We don't know whether the most recent response to this request contains information or not – if you are James Owen please sign in and let everyone know.

Rural Drinking Water Treatment Plants.

James Owen made this Official Information request to Crown Infrastructure Partners

This request has an unknown status. We're waiting for James Owen to read recent responses and update the status.

From: James Owen

Dear Crown Infrastructure Partners / NIFFco,

Following recent claims regarding the successful installation of 120 drinking water treatment plants, I request the following information under the OIA to verify the safety and operational status of these assets:

1.Commissioning vs. Installation: For each of the 120 plants, please provide the date of final commissioning (the date the plant began supplying water to consumers) versus the date of "installation" (the date physical works on site were completed).

2. Compliance Pathway: A breakdown of how many of these 120 plants are currently operating under a Taumata Arowai "Acceptable Solution" versus those requiring a custom, verified Drinking Water Safety Plan.

3. Water Safety Status: A list of any of the 120 sites that are currently—or have been in the last 6 months—subject to a Boil Water Notice or an Interim Source Water Risk Management Plan.

4. Operational Handover: Documentation confirming how many of these 120 sites have successfully transitioned to the 5-year "Maintenance and Training" phase with a local operator, versus those still managed by the capital works contractors.

5. Supply Registration: Confirmation that all 120 plants are currently registered on the Hinekōrako (Taumata Arowai) public register of drinking water supplies.

I look forward to your response.

Kind regards,

James Owen

Link to this

From: Info
Crown Infrastructure Partners

Dear Mr Owen.

This is to acknowledge that National Infrastructure Funding and Financing has received your OIA request on 13 March 2026. We will respond to you within the required 20 working days.

Regards

Tifaine Ellis

show quoted sections

Link to this

From: OIAs


Attachment OIA RDWP and MDWP Water Safety Plan Sites.pdf
82K Download View as HTML

Attachment OIA response Water Treatment plants.pdf
154K Download View as HTML


Good afternoon Mr Owen.

 

Please find attached the response to your OIA request from 13 March 2026.

 

 

 

Link to this

We don't know whether the most recent response to this request contains information or not – if you are James Owen please sign in and let everyone know.

Things to do with this request

Anyone:
Crown Infrastructure Partners only: