Costings for main repair outside 23b Astrolabe Street Porirua
Kiwibob made this Official Information request to Wellington Water Limited
This request has an unknown status. We're waiting for Kiwibob to read a recent response and update the status.
From: Kiwibob
Dear Wellington Water Limited,
Please supply costing for repairing the water main outside 23b Astrolabe Street Porirua on 28th May 2025.
This leak was reported on o8/01/2025.
Costing should be broken down into Traffic management and actual repair costs, including if possible, the time individual crew spent on the job and how much of that time was spent working (as opposed to sitting around doing nothing).
Yours faithfully,
Robert Osborne
From: Official Information
Wellington Water Limited
Tēnā koe Robert,
Official information request (our ref: 25-120)
Thank you for your official information request received on 4 June 2025.
We will endeavour to respond to your request as soon as possible and in
any event no later than 3 July 2025, being 20 working days after your
request was received by Wellington Water. If we are unable to respond to
your request by the set date, we will notify you of an extension of that
timeframe.
If any additional factors come to light which are relevant to your
request, please do not hesitate to contact us so these can be taken into
account.
Ngā mihi,
Anna Weir
Anna Weir Executive Assistant - Strategy & Planning
Mob +64 21 226 8643
Private Bag 39804, Wellington Mail Centre 5045
Level 4, 25 Victoria Street, Petone, Lower Hutt
Things to do with this request
- Add an annotation (to help the requester or others)
- Download a zip file of all correspondence