Connection of a generator to the wiring of a house or building following an emergency - Guidance Update
Mark Harris made this Official Information request to WorkSafe New Zealand
This request has an unknown status. We're waiting for Mark Harris to read a recent response and update the status.
From: Mark Harris
Dear WorkSafe New Zealand,
On Friday 13 February 2026 WorkSafe sent out a "Stakeholder Consultation Draft" for review. Feedback was due 27 February 2026.
Please provide:
1. All of the feedback received by WorkSafe.
2. All analysis, including within emails, of the feedback provided.
3. All consideration of the proposed, but non-compliant, PEN conductor switching included within the draft guidance. If a legal opinion was sought, this should be provided (note such advice is not covered by privilege).
4. A copy of all drafts/updates of the draft guidance including its current status.
5. Advise whether the fact that WorkSafe's draft guidance included a non-compliant solution (PEN conductor switching - prohibited by AS/NZS 3000:2018 7.3.8(a)) led to any consideration of competence levels and/or the need for training within the Energy Safety group?
Yours faithfully,
Mark Harris
Vice President NZEIA
From: Ministerial Services – WorkSafe
WorkSafe New Zealand
Tçnâ koe Mark
Thank you for your Official Information Act request received by WorkSafe New Zealand on 12 July 2026.
We will respond to your request in accordance with the provisions of the Official Information Act as soon as reasonably practicable and not later than 20 working days.
If we need to extend this timeframe, we will let you know before that date with the reasons why.
Please contact [email address] if you have any questions.
Ngâ mihi,
Ministerial Services
8 Willis Street, PO Box 165, Wellington 6140
W worksafe.govt.nz
show quoted sections
Things to do with this request
- Add an annotation (to help the requester or others)
- Download a zip file of all correspondence (note: this contains the same information already available above).