This is an HTML version of an attachment to the Official Information request 'SRES mechanisms for dealing with customers disagreeing with DRA value'.
Claim Settlement Breakdown
Claim 
Customer 
Address
Date:

Trade
Interpretation of Trade Element
Arrow Costing
Explanation Notes
Demolition
House, outbuildings or detached garages plus any earthquake damaged hard 
 $                                               -    Includes OOS works
1
surfaces included in OOS. Discount and cap services
Excavation
Includes for a site scrape and any excavations required for foundation works.
 $                                               -   
2
Concrete Work
All Foundation works to concrete slab, ring foundation & reinforcing, DPM, 
 $                                               -   
3
chairs, etc. Sum excludes any vertical concrete surfaces, beams, etc.
Structural Steel & Metalwork
Sum includes for any structural steel including steel portals, steel beams, steel   $                                               -   
4
balustrades, any miscellaneous metal works, fixings & fittings and any 
fabrication.
Blockwork & Brickwork
All blockwork including structurally integral retaining walls, structural and non-  $                                               -   
structural blockworks and brick veneer. Sum includes for all tanking, 
5
reinforcing, and concrete. Excludes foundation blockwork (included in concrete 
works)
Exterior Timber Windows & Doors
All exterior joinery with timber construction. Includes for all windows and doors   $                                               -   
6
to the exterior of the dwelling and double glazing. Includes for installation 
costs and puttys et. Excludes for internal doors or windows.
Exterior Aluminium Windows & Doors All Exterior joinery with standard aluminium construction. Includes for all 
 $                                               -   
7
windows and doors to the exterior of the dwelling and double glazing. Excludes 
for internal doors or windows.
Carpentry
Includes for all labour content (excluding sub-trades), timber framing, trusses,   $                                               -   
purlins, structural timber beams, interior plasterboard linings, plaster, internal 
9
trim, preparation for cladding systems (cavity battens, rigid linings) 
weatherboards or similar timber cladding, soffits & linings, plus flashings for 
exterior doors and windows
Timber joinery
All internal joinery including kitchen, timber stairs & balustrades, in-built 
 $                                               -    Provisional Sum for equivalent kitchen joinery
10
joinery, shelving, internal doors & door hardware.
1992
Kitchen and appliances
Includes for all kitchen appliances (in built ovens, hob, rangehood, etc) 
 $                                               -    Prime Cost Sum for equivalent appliance 
11
excluding dishwasher & contents items. If required provide a Prime Cost Sum 
for equivalent appliances
Roofing
Roof cladding, guttering, downpipes & flashings, butynol roofing. Excludes roof   $                                               -   
12
framing
ACT 
Plumbing and gasworks
Including supply to capped services and sub-trade labour content. Includes 
 $                                               -   
13
cost for HWC, WC's, showers, gas bottle station & gas water heater system etc
Drainage
Including stormwater and sewer drainage works and sub-trade labour content   $                                               -   
14
for associated works
Electrical
Security systems, smoke alarms, switchboards, including mains supply 
 $                                               -   
15
connections, and sub-trade labour content
16
Heating
Provisional sum for equivalent comparable heating source
 $                                               -   
Tiling
Permanently fixed to walls and floor. Includes for grout, adhesives, spacers, 
 $                                               -    Prime Cost Sum per M/2 for equivalent tiles
17
etc, and sub-trade labour content for associated works. If required provide a 
PC sum per M/2
Floor Coverings
Permanently fixed vinyl, timber composite overlay or similar floor coverings. 
 $                                               -   
18
Excludes loose laid or smooth edge fixed carpets
19
Glazing
Includes for splashbacks, fixed mirrors, shower wlls and glass balustrades
Exterior Plaster Cladding
Plaster cladding systems including paint finish. Excludes cavity battens and the like
 $                                               -   
20
Specialist systems
Includes for any non-standard materials or systems like solar, intregal 
 $                                               -   
INFORMATION 
21
telecommuniation systems, inbuild sound systems, HRV etc
22
Painting
Internal & external, textured ceilings/walls, waterproof deck paint/staining. 
 $                                               -   
23
Scaffold
To Meet Health & Safety Requirements 
 $                                               -   
 $                                         -   
Net Construction Cost
 $                                         -    Fences, driveways, decks, patio, swimming pool and spa 
23
Net Out of Scope Works Cost
which are permanently fixed. This sum excludes demolition, P 
& G and Margin
OFFICIAL   $                                         -   
Subtotal on above
Additional Compliance Costs
 $                                         -     Enhanced foundations etc. Deduct existing foundation cost 
allowance in DRA e.g. NZS 3604.  
 $                                         -    Multiply by market construction percentage
Preliminary and General
 $                                         -   
UNDER 
Subtotal on above
 $                                         -   
Margin 10%
 $                                         -   
Subtotal on above
Professional Fees
Architectural Fees
 $                                         -   
RELEASED 
Structural Engineering Fees
 $                                         -   
Geotech & Land Survey Fees
 $                                         -   
Consent Fees
 $                                         -    As per CCC Building Consent Fees and Charges 2012-2013
Total Professional Fees
 $                                         -   
 $                               -   
TOTAL