44 Bowen Street
Private Bag 6995
Wellington 6141
New Zealand
T 64 4 894 5400
F 64 4 894 6100
www.nzta.govt.nz
27 November 2025
L Johnson
[FYI request #32693 email]
REF: OIA-20116
Dear L Johnson
Request made under the Official Information Act 1982
Thank you for your email
of 30 October 2025 requesting information about how flooding risk or
stormwater issues were considered for The Strand Optimisation project under the Official Information
Act 1982 (the Act).
The information I seek should include, but not be limited to:
- Any section of the design report relating to stormwater management/flood risk
No such documentation exists, as stormwater management or flood risk was not an official part of the
project scope.
Therefore, this part of your request has been refused under section 18(e) of the Act as the document
alleged to contain the information requested does not exist.
- Any entries in the design decision register relating to stormwater management/flood risk
Please find relevant information in
Attachment 1.
Certain information has been withheld under section 9(2)(a) of the Act to protect the privacy of natural
persons.
- Any meeting minutes for meetings where stormwater management or flood risk was
discussed
Please find the meeting minutes released to you in
Attachment 2.
Certain information has been withheld under section 9(2)(a) of the Act to protect the privacy of natural
persons.
- The outputs of any stormwater model ing exercises or flood risk assessments, if they were
done
Please find the flood hazard risk assessment report released to you in
Attachment 3.
- Any discussion of the cost implications of addressing flood risk through the project
No such documentation exists, as stormwater management or flood risk was not an official part of the
project scope.
Therefore, this part of your request has been refused under section 18(e) of the Act as the document
alleged to contain the information requested does not exist.
- Any communications with Watercare or Auckland Council Healthy Waters department about
stormwater management/flood risk within the project's extent
Please find relevant communications released to you in
Attachment 4.
Certain information has been withheld under section 9(2)(a) of the Act to protect the privacy of natural
persons.
Further to the above,
Attachments 5, 6 7 and
8 are the remaining stormwater related documents held
on file for The Strand Optimisation project, which fall within the scope of your request. Al attachments
are listed in the document schedule appended to this letter and are enclosed.
Please note, certain information has been withheld from Attachments 6, 7 and 8 under section 9(2)(a)
of the Act to protect the privacy of natural persons.
With respect to the information that has been withheld from this request, I do not consider there are
any other factors which would render it desirable, in the public interest, to make the information
available.
Under section 28 of the Act, you have the right to ask the Ombudsman to review my decision to
withhold some information from this request. The contact details for the Ombudsman can be located at
www.ombudsman.parliament.nz.
In line with NZ Transport Agency Waka Kotahi (NZTA) policy, this response wil soon be published on
our website, with personal information removed.
If you would like to discuss this reply with NZTA, please contact Ministerial Services, by email to
[NZTA request email].
Yours sincerely
Prisca Gain
Team Lead Government and Ministerial Services
2
OIA-20116 Document Schedule
Ref
Document
Withholding grounds used (if any)
1.
OIA-20116 - Attachment 1 - Extracts from
Information withheld under section 9(2)(a)
design register discussing stormwater
of the Act.
2.
OIA-20116 - Attachment 2- Email containing
Information withheld under section 9(2)(a)
meeting minutes from meeting with Auckland of the Act.
Local Board (contains references to flooding
and stormwater issues)
3.
OIA-20116 - Attachment 3 - Appendix E -
Released in full.
Flood Hazard Risk Assessment Report
4.
OIA-20116 - Attachment 4 - Email with
Information withheld under section 9(2)(a)
comments from Auckland Council and
of the Act.
response from the project about the design
5.
OIA-20116 - Attachment 5 - Extract from
Released in full.
consenting report - Stage 2 Consent - AEE
Stormwater comment
6.
OIA-20116 - Attachment 6 - Email from
Information withheld under section 9(2)(a)
resident about flooding risk
of the Act.
7.
OIA-20116 - Attachment 7 - Email connecting Information withheld under section 9(2)(a)
Auckland Local Board with stormwater
of the Act.
maintenance lead
8.
OIA-20116 - Attachment 8 - Email containing Information withheld under section 9(2)(a)
project overview shared with key
of the Act.
stakeholders during consultation
3