Scope and status of Hopetoun St road maintenance work

felix made this Official Information request to Auckland Transport

The request was successful.

From: felix

Dear Auckland Transport,

I have some questions about the anticipated timing and scope of the Hopetoun St - Ponsonby Rd to Motorway Overbridge resurfacing project.

- Is it currently programmed for construction?
- What is the physical boundary of the works; does it include the Howe St extension and the northern walkway adjacent to Auckland Girls Grammar School?
- Is there any planned layout changes involved in these works; including safety remediations identified in the 2016 Opus Hopetoun St Cyleway PFR such as intersection narrowing & refuges?
- Has input on this work been sought from the local board to ensure alignment with community needs?
- Has input on this work been sought to ensure alignment with the Parking Strategy?
- Has input on this work been sought to ensure alignment with the six Network Operating Plan strategic principles?
- Has input on this work been sought to remediate the speeding problems known to AT?
- Has input been sought to achieve greater safety in this area due to the high collective and mid-high presonal risk factors, where the ITP notes 'Routes with both High or Medium High Collective and Personal Risk are generally regarded as needing first priority for improvement, such as parts of SH1 and the City Centre arterials.'?

Yours faithfully,

Felix Toepfer

Link to this

From: AT Official Information (AT)
Auckland Transport


Attachment image001.jpg
4K Download

Attachment image002.jpg
0K Download

Attachment image003.jpg
0K Download

Attachment image004.jpg
1K Download

Attachment image005.jpg
1K Download

Attachment image006.jpg
1K Download


Dear Felix

 

We acknowledge receipt of your request for official information dated 7
May 2019 regarding Hopetoun St road maintenance work.

 

We are processing your request according to the provisions of the Local
Government Official Information and Meetings Act 1987. You will receive a
decision within 20 working days after the receipt of your request by
Auckland Transport, as required by the Act. The expected due date for a
decision is 5 June 2019.  Please note this is the maximum response time
and we will endeavour to respond to you sooner.

 

If you have any further queries, please contact us on (09) 355 3553 during
business hours, quoting Local Government Official Information request
number CAS-1048031-J2V2C2.

 

Kind regards

 

Simran | Customer Liaison Specialist
Auckland Transport

Private Bag 92250, Auckland 1142

P 09 355 3553 | E [1][email address] or
[2][email address]

[3]www.at.govt.nz
[4]cid:image008.jpg@01D4DF26.CF144370

[5]cid:image002.jpg@01D2927A.134A0850[6]cid:image003.jpg@01D2927A.134A0850 [7]cid:image004.jpg@01D2927A.134A0850 [8]cid:image005.jpg@01D2927A.134A0850[9]cid:image006.jpg@01D2927A.134A0850

 

 

-----Original Message-----
From: felix <[10][FOI #10267 email]>
Sent: Tuesday, 7 May 2019 11:30 a.m.
To: AT Official Information (AT) <[11][email address]>
Subject: Official Information request - Scope and status of Hopetoun St
road maintenance work

Dear Auckland Transport,

I have some questions about the anticipated timing and scope of the
Hopetoun St - Ponsonby Rd to Motorway Overbridge resurfacing project.

- Is it currently programmed for construction?
- What is the physical boundary of the works; does it include the Howe St
extension and the northern walkway adjacent to Auckland Girls Grammar
School?
- Is there any planned layout changes involved in these works; including
safety remediations identified in the 2016 Opus Hopetoun St Cyleway PFR
such as intersection narrowing & refuges?
- Has input on this work been sought from the local board to ensure
alignment with community needs?
- Has input on this work been sought to ensure alignment with the Parking
Strategy?
- Has input on this work been sought to ensure alignment with the six
Network Operating Plan strategic principles?
- Has input on this work been sought to remediate the speeding problems
known to AT?
- Has input been sought to achieve greater safety in this area due to the
high collective and mid-high presonal risk factors, where the ITP notes
'Routes with both High or Medium High Collective and Personal Risk are
generally regarded as needing first priority for improvement, such as
parts of SH1 and the City Centre arterials.'?

Yours faithfully,

Felix Toepfer

-------------------------------------------------------------------

This is an Official Information request made via the FYI website.

Please use this email address for all replies to this request:
[12][FOI #10267 email]

Is [13][Auckland Transport request email] the wrong address for Official
Information requests to Auckland Transport? If so, please contact us using
this form:
[14]https://fyi.org.nz/change_request/new?bo...

Disclaimer: This message and any reply that you make will be published on
the internet. Our privacy and copyright policies:
[15]https://fyi.org.nz/help/officers

If you find this service useful as an Official Information officer, please
ask your web manager to link to us from your organisation's OIA or LGOIMA
page.

-------------------------------------------------------------------

Important notice: The contents of this email and any attachments may be
confidential and subject to legal privilege. If you have received this
email message in error please notify us immediately and erase all copies
of the message and attachments; any use, disclosure or copying of this
message or attachments is prohibited. Any views expressed in this email
may be those of the individual sender and may not necessarily reflect the
views of Auckland Transport.

References

Visible links
1. mailto:[email address]
2. mailto:[email address]
3. http://www.at.govt.nz/
5. https://www.facebook.com/akltransport
6. https://twitter.com/akltransport
7. https://www.instagram.com/akltransport/
8. https://www.linkedin.com/company/aucklan...
9. https://www.youtube.com/user/aucklandtra...
10. mailto:[FOI #10267 email]
11. mailto:[email address]
12. mailto:[FOI #10267 email]
13. mailto:[Auckland Transport request email]
14. https://fyi.org.nz/change_request/new?bo...
15. https://fyi.org.nz/help/officers

hide quoted sections

Link to this

From: AT Official Information (AT)
Auckland Transport


Attachment image001.jpg
4K Download

Attachment image002.jpg
0K Download

Attachment image003.jpg
0K Download

Attachment image004.jpg
1K Download

Attachment image005.jpg
1K Download

Attachment image006.jpg
1K Download


Dear Mr Toepfer

 

We refer to your request for official information dated 7 May 2019
regarding the Hopetoun St-Ponsonby Road to Motorway Overbridge resurfacing
project.

 

We have decided to grant your request. However, it will take us some time
to prepare the information for release. We will send you the information
on or before 17 June 2019.

 

You have the right to seek an investigation and review by the Ombudsman of
this decision. Information about how to make a complaint is available at
[1]www.ombudsman.parliament.nz or freephone 0800 802 602.

If you have any further queries, please contact us on (09) 355 3553 during
business hours, quoting Local Government Official Information request
number CAS-1048031-J2V2C2.

 

Kind regards

 

Deepa Pathak | LGOIMA Business Partner [4]Description: Description:
Description: Description:
LGOIMA Portfolio | Customer Liaison Team Description: Description:
20 Viaduct Harbour Ave, Auckland 1010 Description: Description:
Description: Description:
P 09 355 3553   Description: Email-Signature

E [2][email address] or
[3][email address]

Working together to create an awesome
journey –first time, every time

[5]cid:image002.jpg@01D238E0.86F57A30[6]cid:image003.jpg@01D238E0.86F57A30 [7]cid:image004.jpg@01D238E0.86F57A30 [8]cid:image005.jpg@01D238E0.86F57A30[9]cid:image006.jpg@01D238E0.86F57A30

 

Important notice: The contents of this email and any attachments may be
confidential and subject to legal privilege. If you have received this
email message in error please notify us immediately and erase all copies
of the message and attachments; any use, disclosure or copying of this
message or attachments is prohibited. Any views expressed in this email
may be those of the individual sender and may not necessarily reflect the
views of Auckland Transport.

References

Visible links
1. http://www.ombudsman.parliament.nz/
2. mailto:[email address]
3. mailto:[email address]
5. http://www.facebook.com/akltransport
6. https://twitter.com/akltransport
7. https://www.instagram.com/akltransport/
8. https://www.linkedin.com/company/aucklan...
9. https://www.youtube.com/user/aucklandtra...

Link to this

From: AT Official Information (AT)
Auckland Transport


Attachment image001.jpg
4K Download

Attachment image002.jpg
0K Download

Attachment image003.jpg
0K Download

Attachment image004.jpg
1K Download

Attachment image005.jpg
1K Download

Attachment image006.jpg
1K Download

Attachment Auckland Transport CAS 1048031 J2V2C2.pdf
162K Download View as HTML


Dear Mr Toepfer

 

We refer to your request for official information dated 7 May 2019
regarding the Hopetoun St-Ponsonby Road to Motorway Overbridge resurfacing
project.

 

Please find attached a response for information requested under the Local
Government Official Information and Meetings Act 1987

 

Kind regards

 

Deepa Pathak | LGOIMA Business Partner [3]Description: Description:
Description: Description:
LGOIMA Portfolio | Customer Liaison Team Description: Description:
20 Viaduct Harbour Ave, Auckland 1010 Description: Description:
Description: Description:
P 09 355 3553   Description: Email-Signature

E [1][email address] or
[2][email address]

Working together to create an awesome journey
–first time, every time

[4]cid:image002.jpg@01D238E0.86F57A30[5]cid:image003.jpg@01D238E0.86F57A30 [6]cid:image004.jpg@01D238E0.86F57A30 [7]cid:image005.jpg@01D238E0.86F57A30[8]cid:image006.jpg@01D238E0.86F57A30

 

 

Important notice: The contents of this email and any attachments may be
confidential and subject to legal privilege. If you have received this
email message in error please notify us immediately and erase all copies
of the message and attachments; any use, disclosure or copying of this
message or attachments is prohibited. Any views expressed in this email
may be those of the individual sender and may not necessarily reflect the
views of Auckland Transport.

References

Visible links
1. mailto:[email address]
2. mailto:[email address]
4. http://www.facebook.com/akltransport
5. https://twitter.com/akltransport
6. https://www.instagram.com/akltransport/
7. https://www.linkedin.com/company/aucklan...
8. https://www.youtube.com/user/aucklandtra...

Link to this

From: AT Official Information (AT)
Auckland Transport


Attachment image001.jpg
4K Download

Attachment image002.jpg
0K Download

Attachment image003.jpg
0K Download

Attachment image004.jpg
1K Download

Attachment image005.jpg
1K Download

Attachment image006.jpg
1K Download

Attachment Auckland Transport CAS 1048031 J2V2C2.pdf
162K Download View as HTML

Attachment Hopetoun St Renewal.pdf
1.1M Download View as HTML


Dear Mr Toepfer

 

Further to my email, the attachment was missed. I have attached this for
your reference.

 

Kind regards

 

Deepa Pathak | LGOIMA Business Partner [3]Description: Description:
Description: Description:
LGOIMA Portfolio | Customer Liaison Team Description: Description:
20 Viaduct Harbour Ave, Auckland 1010 Description: Description:
Description: Description:
P 09 355 3553   Description: Email-Signature

E [1][email address] or
[2][email address]

Working together to create an awesome journey
–first time, every time

[4]cid:image002.jpg@01D238E0.86F57A30[5]cid:image003.jpg@01D238E0.86F57A30 [6]cid:image004.jpg@01D238E0.86F57A30 [7]cid:image005.jpg@01D238E0.86F57A30[8]cid:image006.jpg@01D238E0.86F57A30

 

 

 

From: AT Official Information (AT)
Sent: Friday, 14 June 2019 8:04 a.m.
To: [FOI #10267 email]
Subject: Auckland Transport CAS-1048031-J2V2C2 - Scope and status of
Hopetoun St road maintenance work

 

Dear Mr Toepfer

 

We refer to your request for official information dated 7 May 2019
regarding the Hopetoun St-Ponsonby Road to Motorway Overbridge resurfacing
project.

 

Please find attached a response for information requested under the Local
Government Official Information and Meetings Act 1987

 

Kind regards

 

Deepa Pathak | LGOIMA Business Partner [11]Description:
Description: Description:
LGOIMA Portfolio | Customer Liaison Team Description: Description:
20 Viaduct Harbour Ave, Auckland 1010 Description: Description:
Description: Description:
P 09 355 3553   Description: Description:
Email-Signature
E [9][email address] or
[10][email address]

Working together to create an awesome journey
–first time, every time

[12]cid:image002.jpg@01D238E0.86F57A30[13]cid:image003.jpg@01D238E0.86F57A30 [14]cid:image004.jpg@01D238E0.86F57A30 [15]cid:image005.jpg@01D238E0.86F57A30[16]cid:image006.jpg@01D238E0.86F57A30

 

 

Important notice: The contents of this email and any attachments may be
confidential and subject to legal privilege. If you have received this
email message in error please notify us immediately and erase all copies
of the message and attachments; any use, disclosure or copying of this
message or attachments is prohibited. Any views expressed in this email
may be those of the individual sender and may not necessarily reflect the
views of Auckland Transport.

References

Visible links
1. mailto:[email address]
2. mailto:[email address]
4. http://www.facebook.com/akltransport
5. https://twitter.com/akltransport
6. https://www.instagram.com/akltransport/
7. https://www.linkedin.com/company/aucklan...
8. https://www.youtube.com/user/aucklandtra...
9. mailto:[email address]
10. mailto:[email address]
12. http://www.facebook.com/akltransport
13. https://twitter.com/akltransport
14. https://www.instagram.com/akltransport/
15. https://www.linkedin.com/company/aucklan...
16. https://www.youtube.com/user/aucklandtra...

Link to this

Things to do with this request

Anyone:
Auckland Transport only: