Original Message-----
Kia ora Matthew
I’m the LGOIMA Business Partner who’s looking into your official
information request
My name is Varsha and I’m a LGOIMA Business Partner at Auckland
Transport.
I’m responsible for looking into the official information request you
made on 11/06/2021 about City Rail Link. Questions 1 and 2 of your
request
was transferred to Auckland Transport to respond.
The LGOIMA requires that we let you know our decision on your request no
later than 20 working days after the day we received your request.
Unfortunately, it won’t be possible to meet that time limit and we are
therefore letting you know of an extension of the time to make our
decision, to 23 July 2021.
This extension is necessary because consultations within Auckland
Transport are necessary to make a decision on your request. Therefore, a
proper response cannot reasonably be made within the original time limit.
If you need to provide us with more information relevant to your request
or you have any questions, simply reply to this email leaving the subject
line as it is. We’ll make sure this information is added to your case.
Ngā mihi
Varsha
LGOIMA Business Partner
Auckland Transport
20 Viaduct Harbour Avenue, Auckland 1010
[1]http://www.at.govt.nz
From: Matthew Hooton <[2][FOI #15615 email]>
Sent: Monday, 31 May 2021 3:47 pm
To: Official Information <[3][email address]>
Subject: Official Information request - Cost of Securing Subsurface
Rights
for City Rail Link
Dear Auckland Council,
This LGOIMA request concerns City Rail Link Ltd, of which you and the
Crown are the shareholders, and is about the costs of securing subsurface
rights for the City Rail Link it is building.
My request is for:
1) the total cost already paid or agreed to be paid by CRLL for
subsurface
rights, up until 11.59pm on 28 May 2021
2) the total costs paid by CRLL for consultants and other external
providers in relation to 1 above
3) CRLL's total cost estimate of further subsurface rights, beyond those
covered by 1 above, to allow the completion of the project
4) CRLL's total cost estimate for consultants and other external
providers
in relation to 3 above
Please note I do not seek information paid to any specific party - just
the total dollar figures.
I am also making this request under the OIA to the Minister of Finance.
Thank you
Yours sincerely
Matthew Hooton
We all have an important part to play in helping to reduce the spread of
COVID-19 in our communities. [4]Find the latest information and advice
from Auckland Transport. For the latest news from the Ministry of Health
go to the [5]Unite Against Covid-19 website.
Important notice: The contents of this email and any attachments may be
confidential and subject to legal privilege. If you have received this
email message in error please notify us immediately and erase all copies
of the message and attachments; any use, disclosure or copying of this
message or attachments is prohibited. Any views expressed in this email
may be those of the individual sender and may not necessarily reflect the
views of Auckland Transport.
References
Visible links
1. [1]http://www.at.govt.nz/
2. [2]mailto:[FOI #15615 email]
3. [3]mailto:[email address]
4. [4]https://at.govt.nz/COVID-19
5.
[5]https://urldefense.com/v3/__https://covi...
-------------------------------------------------------------------
Please use this email address for all replies to this request:
[FOI #15615 email]
Disclaimer: This message and any reply that you make will be published on
the internet. Our privacy and copyright policies:
[6]https://urldefense.com/v3/__https://fyi....
If you find this service useful as an Official Information officer, please
ask your web manager to link to us from your organisation's OIA or LGOIMA
page.
-------------------------------------------------------------------
Important notice: The contents of this email and any attachments may be
confidential and subject to legal privilege. If you have received this
email message in error please notify us immediately and erase all copies
of the message and attachments; any use, disclosure or copying of this
message or attachments is prohibited. Any views expressed in this email
may be those of the individual sender and may not necessarily reflect the
views of Auckland Transport.
References
Visible links
1. http://www.at.govt.nz/
2. mailto:[foi
3. mailto:[email
4. https://at.govt.nz/COVID-19
5. https://urldefense.com/v3/__https://covi...
6. https://urldefense.com/v3/__https://fyi....
hide quoted sections
From: CRL Property
Good afternoon,
Please see our letter attached.
Kind regards
Rachel
City Rail Link Ltd | Level 2, 25 Teed Street, Newmarket, Auckland 1023
PO Box 9681, Newmarket, Auckland 1149, New Zealand
AUCKLAND ON TRACK TO A BETTER FUTURE
[1]A yellow and blue train traveling down train tracks Description
automatically generated
[2][IMG] [3][IMG] [4][IMG] [5][IMG] [6][IMG]
CAUTION: This email message and any attachments contain information that
may be confidential and may be subject to legal privilege. If you are not
the intended recipient, any use, disclosure or copying of this message or
attachments is strictly prohibited. If you have received this email
message in error please notify us immediately and erase all copies of the
message and attachments. We do not accept responsibility for any viruses
or similar carried with our email, or any effects our email may have on
the recipient computer system or network. Any views expressed in this
email may be those of the individual sender and may not necessarily
reflect the views of City Rail Link Limited.
References
Visible links
2. https://aus01.safelinks.protection.outlo...
3. https://aus01.safelinks.protection.outlo...
4. https://aus01.safelinks.protection.outlo...
5. https://aus01.safelinks.protection.outlo...
6. https://aus01.safelinks.protection.outlo...
From: AT Official Information (AT)
Kia ora Matthew
I’ve attached the official information you asked for
On 11/06/2021 you asked for information.
I’ve attached a response from Jane Small, who is our Group Manager for
Property and Planning.
Should you believe that we have not dealt with your request appropriately,
you are able to make a complaint to the Office of the Ombudsman in
accordance with section 27(3) of the LGOIMA Act and seek an investigation
and review in regard to this matter.
You can contact the Ombudsman at [1]www.ombudsman.parliament.nz or
freephone 0800 802 602.
Ngā mihi
Varsha
LGOIMA Business Partner
Auckland Transport
20 Viaduct Harbour Avenue, Auckland 1010
[2]www.at.govt.nz
We all have an important part to play in helping to reduce the spread of
COVID-19 in our communities. [3]Find the latest information and advice
from Auckland Transport. For the latest news from the Ministry of Health
go to the [4]Unite Against Covid-19 website.
Important notice: The contents of this email and any attachments may be
confidential and subject to legal privilege. If you have received this
email message in error please notify us immediately and erase all copies
of the message and attachments; any use, disclosure or copying of this
message or attachments is prohibited. Any views expressed in this email
may be those of the individual sender and may not necessarily reflect the
views of Auckland Transport.
References
Visible links
1. file:///tmp/www.ombudsman.parliament.nz
2. file:///tmp/www.at.govt.nz
3. https://at.govt.nz/COVID-19
4. https://covid19.govt.nz/
Things to do with this request
- Add an annotation (to help the requester or others)
- Download a zip file of all correspondence