Building Projects Under Review
A Collins made this Official Information request to Ministry of Education
This request has an unknown status. We're waiting for A Collins to read recent responses and update the status.
      From: A Collins
      
    
    Dear Ministry of Education,
Under the Official Information Act 1982, I request the following:
• Detail of any proposed or planned major building projects at schools that are under consideration or are confirmed for reprioritisation, rescoping, pausing or delay and the dates that the decisions on these actions were made or are proposed to be finalised.
• Copies of all advice, briefings, memos or any other documents provided by Ministry of Education staff or representatives to the Minister of Education or her office regarding any other proposed or planned major building projects at schools that are under consideration or are confirmed for reprioritisation, rescoping, pausing or delay.
Yours faithfully,
A Collins
        From: Enquiries National
        Ministry of Education
      
    
    Tēnā koe mō tō īmēra mai ki te Tāhuhu o Thank you for your email to the
te Mātauranga.   Ministry of Education.  
     
He urupare aunoa tēnei hei whakaatu kua This is an auto generated response
tae mai tō īmēra confirming your email has been
ki a mātou. Kaua noa e whakautu i tēnei received. Please do not respond to this
karere.   message.  
     
Mea ake nei ka urupare tonu atu mātou ki We will respond to your email as soon
tō īmēra.   as possible.  
 
  
show quoted sections
        From: Enquiries National
        Ministry of Education
      
    
    Kia ora A Collins
 
Thank you for your request for information below. The Ministry will
 consider and respond to your request in accordance with the Official
 Information Act 1982 (the Act).
 
Under section 15(1) of the Act, we are required to make and inform you of
 our decision on your request as soon as reasonably practicable and in any
 case not later than 20 working days after the day on which your request is
 received.  You can therefore expect to receive our decision on your
 request on or before the 11 March 2024.  If more than 20 working days are
 needed due to the potential workload and/or consultations involved in
 answering your request, we will notify you accordingly.
 
The Ministry may publicly release on our website the response to your
 request five days after you have received it. Any personal information
 will be removed.
 
In the interim, if you have any questions about your request, please email
 [1][email address].
 
Ngā mihi
 
Enquiries National Team | Ministry of Education - TW
 [2]education.govt.nz  |  [3]Follow us on Twitter: @educationgovtnz
[4]Te TD huhu o te MD tauranga
 
 
 
 
show quoted sections
        From: Enquiries National
        Ministry of Education
      
    
    Kia ora A Collins,
 
Thank you for the following three requests to the Ministry of Education
 (the Ministry) for information under the Official Information Act 1982
 (the Act):
Request 1322705:
• Detail of all schools planned or proposed to have major building
 projects reprioritised, paused or delayed and the dates that the decisions
 on these actions were made or are proposed to be finalised.
• Copies of all advice, briefings, memos or any other documents provided
 by Ministry of Education staff or representatives to the Minister of
 Education or her office regarding the reprioritisation, rescoping,
 pausing, or delaying of major building projects at schools, since 20
 November 2023.
• Any further reports the Minister or her Office have been sent by
 Ministry of Education staff or representatives regarding the
 reprioritisation, rescoping, pausing, or delaying of major building
 projects at schools, since 20 November 2023.
Request 1322722:
• Copies of all internal correspondence including but not limited to
 emails; letters; text, Whatsapp, Signal, Telegram, and Microsoft Teams
 messages sent or received by any Ministry of Education staff or
 representatives regarding the reprioritisation, rescoping, pausing, or
 delaying of major building projects at schools, since 20 November 2023.
• Copies of all external correspondence including but not limited to
 emails; letters; text, Whatsapp, Signal, Telegram, and Microsoft Teams
 messages sent or received by any Ministry of Education staff or
 representatives regarding the reprioritisation, rescoping, pausing, or
 delaying of major building projects at schools, since 20 November 2023.
• Copies of all correspondence including but not limited to emails;
 letters; text, Whatsapp, Signal, Telegram, and Microsoft Teams messages
 sent or received by any Ministry of Education staff or representatives
 regarding the reprioritisation, rescoping, pausing, or delaying of major
 building projects at schools, since 20 November 2023.
• Copies of all advice, briefings, memos or any other documents provided
 by Ministry of Education staff or representatives to the Minister of
 Education regarding the reprioritisation, rescoping, pausing, or delaying
 of major building projects at schools, since 20 November 2023.
• Any further reports the Minister or her Office have received from
 Ministry of Education staff or representatives regarding the
 reprioritisation, rescoping, pausing, or delaying of major building
 projects at schools, since 20 November 2023.
Request 1322723:
• Detail of any proposed or planned major building projects at schools
 that are under consideration or are confirmed for reprioritisation,
 rescoping, pausing or delay and the dates that the decisions on these
 actions were made or are proposed to be finalised.
• Copies of all advice, briefings, memos or any other documents provided
 by Ministry of Education staff or representatives to the Minister of
 Education or her office regarding any other proposed or planned major
 building projects at schools that are under consideration or are confirmed
 for reprioritisation, rescoping, pausing or delay.
Due to the similarity of subject matter and short succession your requests
 were made, we intend to respond to your requests with as a single request
 with a single response letter, as the following interpretation of your
 requests:
 
 1. Details of any proposed or planned major building projects at schools
 that are under consideration or are confirmed for reprioritisation,
 rescoping, pausing or delay and the dates that the decisions on these
 actions were made or are proposed to be finalised.
 
 2. Copies of all advice, briefings, memos or any other documents provided
 by the Ministry to the Minister regarding the reprioritisation,
 rescoping, pausing, or delaying of proposed or planned major building
 projects at schools, since 20 November 2023.
 
 3. Copies of all internal correspondence regarding the reprioritisation,
 rescoping, pausing, or delaying of major building projects at schools,
 since 20 November 2023.
 
 4. Copies of all external correspondence sent or received by the Ministry
 regarding the reprioritisation, rescoping, pausing, or delaying of
 major building projects at schools, since 20 November 2023.
 
Regarding the third and fourth parts of this request, we have identified
 that collating the information that is in scope would amount to
 substantial collation and research, and could therefore be refused under
 section 18(d) of the Act.
 
Regarding the third part of the request, we propose you refine it to
 internal correspondence with tier 1 and tier 2 staff, as we believe this
 would be more manageable and would likely provide information that could
 be of interest.
 
Regarding the fourth part of your request, we have identified that this
 could include correspondence with individual schools and members of their
 communities, the Office of the Minister of Education, and the media. We
 invite you to refine the scope of this request be specifying which
 external correspondence in particular you are after, such as whether it is
 with a specific school or person.
 
We look forward to your clarification and confirmation regarding the
 refining of your request for information. Once we have received this we
 can begin collating the information that you wish to receive.
 
Ngâ mihi nui
 
Enquiries National Team | Te Tâhuhu o te Mâtauranga | Ministry of
 Education | MC
 [1]education.govt.nz
 We shape an education system that delivers equitable and excellent
 outcomes
 He mea târai e mâtou te mâtauranga kia rangatira ai, kia mana taurite ai
 ôna huanga
 [2]Te TD huhu o te MD tauranga
 
show quoted sections
        From: Enquiries National
        Ministry of Education
      
    
    Kia ora A Collins,
 
Thank you for the following three requests to the Ministry of Education
 (the Ministry) for information under the Official Information Act 1982
 (the Act):
Request 1322705:
• Detail of all schools planned or proposed to have major building
 projects reprioritised, paused or delayed and the dates that the decisions
 on these actions were made or are proposed to be finalised.
• Copies of all advice, briefings, memos or any other documents provided
 by Ministry of Education staff or representatives to the Minister of
 Education or her office regarding the reprioritisation, rescoping,
 pausing, or delaying of major building projects at schools, since 20
 November 2023.
• Any further reports the Minister or her Office have been sent by
 Ministry of Education staff or representatives regarding the
 reprioritisation, rescoping, pausing, or delaying of major building
 projects at schools, since 20 November 2023.
Request 1322722:
• Copies of all internal correspondence including but not limited to
 emails; letters; text, Whatsapp, Signal, Telegram, and Microsoft Teams
 messages sent or received by any Ministry of Education staff or
 representatives regarding the reprioritisation, rescoping, pausing, or
 delaying of major building projects at schools, since 20 November 2023.
• Copies of all external correspondence including but not limited to
 emails; letters; text, Whatsapp, Signal, Telegram, and Microsoft Teams
 messages sent or received by any Ministry of Education staff or
 representatives regarding the reprioritisation, rescoping, pausing, or
 delaying of major building projects at schools, since 20 November 2023.
• Copies of all correspondence including but not limited to emails;
 letters; text, Whatsapp, Signal, Telegram, and Microsoft Teams messages
 sent or received by any Ministry of Education staff or representatives
 regarding the reprioritisation, rescoping, pausing, or delaying of major
 building projects at schools, since 20 November 2023.
• Copies of all advice, briefings, memos or any other documents provided
 by Ministry of Education staff or representatives to the Minister of
 Education regarding the reprioritisation, rescoping, pausing, or delaying
 of major building projects at schools, since 20 November 2023.
• Any further reports the Minister or her Office have received from
 Ministry of Education staff or representatives regarding the
 reprioritisation, rescoping, pausing, or delaying of major building
 projects at schools, since 20 November 2023.
Request 1322723:
• Detail of any proposed or planned major building projects at schools
 that are under consideration or are confirmed for reprioritisation,
 rescoping, pausing or delay and the dates that the decisions on these
 actions were made or are proposed to be finalised.
• Copies of all advice, briefings, memos or any other documents provided
 by Ministry of Education staff or representatives to the Minister of
 Education or her office regarding any other proposed or planned major
 building projects at schools that are under consideration or are confirmed
 for reprioritisation, rescoping, pausing or delay.
Due to the similarity of subject matter and short succession your requests
 were made, we intend to respond to your requests with as a single request
 with a single response letter, as the following interpretation of your
 requests:
 
 1. Details of any proposed or planned major building projects at schools
 that are under consideration or are confirmed for reprioritisation,
 rescoping, pausing or delay and the dates that the decisions on these
 actions were made or are proposed to be finalised.
 
 2. Copies of all advice, briefings, memos or any other documents provided
 by the Ministry to the Minister regarding the reprioritisation,
 rescoping, pausing, or delaying of proposed or planned major building
 projects at schools, since 20 November 2023.
 
 3. Copies of all internal correspondence regarding the reprioritisation,
 rescoping, pausing, or delaying of major building projects at schools,
 since 20 November 2023.
 
 4. Copies of all external correspondence sent or received by the Ministry
 regarding the reprioritisation, rescoping, pausing, or delaying of
 major building projects at schools, since 20 November 2023.
 
Regarding the third and fourth parts of this request, we have identified
 that collating the information that is in scope would amount to
 substantial collation and research, and could therefore be refused under
 section 18(d) of the Act.
 
Regarding the third part of the request, we propose you refine it to
 internal correspondence with tier 1 and tier 2 staff, as we believe this
 would be more manageable and would likely provide information that could
 be of interest.
 
Regarding the fourth part of your request, we have identified that this
 could include correspondence with individual schools and members of their
 communities, the Office of the Minister of Education, and the media. We
 invite you to refine the scope of this request be specifying which
 external correspondence in particular you are after, such as whether it is
 with a specific school or person.
 
We look forward to your clarification and confirmation regarding the
 refining of your request for information. Once we have received this we
 can begin collating the information that you wish to receive.
 
Ngâ mihi nui
 
Enquiries National Team | Te Tâhuhu o te Mâtauranga | Ministry of
 Education | MC
 [1]education.govt.nz
 We shape an education system that delivers equitable and excellent
 outcomes
 He mea târai e mâtou te mâtauranga kia rangatira ai, kia mana taurite ai
 ôna huanga
 [2]Te TD huhu o te MD tauranga
 
show quoted sections
        From: Enquiries National
        Ministry of Education
      
    
    Kia ora A Collins,
 
Thank you for the following three requests to the Ministry of Education
 (the Ministry) for information under the Official Information Act 1982
 (the Act):
Request 1322705:
• Detail of all schools planned or proposed to have major building
 projects reprioritised, paused or delayed and the dates that the decisions
 on these actions were made or are proposed to be finalised.
• Copies of all advice, briefings, memos or any other documents provided
 by Ministry of Education staff or representatives to the Minister of
 Education or her office regarding the reprioritisation, rescoping,
 pausing, or delaying of major building projects at schools, since 20
 November 2023.
• Any further reports the Minister or her Office have been sent by
 Ministry of Education staff or representatives regarding the
 reprioritisation, rescoping, pausing, or delaying of major building
 projects at schools, since 20 November 2023.
Request 1322722:
• Copies of all internal correspondence including but not limited to
 emails; letters; text, Whatsapp, Signal, Telegram, and Microsoft Teams
 messages sent or received by any Ministry of Education staff or
 representatives regarding the reprioritisation, rescoping, pausing, or
 delaying of major building projects at schools, since 20 November 2023.
• Copies of all external correspondence including but not limited to
 emails; letters; text, Whatsapp, Signal, Telegram, and Microsoft Teams
 messages sent or received by any Ministry of Education staff or
 representatives regarding the reprioritisation, rescoping, pausing, or
 delaying of major building projects at schools, since 20 November 2023.
• Copies of all correspondence including but not limited to emails;
 letters; text, Whatsapp, Signal, Telegram, and Microsoft Teams messages
 sent or received by any Ministry of Education staff or representatives
 regarding the reprioritisation, rescoping, pausing, or delaying of major
 building projects at schools, since 20 November 2023.
• Copies of all advice, briefings, memos or any other documents provided
 by Ministry of Education staff or representatives to the Minister of
 Education regarding the reprioritisation, rescoping, pausing, or delaying
 of major building projects at schools, since 20 November 2023.
• Any further reports the Minister or her Office have received from
 Ministry of Education staff or representatives regarding the
 reprioritisation, rescoping, pausing, or delaying of major building
 projects at schools, since 20 November 2023.
Request 1322723:
• Detail of any proposed or planned major building projects at schools
 that are under consideration or are confirmed for reprioritisation,
 rescoping, pausing or delay and the dates that the decisions on these
 actions were made or are proposed to be finalised.
• Copies of all advice, briefings, memos or any other documents provided
 by Ministry of Education staff or representatives to the Minister of
 Education or her office regarding any other proposed or planned major
 building projects at schools that are under consideration or are confirmed
 for reprioritisation, rescoping, pausing or delay.
Due to the similarity of subject matter and short succession your requests
 were made, we intend to respond to your requests with as a single request
 with a single response letter, as the following interpretation of your
 requests:
 
 1. Details of any proposed or planned major building projects at schools
 that are under consideration or are confirmed for reprioritisation,
 rescoping, pausing or delay and the dates that the decisions on these
 actions were made or are proposed to be finalised.
 
 2. Copies of all advice, briefings, memos or any other documents provided
 by the Ministry to the Minister regarding the reprioritisation,
 rescoping, pausing, or delaying of proposed or planned major building
 projects at schools, since 20 November 2023.
 
 3. Copies of all internal correspondence regarding the reprioritisation,
 rescoping, pausing, or delaying of major building projects at schools,
 since 20 November 2023.
 
 4. Copies of all external correspondence sent or received by the Ministry
 regarding the reprioritisation, rescoping, pausing, or delaying of
 major building projects at schools, since 20 November 2023.
 
Regarding the third and fourth parts of this request, we have identified
 that collating the information that is in scope would amount to
 substantial collation and research, and could therefore be refused under
 section 18(d) of the Act.
 
Regarding the third part of the request, we propose you refine it to
 internal correspondence with tier 1 and tier 2 staff, as we believe this
 would be more manageable and would likely provide information that could
 be of interest.
 
Regarding the fourth part of your request, we have identified that this
 could include correspondence with individual schools and members of their
 communities, the Office of the Minister of Education, and the media. We
 invite you to refine the scope of this request be specifying which
 external correspondence in particular you are after, such as whether it is
 with a specific school or person.
 
We look forward to your clarification and confirmation regarding the
 refining of your request for information. Once we have received this we
 can begin collating the information that you wish to receive.
 
Ngâ mihi nui
 
Enquiries National Team | Te Tâhuhu o te Mâtauranga | Ministry of
 Education | MC
 [1]education.govt.nz
 We shape an education system that delivers equitable and excellent
 outcomes
 He mea târai e mâtou te mâtauranga kia rangatira ai, kia mana taurite ai
 ôna huanga
 [2]Te TD huhu o te MD tauranga
 
show quoted sections
        From: Enquiries National
        Ministry of Education
      
    
    Kia ora A Collins,
 
Thank you for the following three requests to the Ministry of Education
 (the Ministry) for information under the Official Information Act 1982
 (the Act):
Request 1322705:
• Detail of all schools planned or proposed to have major building
 projects reprioritised, paused or delayed and the dates that the decisions
 on these actions were made or are proposed to be finalised.
• Copies of all advice, briefings, memos or any other documents provided
 by Ministry of Education staff or representatives to the Minister of
 Education or her office regarding the reprioritisation, rescoping,
 pausing, or delaying of major building projects at schools, since 20
 November 2023.
• Any further reports the Minister or her Office have been sent by
 Ministry of Education staff or representatives regarding the
 reprioritisation, rescoping, pausing, or delaying of major building
 projects at schools, since 20 November 2023.
Request 1322722:
• Copies of all internal correspondence including but not limited to
 emails; letters; text, Whatsapp, Signal, Telegram, and Microsoft Teams
 messages sent or received by any Ministry of Education staff or
 representatives regarding the reprioritisation, rescoping, pausing, or
 delaying of major building projects at schools, since 20 November 2023.
• Copies of all external correspondence including but not limited to
 emails; letters; text, Whatsapp, Signal, Telegram, and Microsoft Teams
 messages sent or received by any Ministry of Education staff or
 representatives regarding the reprioritisation, rescoping, pausing, or
 delaying of major building projects at schools, since 20 November 2023.
• Copies of all correspondence including but not limited to emails;
 letters; text, Whatsapp, Signal, Telegram, and Microsoft Teams messages
 sent or received by any Ministry of Education staff or representatives
 regarding the reprioritisation, rescoping, pausing, or delaying of major
 building projects at schools, since 20 November 2023.
• Copies of all advice, briefings, memos or any other documents provided
 by Ministry of Education staff or representatives to the Minister of
 Education regarding the reprioritisation, rescoping, pausing, or delaying
 of major building projects at schools, since 20 November 2023.
• Any further reports the Minister or her Office have received from
 Ministry of Education staff or representatives regarding the
 reprioritisation, rescoping, pausing, or delaying of major building
 projects at schools, since 20 November 2023.
Request 1322723:
• Detail of any proposed or planned major building projects at schools
 that are under consideration or are confirmed for reprioritisation,
 rescoping, pausing or delay and the dates that the decisions on these
 actions were made or are proposed to be finalised.
• Copies of all advice, briefings, memos or any other documents provided
 by Ministry of Education staff or representatives to the Minister of
 Education or her office regarding any other proposed or planned major
 building projects at schools that are under consideration or are confirmed
 for reprioritisation, rescoping, pausing or delay.
As advised in our emails to you on 19 February 2024, due to the similarity
 of subject matter and short succession your requests were made, we intend
 to respond to your requests with as a single request with a single
 response letter, as the following interpretation of your requests:
 
 1. Details of any proposed or planned major building projects at schools
 that are under consideration or are confirmed for reprioritisation,
 rescoping, pausing or delay and the dates that the decisions on these
 actions were made or are proposed to be finalised.
 
 2. Copies of all advice, briefings, memos or any other documents provided
 by the Ministry to the Minister regarding the reprioritisation,
 rescoping, pausing, or delaying of proposed or planned major building
 projects at schools, since 20 November 2023.
 
 3. Copies of all internal correspondence regarding the reprioritisation,
 rescoping, pausing, or delaying of major building projects at schools,
 since 20 November 2023.
 
 4. Copies of all external correspondence sent or received by the Ministry
 regarding the reprioritisation, rescoping, pausing, or delaying of
 major building projects at schools, since 20 November 2023.
 
Additionally, on 19 February 2024 we advised you that we required
 clarification of parts of your request. Can you please provide
 clarification regarding the following information by 28 February 2024.
 Failure to clarify your request may mean it could therefore be refused
 under section 18(f) of the Act, as the information could not be made
 available without substantial collation or research.
 
Regarding the third part of the request, we propose you refine it to
 internal correspondence with tier 1 and tier 2 staff, as we believe this
 would be more manageable and would likely provide information that could
 be of interest.
 
Regarding the fourth part of your request, we have identified that this
 could include correspondence with individual schools and members of their
 communities, the Office of the Minister of Education, and the media. We
 invite you to refine the scope of this request be specifying which
 external correspondence in particular you are after, such as whether it is
 with a specific school or person.
 
We look forward to your clarification and confirmation regarding the
 refining of your request for information. Once we have received this we
 can begin collating the information that you wish to receive.
 
Ngâ mihi nui
 
Enquiries National Team | Te Tâhuhu o te Mâtauranga | Ministry of
 Education | TW
[1]education.govt.nz
We shape an education system that delivers equitable and excellent
 outcomes
 He mea târai e mâtou te mâtauranga kia rangatira ai, kia mana taurite ai
 ôna huanga
 [2]Te TD huhu o te MD tauranga
 
 
 
From: Enquiries National
 Sent: Monday, February 19, 2024 9:31 AM
 To: [3][email address];
 [4][email address];
 [5][FOI #25715 email]
 Subject: Official Information Act requests - 1322705/1322722/1322723
 
Kia ora A Collins,
 
Thank you for the following three requests to the Ministry of Education
 (the Ministry) for information under the Official Information Act 1982
 (the Act):
Request 1322705:
• Detail of all schools planned or proposed to have major building
 projects reprioritised, paused or delayed and the dates that the decisions
 on these actions were made or are proposed to be finalised.
• Copies of all advice, briefings, memos or any other documents provided
 by Ministry of Education staff or representatives to the Minister of
 Education or her office regarding the reprioritisation, rescoping,
 pausing, or delaying of major building projects at schools, since 20
 November 2023.
• Any further reports the Minister or her Office have been sent by
 Ministry of Education staff or representatives regarding the
 reprioritisation, rescoping, pausing, or delaying of major building
 projects at schools, since 20 November 2023.
Request 1322722:
• Copies of all internal correspondence including but not limited to
 emails; letters; text, Whatsapp, Signal, Telegram, and Microsoft Teams
 messages sent or received by any Ministry of Education staff or
 representatives regarding the reprioritisation, rescoping, pausing, or
 delaying of major building projects at schools, since 20 November 2023.
• Copies of all external correspondence including but not limited to
 emails; letters; text, Whatsapp, Signal, Telegram, and Microsoft Teams
 messages sent or received by any Ministry of Education staff or
 representatives regarding the reprioritisation, rescoping, pausing, or
 delaying of major building projects at schools, since 20 November 2023.
• Copies of all correspondence including but not limited to emails;
 letters; text, Whatsapp, Signal, Telegram, and Microsoft Teams messages
 sent or received by any Ministry of Education staff or representatives
 regarding the reprioritisation, rescoping, pausing, or delaying of major
 building projects at schools, since 20 November 2023.
• Copies of all advice, briefings, memos or any other documents provided
 by Ministry of Education staff or representatives to the Minister of
 Education regarding the reprioritisation, rescoping, pausing, or delaying
 of major building projects at schools, since 20 November 2023.
• Any further reports the Minister or her Office have received from
 Ministry of Education staff or representatives regarding the
 reprioritisation, rescoping, pausing, or delaying of major building
 projects at schools, since 20 November 2023.
Request 1322723:
• Detail of any proposed or planned major building projects at schools
 that are under consideration or are confirmed for reprioritisation,
 rescoping, pausing or delay and the dates that the decisions on these
 actions were made or are proposed to be finalised.
• Copies of all advice, briefings, memos or any other documents provided
 by Ministry of Education staff or representatives to the Minister of
 Education or her office regarding any other proposed or planned major
 building projects at schools that are under consideration or are confirmed
 for reprioritisation, rescoping, pausing or delay.
Due to the similarity of subject matter and short succession your requests
 were made, we intend to respond to your requests with as a single request
 with a single response letter, as the following interpretation of your
 requests:
 
 1. Details of any proposed or planned major building projects at schools
 that are under consideration or are confirmed for reprioritisation,
 rescoping, pausing or delay and the dates that the decisions on these
 actions were made or are proposed to be finalised.
 
 2. Copies of all advice, briefings, memos or any other documents provided
 by the Ministry to the Minister regarding the reprioritisation,
 rescoping, pausing, or delaying of proposed or planned major building
 projects at schools, since 20 November 2023.
 
 3. Copies of all internal correspondence regarding the reprioritisation,
 rescoping, pausing, or delaying of major building projects at schools,
 since 20 November 2023.
 
 4. Copies of all external correspondence sent or received by the Ministry
 regarding the reprioritisation, rescoping, pausing, or delaying of
 major building projects at schools, since 20 November 2023.
 
Regarding the third and fourth parts of this request, we have identified
 that collating the information that is in scope would amount to
 substantial collation and research, and could therefore be refused under
 section 18(d) of the Act.
 
Regarding the third part of the request, we propose you refine it to
 internal correspondence with tier 1 and tier 2 staff, as we believe this
 would be more manageable and would likely provide information that could
 be of interest.
 
Regarding the fourth part of your request, we have identified that this
 could include correspondence with individual schools and members of their
 communities, the Office of the Minister of Education, and the media. We
 invite you to refine the scope of this request be specifying which
 external correspondence in particular you are after, such as whether it is
 with a specific school or person.
 
We look forward to your clarification and confirmation regarding the
 refining of your request for information. Once we have received this we
 can begin collating the information that you wish to receive.
 
Ngâ mihi nui
 
Enquiries National Team | Te Tâhuhu o te Mâtauranga | Ministry of
 Education | MC
 [6]education.govt.nz
 We shape an education system that delivers equitable and excellent
 outcomes
 He mea târai e mâtou te mâtauranga kia rangatira ai, kia mana taurite ai
 ôna huanga
 [7]Te TD huhu o te MD tauranga
 
show quoted sections
        From: Enquiries National
        Ministry of Education
      
    
    Kia ora A Collins,
 
Thank you for the following three requests to the Ministry of Education
 (the Ministry) for information under the Official Information Act 1982
 (the Act):
Request 1322705:
• Detail of all schools planned or proposed to have major building
 projects reprioritised, paused or delayed and the dates that the decisions
 on these actions were made or are proposed to be finalised.
• Copies of all advice, briefings, memos or any other documents provided
 by Ministry of Education staff or representatives to the Minister of
 Education or her office regarding the reprioritisation, rescoping,
 pausing, or delaying of major building projects at schools, since 20
 November 2023.
• Any further reports the Minister or her Office have been sent by
 Ministry of Education staff or representatives regarding the
 reprioritisation, rescoping, pausing, or delaying of major building
 projects at schools, since 20 November 2023.
Request 1322722:
• Copies of all internal correspondence including but not limited to
 emails; letters; text, Whatsapp, Signal, Telegram, and Microsoft Teams
 messages sent or received by any Ministry of Education staff or
 representatives regarding the reprioritisation, rescoping, pausing, or
 delaying of major building projects at schools, since 20 November 2023.
• Copies of all external correspondence including but not limited to
 emails; letters; text, Whatsapp, Signal, Telegram, and Microsoft Teams
 messages sent or received by any Ministry of Education staff or
 representatives regarding the reprioritisation, rescoping, pausing, or
 delaying of major building projects at schools, since 20 November 2023.
• Copies of all correspondence including but not limited to emails;
 letters; text, Whatsapp, Signal, Telegram, and Microsoft Teams messages
 sent or received by any Ministry of Education staff or representatives
 regarding the reprioritisation, rescoping, pausing, or delaying of major
 building projects at schools, since 20 November 2023.
• Copies of all advice, briefings, memos or any other documents provided
 by Ministry of Education staff or representatives to the Minister of
 Education regarding the reprioritisation, rescoping, pausing, or delaying
 of major building projects at schools, since 20 November 2023.
• Any further reports the Minister or her Office have received from
 Ministry of Education staff or representatives regarding the
 reprioritisation, rescoping, pausing, or delaying of major building
 projects at schools, since 20 November 2023.
Request 1322723:
• Detail of any proposed or planned major building projects at schools
 that are under consideration or are confirmed for reprioritisation,
 rescoping, pausing or delay and the dates that the decisions on these
 actions were made or are proposed to be finalised.
• Copies of all advice, briefings, memos or any other documents provided
 by Ministry of Education staff or representatives to the Minister of
 Education or her office regarding any other proposed or planned major
 building projects at schools that are under consideration or are confirmed
 for reprioritisation, rescoping, pausing or delay.
As advised in our emails to you on 19 February 2024, due to the similarity
 of subject matter and short succession your requests were made, we intend
 to respond to your requests with as a single request with a single
 response letter, as the following interpretation of your requests:
 
 1. Details of any proposed or planned major building projects at schools
 that are under consideration or are confirmed for reprioritisation,
 rescoping, pausing or delay and the dates that the decisions on these
 actions were made or are proposed to be finalised.
 
 2. Copies of all advice, briefings, memos or any other documents provided
 by the Ministry to the Minister regarding the reprioritisation,
 rescoping, pausing, or delaying of proposed or planned major building
 projects at schools, since 20 November 2023.
 
 3. Copies of all internal correspondence regarding the reprioritisation,
 rescoping, pausing, or delaying of major building projects at schools,
 since 20 November 2023.
 
 4. Copies of all external correspondence sent or received by the Ministry
 regarding the reprioritisation, rescoping, pausing, or delaying of
 major building projects at schools, since 20 November 2023.
 
Additionally, on 19 February 2024 we advised you that we required
 clarification of parts of your request. Can you please provide
 clarification regarding the following information by 28 February 2024.
 Failure to clarify your request may mean it could therefore be refused
 under section 18(f) of the Act, as the information could not be made
 available without substantial collation or research.
 
Regarding the third part of the request, we propose you refine it to
 internal correspondence with tier 1 and tier 2 staff, as we believe this
 would be more manageable and would likely provide information that could
 be of interest.
 
Regarding the fourth part of your request, we have identified that this
 could include correspondence with individual schools and members of their
 communities, the Office of the Minister of Education, and the media. We
 invite you to refine the scope of this request be specifying which
 external correspondence in particular you are after, such as whether it is
 with a specific school or person.
 
We look forward to your clarification and confirmation regarding the
 refining of your request for information. Once we have received this we
 can begin collating the information that you wish to receive.
 
Ngâ mihi nui
 
Enquiries National Team | Te Tâhuhu o te Mâtauranga | Ministry of
 Education | TW
[1]education.govt.nz
We shape an education system that delivers equitable and excellent
 outcomes
 He mea târai e mâtou te mâtauranga kia rangatira ai, kia mana taurite ai
 ôna huanga
 [2]Te TD huhu o te MD tauranga
 
 
 
From: Enquiries National
 Sent: Monday, February 19, 2024 9:31 AM
 To: [3][email address];
 [4][email address];
 [5][FOI #25715 email]
 Subject: Official Information Act requests - 1322705/1322722/1322723
 
Kia ora A Collins,
 
Thank you for the following three requests to the Ministry of Education
 (the Ministry) for information under the Official Information Act 1982
 (the Act):
Request 1322705:
• Detail of all schools planned or proposed to have major building
 projects reprioritised, paused or delayed and the dates that the decisions
 on these actions were made or are proposed to be finalised.
• Copies of all advice, briefings, memos or any other documents provided
 by Ministry of Education staff or representatives to the Minister of
 Education or her office regarding the reprioritisation, rescoping,
 pausing, or delaying of major building projects at schools, since 20
 November 2023.
• Any further reports the Minister or her Office have been sent by
 Ministry of Education staff or representatives regarding the
 reprioritisation, rescoping, pausing, or delaying of major building
 projects at schools, since 20 November 2023.
Request 1322722:
• Copies of all internal correspondence including but not limited to
 emails; letters; text, Whatsapp, Signal, Telegram, and Microsoft Teams
 messages sent or received by any Ministry of Education staff or
 representatives regarding the reprioritisation, rescoping, pausing, or
 delaying of major building projects at schools, since 20 November 2023.
• Copies of all external correspondence including but not limited to
 emails; letters; text, Whatsapp, Signal, Telegram, and Microsoft Teams
 messages sent or received by any Ministry of Education staff or
 representatives regarding the reprioritisation, rescoping, pausing, or
 delaying of major building projects at schools, since 20 November 2023.
• Copies of all correspondence including but not limited to emails;
 letters; text, Whatsapp, Signal, Telegram, and Microsoft Teams messages
 sent or received by any Ministry of Education staff or representatives
 regarding the reprioritisation, rescoping, pausing, or delaying of major
 building projects at schools, since 20 November 2023.
• Copies of all advice, briefings, memos or any other documents provided
 by Ministry of Education staff or representatives to the Minister of
 Education regarding the reprioritisation, rescoping, pausing, or delaying
 of major building projects at schools, since 20 November 2023.
• Any further reports the Minister or her Office have received from
 Ministry of Education staff or representatives regarding the
 reprioritisation, rescoping, pausing, or delaying of major building
 projects at schools, since 20 November 2023.
Request 1322723:
• Detail of any proposed or planned major building projects at schools
 that are under consideration or are confirmed for reprioritisation,
 rescoping, pausing or delay and the dates that the decisions on these
 actions were made or are proposed to be finalised.
• Copies of all advice, briefings, memos or any other documents provided
 by Ministry of Education staff or representatives to the Minister of
 Education or her office regarding any other proposed or planned major
 building projects at schools that are under consideration or are confirmed
 for reprioritisation, rescoping, pausing or delay.
Due to the similarity of subject matter and short succession your requests
 were made, we intend to respond to your requests with as a single request
 with a single response letter, as the following interpretation of your
 requests:
 
 1. Details of any proposed or planned major building projects at schools
 that are under consideration or are confirmed for reprioritisation,
 rescoping, pausing or delay and the dates that the decisions on these
 actions were made or are proposed to be finalised.
 
 2. Copies of all advice, briefings, memos or any other documents provided
 by the Ministry to the Minister regarding the reprioritisation,
 rescoping, pausing, or delaying of proposed or planned major building
 projects at schools, since 20 November 2023.
 
 3. Copies of all internal correspondence regarding the reprioritisation,
 rescoping, pausing, or delaying of major building projects at schools,
 since 20 November 2023.
 
 4. Copies of all external correspondence sent or received by the Ministry
 regarding the reprioritisation, rescoping, pausing, or delaying of
 major building projects at schools, since 20 November 2023.
 
Regarding the third and fourth parts of this request, we have identified
 that collating the information that is in scope would amount to
 substantial collation and research, and could therefore be refused under
 section 18(d) of the Act.
 
Regarding the third part of the request, we propose you refine it to
 internal correspondence with tier 1 and tier 2 staff, as we believe this
 would be more manageable and would likely provide information that could
 be of interest.
 
Regarding the fourth part of your request, we have identified that this
 could include correspondence with individual schools and members of their
 communities, the Office of the Minister of Education, and the media. We
 invite you to refine the scope of this request be specifying which
 external correspondence in particular you are after, such as whether it is
 with a specific school or person.
 
We look forward to your clarification and confirmation regarding the
 refining of your request for information. Once we have received this we
 can begin collating the information that you wish to receive.
 
Ngâ mihi nui
 
Enquiries National Team | Te Tâhuhu o te Mâtauranga | Ministry of
 Education | MC
 [6]education.govt.nz
 We shape an education system that delivers equitable and excellent
 outcomes
 He mea târai e mâtou te mâtauranga kia rangatira ai, kia mana taurite ai
 ôna huanga
 [7]Te TD huhu o te MD tauranga
 
show quoted sections
        From: Enquiries National
        Ministry of Education
      
    
    Kia ora A Collins,
 
Thank you for the following three requests to the Ministry of Education
 (the Ministry) for information under the Official Information Act 1982
 (the Act):
Request 1322705:
• Detail of all schools planned or proposed to have major building
 projects reprioritised, paused or delayed and the dates that the decisions
 on these actions were made or are proposed to be finalised.
• Copies of all advice, briefings, memos or any other documents provided
 by Ministry of Education staff or representatives to the Minister of
 Education or her office regarding the reprioritisation, rescoping,
 pausing, or delaying of major building projects at schools, since 20
 November 2023.
• Any further reports the Minister or her Office have been sent by
 Ministry of Education staff or representatives regarding the
 reprioritisation, rescoping, pausing, or delaying of major building
 projects at schools, since 20 November 2023.
Request 1322722:
• Copies of all internal correspondence including but not limited to
 emails; letters; text, Whatsapp, Signal, Telegram, and Microsoft Teams
 messages sent or received by any Ministry of Education staff or
 representatives regarding the reprioritisation, rescoping, pausing, or
 delaying of major building projects at schools, since 20 November 2023.
• Copies of all external correspondence including but not limited to
 emails; letters; text, Whatsapp, Signal, Telegram, and Microsoft Teams
 messages sent or received by any Ministry of Education staff or
 representatives regarding the reprioritisation, rescoping, pausing, or
 delaying of major building projects at schools, since 20 November 2023.
• Copies of all correspondence including but not limited to emails;
 letters; text, Whatsapp, Signal, Telegram, and Microsoft Teams messages
 sent or received by any Ministry of Education staff or representatives
 regarding the reprioritisation, rescoping, pausing, or delaying of major
 building projects at schools, since 20 November 2023.
• Copies of all advice, briefings, memos or any other documents provided
 by Ministry of Education staff or representatives to the Minister of
 Education regarding the reprioritisation, rescoping, pausing, or delaying
 of major building projects at schools, since 20 November 2023.
• Any further reports the Minister or her Office have received from
 Ministry of Education staff or representatives regarding the
 reprioritisation, rescoping, pausing, or delaying of major building
 projects at schools, since 20 November 2023.
Request 1322723:
• Detail of any proposed or planned major building projects at schools
 that are under consideration or are confirmed for reprioritisation,
 rescoping, pausing or delay and the dates that the decisions on these
 actions were made or are proposed to be finalised.
• Copies of all advice, briefings, memos or any other documents provided
 by Ministry of Education staff or representatives to the Minister of
 Education or her office regarding any other proposed or planned major
 building projects at schools that are under consideration or are confirmed
 for reprioritisation, rescoping, pausing or delay.
As advised in our emails to you on 19 February 2024, due to the similarity
 of subject matter and short succession your requests were made, we intend
 to respond to your requests with as a single request with a single
 response letter, as the following interpretation of your requests:
 
 1. Details of any proposed or planned major building projects at schools
 that are under consideration or are confirmed for reprioritisation,
 rescoping, pausing or delay and the dates that the decisions on these
 actions were made or are proposed to be finalised.
 
 2. Copies of all advice, briefings, memos or any other documents provided
 by the Ministry to the Minister regarding the reprioritisation,
 rescoping, pausing, or delaying of proposed or planned major building
 projects at schools, since 20 November 2023.
 
 3. Copies of all internal correspondence regarding the reprioritisation,
 rescoping, pausing, or delaying of major building projects at schools,
 since 20 November 2023.
 
 4. Copies of all external correspondence sent or received by the Ministry
 regarding the reprioritisation, rescoping, pausing, or delaying of
 major building projects at schools, since 20 November 2023.
 
Additionally, on 19 February 2024 we advised you that we required
 clarification of parts of your request. Can you please provide
 clarification regarding the following information by 28 February 2024.
 Failure to clarify your request may mean it could therefore be refused
 under section 18(f) of the Act, as the information could not be made
 available without substantial collation or research.
 
Regarding the third part of the request, we propose you refine it to
 internal correspondence with tier 1 and tier 2 staff, as we believe this
 would be more manageable and would likely provide information that could
 be of interest.
 
Regarding the fourth part of your request, we have identified that this
 could include correspondence with individual schools and members of their
 communities, the Office of the Minister of Education, and the media. We
 invite you to refine the scope of this request be specifying which
 external correspondence in particular you are after, such as whether it is
 with a specific school or person.
 
We look forward to your clarification and confirmation regarding the
 refining of your request for information. Once we have received this we
 can begin collating the information that you wish to receive.
 
Ngâ mihi nui
 
Enquiries National Team | Te Tâhuhu o te Mâtauranga | Ministry of
 Education | TW
[1]education.govt.nz
We shape an education system that delivers equitable and excellent
 outcomes
 He mea târai e mâtou te mâtauranga kia rangatira ai, kia mana taurite ai
 ôna huanga
 [2]Te TD huhu o te MD tauranga
 
 
 
From: Enquiries National
 Sent: Monday, February 19, 2024 9:31 AM
 To: [3][email address];
 [4][email address];
 [5][FOI #25715 email]
 Subject: Official Information Act requests - 1322705/1322722/1322723
 
Kia ora A Collins,
 
Thank you for the following three requests to the Ministry of Education
 (the Ministry) for information under the Official Information Act 1982
 (the Act):
Request 1322705:
• Detail of all schools planned or proposed to have major building
 projects reprioritised, paused or delayed and the dates that the decisions
 on these actions were made or are proposed to be finalised.
• Copies of all advice, briefings, memos or any other documents provided
 by Ministry of Education staff or representatives to the Minister of
 Education or her office regarding the reprioritisation, rescoping,
 pausing, or delaying of major building projects at schools, since 20
 November 2023.
• Any further reports the Minister or her Office have been sent by
 Ministry of Education staff or representatives regarding the
 reprioritisation, rescoping, pausing, or delaying of major building
 projects at schools, since 20 November 2023.
Request 1322722:
• Copies of all internal correspondence including but not limited to
 emails; letters; text, Whatsapp, Signal, Telegram, and Microsoft Teams
 messages sent or received by any Ministry of Education staff or
 representatives regarding the reprioritisation, rescoping, pausing, or
 delaying of major building projects at schools, since 20 November 2023.
• Copies of all external correspondence including but not limited to
 emails; letters; text, Whatsapp, Signal, Telegram, and Microsoft Teams
 messages sent or received by any Ministry of Education staff or
 representatives regarding the reprioritisation, rescoping, pausing, or
 delaying of major building projects at schools, since 20 November 2023.
• Copies of all correspondence including but not limited to emails;
 letters; text, Whatsapp, Signal, Telegram, and Microsoft Teams messages
 sent or received by any Ministry of Education staff or representatives
 regarding the reprioritisation, rescoping, pausing, or delaying of major
 building projects at schools, since 20 November 2023.
• Copies of all advice, briefings, memos or any other documents provided
 by Ministry of Education staff or representatives to the Minister of
 Education regarding the reprioritisation, rescoping, pausing, or delaying
 of major building projects at schools, since 20 November 2023.
• Any further reports the Minister or her Office have received from
 Ministry of Education staff or representatives regarding the
 reprioritisation, rescoping, pausing, or delaying of major building
 projects at schools, since 20 November 2023.
Request 1322723:
• Detail of any proposed or planned major building projects at schools
 that are under consideration or are confirmed for reprioritisation,
 rescoping, pausing or delay and the dates that the decisions on these
 actions were made or are proposed to be finalised.
• Copies of all advice, briefings, memos or any other documents provided
 by Ministry of Education staff or representatives to the Minister of
 Education or her office regarding any other proposed or planned major
 building projects at schools that are under consideration or are confirmed
 for reprioritisation, rescoping, pausing or delay.
Due to the similarity of subject matter and short succession your requests
 were made, we intend to respond to your requests with as a single request
 with a single response letter, as the following interpretation of your
 requests:
 
 1. Details of any proposed or planned major building projects at schools
 that are under consideration or are confirmed for reprioritisation,
 rescoping, pausing or delay and the dates that the decisions on these
 actions were made or are proposed to be finalised.
 
 2. Copies of all advice, briefings, memos or any other documents provided
 by the Ministry to the Minister regarding the reprioritisation,
 rescoping, pausing, or delaying of proposed or planned major building
 projects at schools, since 20 November 2023.
 
 3. Copies of all internal correspondence regarding the reprioritisation,
 rescoping, pausing, or delaying of major building projects at schools,
 since 20 November 2023.
 
 4. Copies of all external correspondence sent or received by the Ministry
 regarding the reprioritisation, rescoping, pausing, or delaying of
 major building projects at schools, since 20 November 2023.
 
Regarding the third and fourth parts of this request, we have identified
 that collating the information that is in scope would amount to
 substantial collation and research, and could therefore be refused under
 section 18(d) of the Act.
 
Regarding the third part of the request, we propose you refine it to
 internal correspondence with tier 1 and tier 2 staff, as we believe this
 would be more manageable and would likely provide information that could
 be of interest.
 
Regarding the fourth part of your request, we have identified that this
 could include correspondence with individual schools and members of their
 communities, the Office of the Minister of Education, and the media. We
 invite you to refine the scope of this request be specifying which
 external correspondence in particular you are after, such as whether it is
 with a specific school or person.
 
We look forward to your clarification and confirmation regarding the
 refining of your request for information. Once we have received this we
 can begin collating the information that you wish to receive.
 
Ngâ mihi nui
 
Enquiries National Team | Te Tâhuhu o te Mâtauranga | Ministry of
 Education | MC
 [6]education.govt.nz
 We shape an education system that delivers equitable and excellent
 outcomes
 He mea târai e mâtou te mâtauranga kia rangatira ai, kia mana taurite ai
 ôna huanga
 [7]Te TD huhu o te MD tauranga
 
show quoted sections
        From: Ministerial Requests
        Ministry of Education
      
    
    Kia ora A Collins,
Thank you for the confirmation of the interpretation of your requests and the clarification you have provided.
Due to the similar nature of those three requests and the interpretation, we will provide you with a single response. Please be advised that we are closing the three individual tickets of 1322705, 1322722, and 1322723, and that your new ticket number is 1323952.
Please also be advised that the due date of your request is now 28 March 2024, per section 15(1AA) of the Act.
Ngā mihi nui,
Enquiries National Team | Te Tāhuhu o te Mātauranga | Ministry of Education | TW
education.govt.nz
We shape an education system that delivers equitable and excellent outcomes
He mea tārai e mātou te mātauranga kia rangatira ai, kia mana taurite ai ōna huanga
show quoted sections
        From: Ministerial Requests
        Ministry of Education
      
    
    Kia ora A Collins,
Thank you for the confirmation of the interpretation of your requests and the clarification you have provided.
Due to the similar nature of those three requests and the interpretation, we will provide you with a single response. Please be advised that we are closing the three individual tickets of 1322705, 1322722, and 1322723, and that your new ticket number is 1323952.
Please also be advised that the due date of your request is now 28 March 2024, per section 15(1AA) of the Act.
Ngā mihi nui,
Enquiries National Team | Te Tāhuhu o te Mātauranga | Ministry of Education | TW
education.govt.nz
We shape an education system that delivers equitable and excellent outcomes
He mea tārai e mātou te mātauranga kia rangatira ai, kia mana taurite ai ōna huanga
show quoted sections
        From: Ministerial Requests
        Ministry of Education
      
    
    Kia ora A Collins,
Thank you for the confirmation of the interpretation of your requests and the clarification you have provided.
Due to the similar nature of those three requests and the interpretation, we will provide you with a single response. Please be advised that we are closing the three individual tickets of 1322705, 1322722, and 1322723, and that your new ticket number is 1323952.
Please also be advised that the due date of your request is now 28 March 2024, per section 15(1AA) of the Act.
Ngā mihi nui,
Enquiries National Team | Te Tāhuhu o te Mātauranga | Ministry of Education | TW
education.govt.nz
We shape an education system that delivers equitable and excellent outcomes
He mea tārai e mātou te mātauranga kia rangatira ai, kia mana taurite ai ōna huanga
show quoted sections
        From: Enquiries National
        Ministry of Education
      
    
    Kia ora A Collins
 
Thank you for your clarification on 29 February 2024 regarding your
 request for information to the Ministry of Education (the Ministry) under
 the Official Information Act 1982 (the Act).
 
You clarified that “Copies of all external correspondence sent or received
 by the Ministry regarding the reprioritisation, rescoping, pausing, or
 delaying of major building projects at schools, since 20 November 2023”
 included correspondence with schools. This requires additional
 clarification as a large number of schools are in scope of your request
 and it would require substantial collation to review and provide copies of
 all of the correspondence to these schools.
 
Could you please specify it there are specific schools that you would like
 to receive regarding? This would allow the Ministry to ensure we can
 provide the specific information you require in a timely manner. Failure
 to clarify may mean that correspondence to schools may be refused under
 section 18(f) of the Act, as the information requested cannot be made
 available without substantial collation or research.
 
Could you please provide your clarification by the end of the week so the
 Ministry can begin collating that information.
 
Ngâ mihi nui
 
Enquiries National Team | Te Tâhuhu o te Mâtauranga | Ministry of
 Education | SW
[1]education.govt.nz
We shape an education system that delivers equitable and excellent
 outcomes
 He mea târai e mâtou te mâtauranga kia rangatira ai, kia mana taurite ai
 ôna huanga
 [2]Te TD huhu o te MD tauranga
 
show quoted sections
        From: Enquiries National
        Ministry of Education
      
    
    Kia ora A Collins
 
Thank you for your clarification on 29 February 2024 regarding your
 request for information to the Ministry of Education (the Ministry) under
 the Official Information Act 1982 (the Act).
 
You clarified that “Copies of all external correspondence sent or received
 by the Ministry regarding the reprioritisation, rescoping, pausing, or
 delaying of major building projects at schools, since 20 November 2023”
 included correspondence with schools. This requires additional
 clarification as a large number of schools are in scope of your request
 and it would require substantial collation to review and provide copies of
 all of the correspondence to these schools.
 
Could you please specify it there are specific schools that you would like
 to receive regarding? This would allow the Ministry to ensure we can
 provide the specific information you require in a timely manner. Failure
 to clarify may mean that correspondence to schools may be refused under
 section 18(f) of the Act, as the information requested cannot be made
 available without substantial collation or research.
 
Could you please provide your clarification by the end of the week so the
 Ministry can begin collating that information.
 
Ngâ mihi nui
 
Enquiries National Team | Te Tâhuhu o te Mâtauranga | Ministry of
 Education | SW
[1]education.govt.nz
We shape an education system that delivers equitable and excellent
 outcomes
 He mea târai e mâtou te mâtauranga kia rangatira ai, kia mana taurite ai
 ôna huanga
 [2]Te TD huhu o te MD tauranga
 
show quoted sections
        From: Enquiries National
        Ministry of Education
      
    
    Kia ora A Collins
 
Thank you for your clarification on 29 February 2024 regarding your
 request for information to the Ministry of Education (the Ministry) under
 the Official Information Act 1982 (the Act).
 
You clarified that “Copies of all external correspondence sent or received
 by the Ministry regarding the reprioritisation, rescoping, pausing, or
 delaying of major building projects at schools, since 20 November 2023”
 included correspondence with schools. This requires additional
 clarification as a large number of schools are in scope of your request
 and it would require substantial collation to review and provide copies of
 all of the correspondence to these schools.
 
Could you please specify it there are specific schools that you would like
 to receive regarding? This would allow the Ministry to ensure we can
 provide the specific information you require in a timely manner. Failure
 to clarify may mean that correspondence to schools may be refused under
 section 18(f) of the Act, as the information requested cannot be made
 available without substantial collation or research.
 
Could you please provide your clarification by the end of the week so the
 Ministry can begin collating that information.
 
Ngâ mihi nui
 
Enquiries National Team | Te Tâhuhu o te Mâtauranga | Ministry of
 Education | SW
[1]education.govt.nz
We shape an education system that delivers equitable and excellent
 outcomes
 He mea târai e mâtou te mâtauranga kia rangatira ai, kia mana taurite ai
 ôna huanga
 [2]Te TD huhu o te MD tauranga
 
show quoted sections
        From: Enquiries National
        Ministry of Education
      
    
    Kia ora,
 
Please note the extension of your OIA request.
 
Ngā mihi,
 
Enquiries National Team | Te Tāhuhu o te Mātauranga | Ministry of
 Education | SW
[1]education.govt.nz
We shape an education system that delivers equitable and excellent
 outcomes
 He mea tārai e mātou te mātauranga kia rangatira ai, kia mana taurite ai
 ōna huanga
 [2]Te TD huhu o te MD tauranga
 
show quoted sections
        From: Enquiries National
        Ministry of Education
      
    
    Kia ora,
 
Please note the extension of your OIA request.
 
Ngā mihi,
 
Enquiries National Team | Te Tāhuhu o te Mātauranga | Ministry of
 Education | SW
[1]education.govt.nz
We shape an education system that delivers equitable and excellent
 outcomes
 He mea tārai e mātou te mātauranga kia rangatira ai, kia mana taurite ai
 ōna huanga
 [2]Te TD huhu o te MD tauranga
 
show quoted sections
        From: Enquiries National
        Ministry of Education
      
    
    Kia ora,
 
Please note the extension of your OIA request.
 
Ngā mihi,
 
Enquiries National Team | Te Tāhuhu o te Mātauranga | Ministry of
 Education | SW
[1]education.govt.nz
We shape an education system that delivers equitable and excellent
 outcomes
 He mea tārai e mātou te mātauranga kia rangatira ai, kia mana taurite ai
 ōna huanga
 [2]Te TD huhu o te MD tauranga
 
show quoted sections
        From: Enquiries National
        Ministry of Education
      
    
    Kia ora
 
Please find attached the response to your OIA request.
 
Ngā mihi
 
Enquiries National Team | Te Tāhuhu o te Mātauranga | Ministry of
 Education | MC
 [1]education.govt.nz
 We shape an education system that delivers equitable and excellent
 outcomes
 He mea tārai e mātou te mātauranga kia rangatira ai, kia mana taurite ai
 ōna huanga
 [2]Te TD huhu o te MD tauranga
 
show quoted sections
        From: Enquiries National
        Ministry of Education
      
    
    Kia ora
 
Please find attached the response to your OIA request.
 
Ngā mihi
 
Enquiries National Team | Te Tāhuhu o te Mātauranga | Ministry of
 Education | MC
 [1]education.govt.nz
 We shape an education system that delivers equitable and excellent
 outcomes
 He mea tārai e mātou te mātauranga kia rangatira ai, kia mana taurite ai
 ōna huanga
 [2]Te TD huhu o te MD tauranga
 
show quoted sections
        From: Enquiries National
        Ministry of Education
      
    
    Kia ora
 
Please find attached the response to your OIA request.
 
Ngā mihi
 
Enquiries National Team | Te Tāhuhu o te Mātauranga | Ministry of
 Education | MC
 [1]education.govt.nz
 We shape an education system that delivers equitable and excellent
 outcomes
 He mea tārai e mātou te mātauranga kia rangatira ai, kia mana taurite ai
 ōna huanga
 [2]Te TD huhu o te MD tauranga
 
show quoted sections