22 April 2026 
DOCO 
By E-mail Only: [FYI request #34211 email] 
To whom it may concern, 
OFFICIAL INFORMATION REQUEST: GOODMAN/LEDGER WASTEWATER STATION 
We refer to your official information request dated 23 March 2026, our response Is set out 
below
I am requesting a report of al  faults of the Goodman/Ledger wastewater station and 
their causes and locations for the years 2025 and 2026. 
Please find attached a record of all faults and defects for years 2025–2026 relating to the 
Goodman Ledger Park Wastewater Pump Station, including a description of each issue and 
its current status. 
Redactions have been applied to the names and contact details of complainants under 
under LGOIMA
section 7(2)(a) (to protect the privacy of natural persons, including that of deceased natural 
persons) 
If you are unsatisfied with the Council’s response, you have the right to seek an investigation 
and review by the Ombudsman. Information about how to make a complaint is available at 
www.ombudsman.parliament.nz or freephone 0800 802 602.   
Yours sincerely 
Legal Services Officer 
Released 

job_number
site_code
job_entry_date
job_complete_date defect_type_name
Description
Current Status
2322867 WWPSLEDGER
11/03/2025
10/04/2025 260-Electrical
Tune pid properly 260Electrical
Work Completed
2323072 WWPSLEDGER
6/04/2025
28/04/2025 120-Capacity
All network 120Capacity
Work Completed
2323499 WWPSLEDGER
9/06/2025
30/06/2025 260-Electrical
Rain event response 260525 260Electrical
Work Completed
2323500 WWPSLEDGER
9/06/2025
30/06/2025 260-Electrical
Rain event response 280525 260Electrical
Work Completed
Pipe Break or Overflow  Raw sewage flowing in street 
manhole covers lifting at Ledger Avenue Please send 
someone to Pump out pumping station in Ledger Avenue 
2323622 WWPSLEDGER
27/06/2025
18/07/2025 120-Capacity
Enquiry 107171 120Capacity
Work Completed
Sump Pump in Flow Chamber has a broken connection 
2324074 WWPSLEDGER
28/08/2025
18/09/2025 200-Leak
needs to be replaced 200Leak
Work Completed
2324279 WWPSLEDGER
29/09/2025
13/10/2025 260-Electrical
Faulty pressure sensor 260Electrical
Work Completed
Power spike caused widespread alarms across network 
2324457 WWPSLEDGER
18/10/2025
10/11/2025 260-Electrical
Goodman Park Bio Filter had Faulted 260Electrical
Work Completed
2324548 WWPSLEDGER
29/10/2025
19/11/2025 260-Electrical
Power Surge 181025 260Electrical
Work Completed
2324836 WWPSLEDGER
1/12/2025
22/12/2025 260-Electrical
Level Float Faults 260Electrical
Work Completed
Odour Complaint  Section 7(2 has  be
 
en in t o s
 
ay there is a bad 
smel  coming from the Goodman Park Station  please 
110-Odour/Smel  
investigate Bigger smel  lasting longer and covering a bigger  Work Completed. Fol owed up by job 
2325193 WWPSLEDGER
8/01/2026
29/01/2026 Complaint
area Enquiry 109129 110OdourSmel  Complaint
#96465 to purchase and replace carbon
under LGOIMA
Rubber seals on wet wel  lids are worn and need replacing 
with odour escaping due to inefficient seals to lids frames 
2325282 WWPSLEDGER
15/01/2026
5/02/2026 300-Structural
300Structural
Work Completed
Odour Complaint  There is a very unpleasant odor coming 
110-Odour/Smel  
from the waste station Can this be investigated please 
2325340 WWPSLEDGER
22/01/2026
13/02/2026 Complaint
Enquiry 109211 110OdourSmel  Complaint
Work Completed
Released 

Please replace the carbon in the McBerns carbon filter at 
Goodman Ledger WWPSWork shall be completed by 13 
February 2026Tasman District Council Contact Person Kate 
Zwartz Funding Al ocation GL Code  If required      
0950241206  Pump Stations Contract ReactiveAll work to  The primary and secondary filtration 
be in accordance with Contract 1065 and the most recent  media have been instal ed (removes over 
version of Tasman District Council Engineering Standards  90% odour). The tertiary filters wil  be 
96465 WWPSLEDGER
27/01/2026
17/02/2026 NULL
Visual Documentation Photos
instal ed by month end. 
110-Odour/Smel
2325428 WWPSLEDGER
1/02/2026
23/02/2026 Complaint
Odour complaint 110OdourSmel  Complaint
Work Completed
Odour Complaint 
 ca
Section 
me  in t
 
his m or ning to alert us to a 
terrible smel  that is coming from the pumping station 
based at 2 Ledger Ave Motueka It has been smel ing this 
110-Odour/Smel
way for weeks and he is asking that someone look into it 
Work completed. Carbon replaced under 
2325583 WWPSLEDGER
18/02/2026
11/03/2026 Complaint
Enquiry 109401 110OdourSmel  Complaint
job#96465
Odour Complaint  Utilities  WastewaterLocation  where is 
this happeningLedger Avenue pump stationDescription  
whats happenedPump station has failed An unacceptable 
sickening toxic stench is emanating from the appliance this 
under LGOIMA
morning at 930amAction required  what would you like us to 
doThe pump station is not fit for purpose The station does 
not have sufficient capacity to deal with the level of flow A 
simple case of overworked infrastructure Needs to be 
augmented with additional pumping capacity or upgraded 
110-Odour/Smel
to modern equipmentMy name 
 co
Section 7(2)(a) - Protection o  
ntact 
2325655 WWPSLEDGER
27/02/2026
20/03/2026 Complaint
me viaEmail Enquiry 109475 110OdourSmel  Complaint
Work Completed
Trindy Walker  021728035 Email Address Address 
110-Odour/Smel
Ledger AvenueMessageEnquiry bad smell coming from 
2325658 WWPSLEDGER
28/02/2026
23/03/2026 Complaint
pump station on ledger ave 110OdourSmell Complaint
Work Completed
Released 

Section 7(2)(a) - Protection of Privacy  Email Address 
 
Section 7(2)(a) - Protection o A ddress Section 7(2)(a) - Protecti     
MessageEnquiry Waste water is smel ing quite 
badly she would like someone to come out and sort the 
smel  out and she would like a manager to call her back 
about this on MondayActions taken  Passed to Waste Water 
110-Odour/Smel  
oncal   text to Jayben SR CASP003448 110OdourSmel  
2325661 WWPSLEDGER
1/03/2026
6/03/2026 Complaint
Complaint
Work Completed
 
Section 7(2)(a) - Protection of Pri Email Address 
Section 7(2)(a) - Protection of Pr Address Ledger Goodman Park the 
Pump Station  Ledger Ave MotuekaMessageEnquiry Waste 
water pipe is leaking sewerageActions taken Waste Water 
2325662 WWPSLEDGER
1/03/2026
6/03/2026 140-Blockage
passed  txt SR 140Blockage
Work Completed
110-Odour/Smel  
Job tracking activities and costs incurred while attempting 
2325688 WWPSLEDGER
2/03/2026
Complaint
to resolve network odour issues 110OdourSmel  Complaint Job remains open
2325712 WWPSLEDGER
5/03/2026
10/03/2026 260-Electrical
Incorrect Alarm Priority 260Electrical
Work Completed
A bit like we are doing at Mapua Wharf could you please run 
the pumps at various frequencies to establish what the 
downstream system curve isPlease let Kate Zwartz know 
when you are doing this workNo As Builting requiredTasman 
under LGOIMA
District Council Contact Person Kate Zwartz  Funding 
Allocation GL Code  If required 0950241206 PS Contract 
ReactiveAll work to be in accordance with Contract 1065 
and the most recent version of Tasman District Council 
96606 WWPSLEDGER
6/03/2026
NULL
Engineering Standards 
Job remains open
2325815 WWPSLEDGER
19/03/2026
24/03/2026 260-Electrical
Unplanned Power outage 260Electrical
Job Completed
Released 