Project Name
Phase
Local Board
Activity Description
Historic spend 2025
2026
2027
2028
2029
2030
2031
2032
Total
If a renewal project, 
Did this go to 
Method
Any other comments
what was the trigger?
consultation
Waenganui/Al enby Park - renew skate bowl and playground
Deliver
Ōtara-Papatoetoe
Renew the playground, vol eybal  court and skate bowl.
39,047.07 
196,200.67 
112,222.26 
347,530.00 
0.00 
0.00 
0.00 
0.00 
0.00 
695,000.00 
N/A
Yes
Online Have Your Say survey. Additional meeting held with East Skate Club who 

were the main stakeholders.
FY23/24 - investigation and concept design for skate bowl and playground
FY24/25 - physical works skate park
FY25/26 to FY 26/27 - physical works playground

Risk Adjusted Programme (RAP) project
Hayman Park - renew depot facility and skatepark
1A.Pipeline
Ōtara-Papatoetoe
Internal and external refurbishment of the depot and garage at Hayman Park 
0.00 
0.00 
0.00 
0.00 
50,000.00 
250,000.00 
0.00 
0.00 
0.00 
300,000.00 
N/A
Not at that phase of 
and renew skatepark nearby.
the project yet

FY27/28 - investigation and design
FY28/29 - physical works
Clarks Beach Recreation Reserve and Golf Club - upgrade skate park, 
Deliver
Franklin
Fol owing the approval of the park's concept plan, utilise the document to 
1,092,048.37 
2,049,536.26 
1,695.00 
0.00 
0.00 
0.00 
0.00 
0.00 
0.00 
3,143,279.63 
Condition assesssment and  Yes
Online Have Your Say survey, on site drop in session during design.
playground and land fixtures
upgrade park amenities such as the skate park, the playground and park 
wider reserve 
fixtures and furniture in a staged approached.
development opportunity
FY21/22 to FY22/23 - consultation, investigation and design
FY23/24 to FY24/25 - physical works


Te Puru Park - renew skate park
1A.Pipeline
Franklin
Renew skate park.
0.00 
0.00 
0.00 
0.00 
0.00 
18,093.42 
132,744.00  168,083.00  400,000.00 
718,920.42 
Condition assessment
Not at that phase of 
FY28/29 - FY29/30 investigation
the project yet
FY30/31 - FY31/32 design and physical


Constel ation Park, Beachlands - instal  pump track
Close
Franklin
Constel ation Park, Beachlands - instal  pump track
0.00 
76,050.67 
14,271.50 
0.00 
0.00 
0.00 
0.00 
0.00 
0.00 
90,322.17 
Partnership opportunity 
Yes
Online Have Your Say survey, meetings on-site with Trail-Pro and neighbours.
FY24/25 to FY25/26 - investigate, design and physical works
brought to  council by 
benefactor
WW - Goodal  Reserve - renew skate park and minor assets
Plan
Rodney
Renew the skate ramp with concrete to ensure the asset meets the improved  121,727.73 
5,581.17 
20,000.00 
103,640.00 
585,000.00 
0.00 
0.00 
0.00 
0.00 
835,948.90 
Condition assessment
Potential for further 
service standards.  Replace fencing, seating and access paths to the skate area.
consul tation (if 
FY19/20 to FY20/21 - investigation and redesign
changes to design)
FY26/27 to FY27/28 - deliver physical works

Risk Adjusted Programme (RAP) project
KMH - Huapai Recreation Reserve - develop a site plan including the 
Plan
Rodney
Stage One:  Col aborate with park user groups, Auckland Transport and 
91,263.40 
200,718.71 
1,574,258.89  1,939,000.00 
1,619,013.00 
1,050,000.00  0.00 
0.00 
0.00 
6,474,254.00 
N/A
Yes
Online Have Your Say survey+, co-design workshops in local schools and at local 
redevelopment of play network
associated subject matter experts to develop a ful  site plan including the 
events including skate events.
redevelopment of play network. 
Stage Two:  Develop concept plan options for the play redevelopment 
including wheel play facilities for community consultation and submission to 
the local board for their review and approval. 
Stage Three:  Implement the approved play network redevelopment plan 
including al  associated drainage, landscaping and other miscel aneous 
remediation works as required. 
FY22/23 - investigation and preparation of ful  site plan.
FY23/24 to FY28/29 – deliver the approved redevelopment plan.

Risk Adjusted Programme (RAP) project

Funding Contributions:
$3,471,754 - Local Capex
$3,000,000 - Growth

WW - Leigh Vil age Reserve - develop local park
Initiate
Rodney
Develop local park by renewing the play assets and skate facility from the Leigh  27,774.13 
12,013.17 
13,610.00 
36,376.83 
300,000.00 
600,000.00 
0.00 
0.00 
0.00 
989,774.13 
Condition assessment
Not at that phase of 
School site to Leigh Vil age Reserve.  Project scope  includes instal ation of 
the project yet
furniture, pathways and landscaping.
FY25/26 - design, consultation and consenting
FY27/28 to FY28/29 - deliver physical works

Risk Adjusted Programme (RAP) project
KMH - Muriwai Vil age Green - renew open space assets & improve 
Plan
Rodney
In col aboration with the community, upgrade the skate facility, renew the 
104,805.85 
51,414.83 
765,058.68 
226,341.64 
0.00 
0.00 
0.00 
0.00 
0.00 
1,147,621.00 
Condition assessment
Yes
Online Have Your Say survey
wheel play assets
courts, carpark and associated landscaping.  Investigate the open space assets 
and develop a scope of works to renew the identified assets requiring 
remediation to ensure the site is a more functional community space for al  
ages. 
FY22/23 to FY23/24 - investigation, consultation and design.
FY24/25 - design and consenting.
FY25/26 to FY27/28 - deliver physical works.

Risk Adjusted Programme (RAP) project


DF - Waterloo Reserve Mil dale - develop playspace and toilet provision
Deliver
Rodney
Develop the approved concept design in the new suburb park in Mil dale.  This  2,843.50 
272,259.70 
227,740.30 
900,000.00 
1,800,000.00 
0.00 
0.00 
0.00 
0.00 
3,202,843.50 
N/A
Design yet to be 
project wil  deliver the toilet and playspace infrastructure components of the 
finilised
design. 
FY24/25 - stage 1 physical works
FY25/26 - design and consenting - stage 2
FY26/27 to FY27/28 - deliver physical works - stage 2

Risk Adjusted Programme (RAP) project
KMH - Rautawhiri Park - renew playspace, open space assets & instal  
Strategic 
Rodney
Renew the playground including the skate facility and instal  a permanent 
1,827.50 
0.00 
50,000.50 
50,000.00 
300,000.00 
580,000.00 
0.00 
0.00 
0.00 
981,828.00 
Condition assessment
Not at that phase of 
permanent pump track
Assessment
pump track.  This project wil  take into consideration the play components at 
the project yet
Cabeleigh Drive Pond Reserve to ensure no duplicate items are instal ed and 
the provision of play for al  ages is available in the area.
FY26/27 - investigation, design and consultation
FY27/28 to FY28/29 - deliver physical works

Risk Adjusted Programme (RAP) project
Parrs Park - upgrade skate park
Initiate
Waitākere Ranges
Upgrade skate park to provide a wheeled play facility which caters for a wide 
0.00 
0.00 
80,000.00 
450,000.00 
940,000.00 
0.00 
0.00 
0.00 
0.00 
1,470,000.00 
Condition assessment
Not at that phase of 
age and ability range, in this brown fields growth area.
the project yet

FY25/26 to FY26/27 - investigation, consultation and design
FY26/27 to FY27/28 - consenting and physical works
Risk Adjusted Programme (RAP) project.

Funding Contributions:
$600,000 - Growth
Huia Domain - renew skate half pipe
1A.Pipeline
Waitākere Ranges
Renew or refurbish the skate half pipe at Huia Domain.
0.00 
0.00 
0.00 
10,000.00 
150,000.00 
0.00 
0.00 
0.00 
0.00 
160,000.00 
Condition assessment
Not at that phase of 

the project yet
FY26/27 to FY27/28 - investigation and physical works

Te Poi / Starling Park - refurbish skate park
1A.Pipeline
Henderson-Massey Refurbish skate park surface and skate items.
0.00 
0.00 
0.00 
55,000.00 
0.00 
0.00 
0.00 
0.00 
0.00 
55,000.00 
Condition assessment
Not at that phase of 

the project yet
FY26/27 - investigation and physical works
Te Pai Park - increase skate/wheeled play elements
Deliver
Henderson-Massey In consultation with the skate park users, increase the play elements for 
0.00 
0.00 
20,000.00 
160,000.00 
0.00 
0.00 
0.00 
0.00 
0.00 
180,000.00 
Condition assessment
Yes
Consultation by Van Weerd Skate Park Solution
wheeled play and skating.

FY25/26 to 26/27 - investigation and physical works
Risk Adjusted Programme (RAP) project.
Swanson Station Park - refurbish skate park
Deliver
Waitākere Ranges
Refurbish the skate park surface.
0.00 
0.00 
50,000.00 
0.00 
0.00 
0.00 
0.00 
0.00 
0.00 
50,000.00 
Condition assessment
Renewal project, no 

consultation required
FY25/26 - investigation and physical works
Sunnynook Park - develop and renew skate facilities
Plan
Devonport-
Renew the Sunnynook Park skate park at the preferred location at Sunnynook  76,575.47 
62,975.62 
565,073.43 
0.00 
0.00 
0.00 
0.00 
0.00 
0.00 
704,624.52 
Condition assessment
Yes
Ongoing consultation with community from 2021-2023, AK HYS
N/A
Takapuna
Square.
FY22/23 - investigate and design.
FY23/24 - consultation and consenting.
FY24/25 to FY25/26 - physical works.


Ngataringa Park - investigate relocation of the skatepark to Woodal  Park Plan
Devonport-
Investigate the future use and relocation of the skate park at Ngataringa Park 
44,246.73 
61,621.60 
689,071.93 
150,306.47 
0.00 
0.00 
0.00 
0.00 
0.00 
945,246.73 
N/A
Yes
Online Have Your Say survey
N/A
Takapuna
to Woodal  Park.
FY22/23 to FY24/25 - investigation and design.
FY25/26  to FY26/27 deliver physical works.

Risk Adjusted Programme (RAP) project


Woodal  Park - investigate toilet, basketbal  court and relocating the local  On Hold
Devonport-
Investigate increasing the basketbal  provision from a half court to a ful  court.  43,255.14 
100.00 
0.00 
0.00 
0.00 
0.00 
0.00 
0.00 
0.00 
43,355.14 
N/A
skate facility
Takapuna
with picklebal  markings too.
Investigate external accessibility to the squash facility toilets for public use by 
potential y instal ing a cardax system.
Investigate relocating the Ngataringa Park skate facility to Woodal  Park due to 
suitability of grounds.
FY22/23 to FY23/24 - investigation and design.

Should the local board agree to proceed to physical works, this stage wil  be 
programmed into the future work programme for approval.

Risk Adjusted Programme (RAP) project
Wheeled Play - implementation Albert-Eden
Deliver
Albert-Eden
To deliver the outcomes from the Wheeled Play Network Study as completed  0.00 
0.00 
145,000.00 
0.00 
0.00 
0.00 
0.00 
0.00 
0.00 
145,000.00 
N/A
No
by our Parks and Places Specialist. To purchase and instal  modular pump track 
and associated equipment. 

FY25/26 - purchase and instal  the equipment
Maungakiekie - Tāmaki - implement youth activation
Close
Maungakiekie-
This is a local board initiative to increase the youth play provision in the board  819,367.78 
36,957.91 
0.00 
0.00 
0.00 
0.00 
0.00 
0.00 
0.00 
856,325.69 
N/A
Yes
Consultation by Bespoke Landscape Solutions
This project includes various 
Tāmaki
area by developing a skate park and/or pump track for the community as wel  
scope of works. The work specific 
as fitness stations and a basketbal  courts.
to the pump track amounts to 
Due to funding constraints and the skate park at Onehunga Bay Reserve being 
$128k. No skatepark works were 
deferred to future years, this provision wil  al ow the board to fund a 
carried out under this project 
relocatable pump track at their discretion. The order of site placement is yet to 
line.
be agreed.
FY18/19 to FY19/20 - investigation, design and planning
FY20/21 to FY21/22 - physical works
FY22/23 to FY23/24 - complete physical works
Lloyd Elsmore Park - renew skate park
Plan
Howick
Renewal of skatepark to ensure the facility is fit for purpose
89,694.99 
30,723.26 
801,903.00 
200,000.00 
0.00 
0.00 
0.00 
0.00 
0.00 
1,122,321.25 
Condition assessment
Yes
Online Have Your Say survey

FY22/23 - investigate, scope and design works
FY23/24 to FY26/27 - deliver physical works
Risk Adjusted Programme (RAP) project
Onehunga Bay Reserve - develop skate park
Plan
Maungakiekie-
This is a local board initiative to increase the youth play provision in the board  4,983.32 
11,662.58 
758,194.00 
399,000.00 
0.00 
0.00 
0.00 
0.00 
0.00 
1,173,839.90 
Network analysis
Yes
Consultation by Bespoke Landscape Solutions
Tāmaki
area by developing skating facilities. Due to funding constraints, priority has 
been given to development of skate park facilities (i.e. the flow-bowl) over 
upgrading the vertical ramp. This wil  more widely increase youth play 
provisioning.   

FY23/24 - investigation
FY24/25 to FY26/27 - design, consenting and physical works
Logan Carr Reserve - minor wheel play activation
Strategic 
Howick
Instal  appropriately designed minor wheel play components on existing 
0.00 
0.00 
40,000.00 
80,000.00 
80,000.00 
0.00 
0.00 
0.00 
0.00 
200,000.00 
N/A
Yes
Survey at Auckland Secondary School Skate Championships
Assessment
concrete pad. Wheel play options should consider an uplift in play service 
levels catering for an older age group.

FY25/26 - investigation and design
FY25/26 to FY27/28 - detailed design and physical works
Risk Adjusted Programme (RAP) project
Colin Maiden Park - develop bike tracks
Strategic 
Ōrākei
Development of bike tracks as replacement tracks for Colin Maiden Park.
0.00 
0.00 
629,760.00 
0.00 
0.00 
0.00 
0.00 
0.00 
0.00 
629,760.00 
Network analysis
Yes
Part of - Te Tauoma and Glendowie Pump Track engagements which are ongoing.
Assessment

FY25/26 - investigation and design, physical works
Victoria Park - instal  lighting to the skatepark
Strategic 
Waitematā
Instal ation of LED lighting to the Victoria Park skatepark.
0.00 
0.00 
140,000.00 
0.00 
0.00 
0.00 
0.00 
0.00 
0.00 
140,000.00 
N/A
In planning
Targeted consulted to be delivered
Assessment

FY25/26 - design, obtain any required consents, physical works
Streamview Way Park - develop youth park
Plan
Hibiscus and Bays
Develop a youth park with playground, skate or wheel play options, furniture  0.00 
118,294.18 
461,705.82 
1,855,000.00 
0.00 
0.00 
0.00 
0.00 
0.00 
2,435,000.00 
N/A
Yes
Two online Have Your Say surveys, co-design workshops with youth
and pathways to ensure al  accessible.
FY24/25 - investigation and concept planning
FY25/26 - consenting and detailed design
FY26/27 - deliver physical works

Risk Adjusted Programme (RAP) project
Hibiscus and Bays - develop permanent pump tracks
Plan
Hibiscus and Bays
Locate preferred site in both Hibiscus Coast subdivision (Red Beach Park) and  0.00 
16,796.43 
160,051.57 
126,000.00 
687,222.00 
0.00 
0.00 
0.00 
0.00 
990,070.00 
N/A
Yes
Online Have Your Say survey
East Coast subdivision (Streamview Way Park), then design and implement a 
permanent pump track.
FY24/25 to FY25/26 - investigate and design
FY26/27 - physical works
FY27/28 - investigation, design and physical works (second subdivision)


Risk Adjusted Programme (RAP) project
Stanmore Bay - renew skatepark
Strategic 
Hibiscus and Bays
Renew the skatepark.
0.00 
0.00 
20,000.00 
180,000.00 
0.00 
0.00 
0.00 
0.00 
0.00 
200,000.00 
N/A
Renewal project, no  Surface renewal only. 
Assessment
FY25/26 to FY26/27 - investigation, design and physical works
consultation required
Risk Adjusted Programme (RAP) project
Luckens Reserve - renew wheel play and basketbal  court
Strategic 
Upper Harbour
Renewal/Improvements to the existing skate park and basketbal  facilities to 
0.00 
0.00 
20,000.00 
130,000.00 
150,000.00 
0.00 
0.00 
0.00 
0.00 
300,000.00 
N/A
Not at that phase of  Have Your Say/ Community engagement with local school and other relevant 
Assessment
support the demand of population growth.
the project yet
groups wil  be completed during planning phase. 
FY25/26 - investigation and design
FY26/27 to FY27/28 - physical works

Risk Adjusted Programme (RAP) project

Bob Hil  Reserve - refurbish skate park
1A.Pipeline
Whau
Refurbish skate park.
0.00 
0.00 
0.00 
20,000.00 
150,000.00 
0.00 
0.00 
0.00 
0.00 
170,000.00 
Condition assessment
Not at that phase of 

the project yet
FY26/27 - investigation and design
FY27/28 - physical works.
Sister Rene Shadbolt Park - upgrade skate park/basketbal  half court
Initiate
Whau
Upgrade skate park/basketbal  half court for Tiakina/Sister Rene Shadbolt Park.  0.00 
0.00 
60,000.00 
340,000.00 
0.00 
0.00 
0.00 
0.00 
0.00 
400,000.00 
Condition assessment
Not at that phase of 
Provide more seating and shelter.
the project yet

FY25/26 - consultation, investigation and design
FY26/27 - physical works
Risk Adjusted Programme (RAP) project.
Riversdale Reserve - renew and improve - playground and skate park
Deliver
Whau
Renew and improve playground and skate park surface at Riversdale Reserve.  0.00 
0.00 
40,000.00 
290,000.00 
0.00 
0.00 
0.00 
0.00 
0.00 
330,000.00 
Condition assessment
No
Renewal/H&S works of the skate 
The Play Network Gap Analysis Report recommends consider inclusion of 
portion of the project, retaining 
chal enging spinning experience for senior - youth age groups, alongside 
wal s, surfacing and concrete 
additional jumping and rocking experiences and improvement of 
treatment, no service increase.  
creative/imaginative.
No consultation required for 

Skate portion
FY25/26 - investigation and design
FY26/27 - physical works
Close
Waitematā
Renewals of Open space play equipment that are condition 4  and 5, refer the  107,230.00
0.00 
0.00 
0.00 
0.00 
0.00 
0.00 
0.00 
0.00 
107,230.00
Condition assessment
No
Renewal and reinforcing of the 
asset assessment reports for the identified scope. Victoria Park Skate Park 
skate ramp, resurfacing and 
Open space play spaces - renew - 2023/2024 to 2024/2025 - 
Renewal
repair to the concrete surface of 
Waitematā
the street sections of the park.
Close
Orakei
Renewals of Open space play equipment that are condition 4  and 5, refer the  8,500.00
0.00 
0.00 
0.00 
0.00 
0.00 
0.00 
0.00 
0.00 
8,500.00
Condition assessment
No
Surface grind and repair to both 
asset assessment reports for the identified scope. Crossfield Reserve 
bowls, temporary manual pad 
Skatebowl Renewal
formalised at request of local 
Open space play space equipment - renew - 2023/2024 to 
board fol owing request from 
2025/2026 - Ōrākei
public.

Document Outline