Liquidated Damages or Cost Recovery for Remedying Defective Work
Neil Quinn made this Official Information request to Wellington Water Limited
This request has an unknown status. We're waiting for Neil Quinn to read a recent response and update the status.
From: Neil Quinn
Kia ora,
For each of the past five financial years, please provide aggregated information regarding the use of contractual cost recovery mechanisms in Wellington Water’s contracts with contractors.
Specifically, for each financial year:
1. The number of contracts entered into that included provisions for:
* liquidated damages,
* contractual deductions, or
* cost recovery for defective or non-compliant work
2. Whether such provisions are included as a standard term in Wellington Water’s contractor agreements (yes/no, with brief description if available)
3. The number of instances in which Wellington Water:
* applied liquidated damages,
* made contractual deductions, or
* recovered costs from contractors for defective, delayed, or non-compliant work
4. Where readily available, the total value of such recoveries per financial year (in aggregate)
5. The number of instances where:
* defective or non-compliant work was identified, but
* no liquidated damages, deduction, or cost recovery was applied
6. The number of instances in which the cost of rectification, repair, replacement, or other remediation of defective new work was:
-recovered from the contractor,
-borne by Wellington Water,
-borne by another publicly funded budget or programme, or
-borne by the property owner or another private party
If Wellington Water does not record cost allocation in that form, then please provide any equivalent aggregated information showing whether the cost of remedying non-compliant or defective newly installed works was recovered from contractors or instead met from Wellington Water or other public funds.
Ngā mihi,
Simon Glenn
From: Official Information
Wellington Water Limited
Tçnâ koe Simon
Thank you for your request below. This request will be considered under
the Local Government Official Information and Meetings Act 1987 (LGOIMA).
Wellington Water will provide a response no later than 6 May 2026, being
20 working days from the date the request was received.
We are currently assessing the information you have requested and may seek
clarification/refinement of various aspects, once identified.
Ngâ mihi,
Leni
Senior LGOIMA Advisor
Private Bag 39804, Wellington Mail Centre 5045
Level 4, 25 Victoria Street, Petone, Lower Hutt
[1]www.wellingtonwater.co.nz
-----Original Message-----
From: Neil Quinn <[FOI #34370 email]>
Sent: Saturday, April 4, 2026 4:50 PM
To: Official Information <[Wellington Water Limited request email]>
Subject: LGOIMA 26-078 Official Information request - Liquidated Damages
or Cost Recovery for Remedying Defective Work
[You don't often get email from
[2][FOI #34370 email]. Learn why this is
important at [3]https://aka.ms/LearnAboutSenderIdentific... ]
Caution: This is an external email. Please take care when clicking links
or opening attachments.
Kia ora,
For each of the past five financial years, please provide aggregated
information regarding the use of contractual cost recovery mechanisms in
Wellington Water’s contracts with contractors.
Specifically, for each financial year:
1. The number of contracts entered into that included provisions for:
* liquidated damages,
* contractual deductions, or
* cost recovery for defective or non-compliant work
2. Whether such provisions are included as a standard term in Wellington
Water’s contractor agreements (yes/no, with brief description if
available)
3. The number of instances in which Wellington Water:
* applied liquidated damages,
* made contractual deductions, or
* recovered costs from contractors for defective, delayed, or
non-compliant work
4. Where readily available, the total value of such recoveries per
financial year (in aggregate)
5. The number of instances where:
* defective or non-compliant work was identified, but
* no liquidated damages, deduction, or cost recovery was applied
6. The number of instances in which the cost of rectification, repair,
replacement, or other remediation of defective new work was:
-recovered from the contractor,
-borne by Wellington Water,
-borne by another publicly funded budget or programme, or -borne by the
property owner or another private party
If Wellington Water does not record cost allocation in that form, then
please provide any equivalent aggregated information showing whether the
cost of remedying non-compliant or defective newly installed works was
recovered from contractors or instead met from Wellington Water or other
public funds.
Ngâ mihi,
Simon Glenn
-------------------------------------------------------------------
This is an Official Information request made via the FYI website.
Please use this email address for all replies to this request:
[4][FOI #34370 email]
Is [5][Wellington Water Limited request email] the wrong address for
Official Information requests to Wellington Water Limited? If so, please
contact us using this form:
[6]https://aus01.safelinks.protection.outlo...
Disclaimer: This message and any reply that you make will be published on
the internet. Our privacy and copyright policies:
[7]https://aus01.safelinks.protection.outlo...
If you find this service useful as an Official Information officer, please
ask your web manager to link to us from your organisation's OIA or LGOIMA
page.
-------------------------------------------------------------------
References
Visible links
1. Wellington Water Website
http://www.wellingtonwater.co.nz/
2. mailto:[FOI #34370 email]
3. https://aka.ms/LearnAboutSenderIdentific...
4. mailto:[FOI #34370 email]
5. mailto:[Wellington Water Limited request email]
6. https://fyi.org.nz/change_request/new?bo...
7. https://fyi.org.nz/help/officers
hide quoted sections
Things to do with this request
- Add an annotation (to help the requester or others)
- Download a zip file of all correspondence (note: this contains the same information already available above).