Project Name
Phase
Local Board
Activity Description
Historic spend 2025
2026
2027
2028
2029
2030
2031
2032
Total
If a renewal project,
Did this go to
Method
Any other comments
what was the trigger?
consultation
Waenganui/Al enby Park - renew skate bowl and playground
Deliver
Ōtara-Papatoetoe
Renew the playground, vol eybal court and skate bowl.
39,047.07
196,200.67
112,222.26
347,530.00
0.00
0.00
0.00
0.00
0.00
695,000.00
N/A
Yes
Online Have Your Say survey. Additional meeting held with East Skate Club who
were the main stakeholders.
FY23/24 - investigation and concept design for skate bowl and playground
FY24/25 - physical works skate park
FY25/26 to FY 26/27 - physical works playground
Risk Adjusted Programme (RAP) project
Hayman Park - renew depot facility and skatepark
1A.Pipeline
Ōtara-Papatoetoe
Internal and external refurbishment of the depot and garage at Hayman Park
0.00
0.00
0.00
0.00
50,000.00
250,000.00
0.00
0.00
0.00
300,000.00
N/A
Not at that phase of
and renew skatepark nearby.
the project yet
FY27/28 - investigation and design
FY28/29 - physical works
Clarks Beach Recreation Reserve and Golf Club - upgrade skate park,
Deliver
Franklin
Fol owing the approval of the park's concept plan, utilise the document to
1,092,048.37
2,049,536.26
1,695.00
0.00
0.00
0.00
0.00
0.00
0.00
3,143,279.63
Condition assesssment and Yes
Online Have Your Say survey, on site drop in session during design.
playground and land fixtures
upgrade park amenities such as the skate park, the playground and park
wider reserve
fixtures and furniture in a staged approached.
development opportunity
FY21/22 to FY22/23 - consultation, investigation and design
FY23/24 to FY24/25 - physical works
Te Puru Park - renew skate park
1A.Pipeline
Franklin
Renew skate park.
0.00
0.00
0.00
0.00
0.00
18,093.42
132,744.00 168,083.00 400,000.00
718,920.42
Condition assessment
Not at that phase of
FY28/29 - FY29/30 investigation
the project yet
FY30/31 - FY31/32 design and physical
Constel ation Park, Beachlands - instal pump track
Close
Franklin
Constel ation Park, Beachlands - instal pump track
0.00
76,050.67
14,271.50
0.00
0.00
0.00
0.00
0.00
0.00
90,322.17
Partnership opportunity
Yes
Online Have Your Say survey, meetings on-site with Trail-Pro and neighbours.
FY24/25 to FY25/26 - investigate, design and physical works
brought to council by
benefactor
WW - Goodal Reserve - renew skate park and minor assets
Plan
Rodney
Renew the skate ramp with concrete to ensure the asset meets the improved 121,727.73
5,581.17
20,000.00
103,640.00
585,000.00
0.00
0.00
0.00
0.00
835,948.90
Condition assessment
Potential for further
service standards. Replace fencing, seating and access paths to the skate area.
consul tation (if
FY19/20 to FY20/21 - investigation and redesign
changes to design)
FY26/27 to FY27/28 - deliver physical works
Risk Adjusted Programme (RAP) project
KMH - Huapai Recreation Reserve - develop a site plan including the
Plan
Rodney
Stage One: Col aborate with park user groups, Auckland Transport and
91,263.40
200,718.71
1,574,258.89 1,939,000.00
1,619,013.00
1,050,000.00 0.00
0.00
0.00
6,474,254.00
N/A
Yes
Online Have Your Say survey+, co-design workshops in local schools and at local
redevelopment of play network
associated subject matter experts to develop a ful site plan including the
events including skate events.
redevelopment of play network.
Stage Two: Develop concept plan options for the play redevelopment
including wheel play facilities for community consultation and submission to
the local board for their review and approval.
Stage Three: Implement the approved play network redevelopment plan
including al associated drainage, landscaping and other miscel aneous
remediation works as required.
FY22/23 - investigation and preparation of ful site plan.
FY23/24 to FY28/29 – deliver the approved redevelopment plan.
Risk Adjusted Programme (RAP) project
Funding Contributions:
$3,471,754 - Local Capex
$3,000,000 - Growth
WW - Leigh Vil age Reserve - develop local park
Initiate
Rodney
Develop local park by renewing the play assets and skate facility from the Leigh 27,774.13
12,013.17
13,610.00
36,376.83
300,000.00
600,000.00
0.00
0.00
0.00
989,774.13
Condition assessment
Not at that phase of
School site to Leigh Vil age Reserve. Project scope includes instal ation of
the project yet
furniture, pathways and landscaping.
FY25/26 - design, consultation and consenting
FY27/28 to FY28/29 - deliver physical works
Risk Adjusted Programme (RAP) project
KMH - Muriwai Vil age Green - renew open space assets & improve
Plan
Rodney
In col aboration with the community, upgrade the skate facility, renew the
104,805.85
51,414.83
765,058.68
226,341.64
0.00
0.00
0.00
0.00
0.00
1,147,621.00
Condition assessment
Yes
Online Have Your Say survey
wheel play assets
courts, carpark and associated landscaping. Investigate the open space assets
and develop a scope of works to renew the identified assets requiring
remediation to ensure the site is a more functional community space for al
ages.
FY22/23 to FY23/24 - investigation, consultation and design.
FY24/25 - design and consenting.
FY25/26 to FY27/28 - deliver physical works.
Risk Adjusted Programme (RAP) project
DF - Waterloo Reserve Mil dale - develop playspace and toilet provision
Deliver
Rodney
Develop the approved concept design in the new suburb park in Mil dale. This 2,843.50
272,259.70
227,740.30
900,000.00
1,800,000.00
0.00
0.00
0.00
0.00
3,202,843.50
N/A
Design yet to be
project wil deliver the toilet and playspace infrastructure components of the
finilised
design.
FY24/25 - stage 1 physical works
FY25/26 - design and consenting - stage 2
FY26/27 to FY27/28 - deliver physical works - stage 2
Risk Adjusted Programme (RAP) project
KMH - Rautawhiri Park - renew playspace, open space assets & instal
Strategic
Rodney
Renew the playground including the skate facility and instal a permanent
1,827.50
0.00
50,000.50
50,000.00
300,000.00
580,000.00
0.00
0.00
0.00
981,828.00
Condition assessment
Not at that phase of
permanent pump track
Assessment
pump track. This project wil take into consideration the play components at
the project yet
Cabeleigh Drive Pond Reserve to ensure no duplicate items are instal ed and
the provision of play for al ages is available in the area.
FY26/27 - investigation, design and consultation
FY27/28 to FY28/29 - deliver physical works
Risk Adjusted Programme (RAP) project
Parrs Park - upgrade skate park
Initiate
Waitākere Ranges
Upgrade skate park to provide a wheeled play facility which caters for a wide
0.00
0.00
80,000.00
450,000.00
940,000.00
0.00
0.00
0.00
0.00
1,470,000.00
Condition assessment
Not at that phase of
age and ability range, in this brown fields growth area.
the project yet
FY25/26 to FY26/27 - investigation, consultation and design
FY26/27 to FY27/28 - consenting and physical works
Risk Adjusted Programme (RAP) project.
Funding Contributions:
$600,000 - Growth
Huia Domain - renew skate half pipe
1A.Pipeline
Waitākere Ranges
Renew or refurbish the skate half pipe at Huia Domain.
0.00
0.00
0.00
10,000.00
150,000.00
0.00
0.00
0.00
0.00
160,000.00
Condition assessment
Not at that phase of
the project yet
FY26/27 to FY27/28 - investigation and physical works
Te Poi / Starling Park - refurbish skate park
1A.Pipeline
Henderson-Massey Refurbish skate park surface and skate items.
0.00
0.00
0.00
55,000.00
0.00
0.00
0.00
0.00
0.00
55,000.00
Condition assessment
Not at that phase of
the project yet
FY26/27 - investigation and physical works
Te Pai Park - increase skate/wheeled play elements
Deliver
Henderson-Massey In consultation with the skate park users, increase the play elements for
0.00
0.00
20,000.00
160,000.00
0.00
0.00
0.00
0.00
0.00
180,000.00
Condition assessment
Yes
Consultation by Van Weerd Skate Park Solution
wheeled play and skating.
FY25/26 to 26/27 - investigation and physical works
Risk Adjusted Programme (RAP) project.
Swanson Station Park - refurbish skate park
Deliver
Waitākere Ranges
Refurbish the skate park surface.
0.00
0.00
50,000.00
0.00
0.00
0.00
0.00
0.00
0.00
50,000.00
Condition assessment
Renewal project, no
consultation required
FY25/26 - investigation and physical works
Sunnynook Park - develop and renew skate facilities
Plan
Devonport-
Renew the Sunnynook Park skate park at the preferred location at Sunnynook 76,575.47
62,975.62
565,073.43
0.00
0.00
0.00
0.00
0.00
0.00
704,624.52
Condition assessment
Yes
Ongoing consultation with community from 2021-2023, AK HYS
N/A
Takapuna
Square.
FY22/23 - investigate and design.
FY23/24 - consultation and consenting.
FY24/25 to FY25/26 - physical works.
Ngataringa Park - investigate relocation of the skatepark to Woodal Park Plan
Devonport-
Investigate the future use and relocation of the skate park at Ngataringa Park
44,246.73
61,621.60
689,071.93
150,306.47
0.00
0.00
0.00
0.00
0.00
945,246.73
N/A
Yes
Online Have Your Say survey
N/A
Takapuna
to Woodal Park.
FY22/23 to FY24/25 - investigation and design.
FY25/26 to FY26/27 deliver physical works.
Risk Adjusted Programme (RAP) project
Woodal Park - investigate toilet, basketbal court and relocating the local On Hold
Devonport-
Investigate increasing the basketbal provision from a half court to a ful court. 43,255.14
100.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
43,355.14
N/A
skate facility
Takapuna
with picklebal markings too.
Investigate external accessibility to the squash facility toilets for public use by
potential y instal ing a cardax system.
Investigate relocating the Ngataringa Park skate facility to Woodal Park due to
suitability of grounds.
FY22/23 to FY23/24 - investigation and design.
Should the local board agree to proceed to physical works, this stage wil be
programmed into the future work programme for approval.
Risk Adjusted Programme (RAP) project
Wheeled Play - implementation Albert-Eden
Deliver
Albert-Eden
To deliver the outcomes from the Wheeled Play Network Study as completed 0.00
0.00
145,000.00
0.00
0.00
0.00
0.00
0.00
0.00
145,000.00
N/A
No
by our Parks and Places Specialist. To purchase and instal modular pump track
and associated equipment.
FY25/26 - purchase and instal the equipment
Maungakiekie - Tāmaki - implement youth activation
Close
Maungakiekie-
This is a local board initiative to increase the youth play provision in the board 819,367.78
36,957.91
0.00
0.00
0.00
0.00
0.00
0.00
0.00
856,325.69
N/A
Yes
Consultation by Bespoke Landscape Solutions
This project includes various
Tāmaki
area by developing a skate park and/or pump track for the community as wel
scope of works. The work specific
as fitness stations and a basketbal courts.
to the pump track amounts to
Due to funding constraints and the skate park at Onehunga Bay Reserve being
$128k. No skatepark works were
deferred to future years, this provision wil al ow the board to fund a
carried out under this project
relocatable pump track at their discretion. The order of site placement is yet to
line.
be agreed.
FY18/19 to FY19/20 - investigation, design and planning
FY20/21 to FY21/22 - physical works
FY22/23 to FY23/24 - complete physical works
Lloyd Elsmore Park - renew skate park
Plan
Howick
Renewal of skatepark to ensure the facility is fit for purpose
89,694.99
30,723.26
801,903.00
200,000.00
0.00
0.00
0.00
0.00
0.00
1,122,321.25
Condition assessment
Yes
Online Have Your Say survey
FY22/23 - investigate, scope and design works
FY23/24 to FY26/27 - deliver physical works
Risk Adjusted Programme (RAP) project
Onehunga Bay Reserve - develop skate park
Plan
Maungakiekie-
This is a local board initiative to increase the youth play provision in the board 4,983.32
11,662.58
758,194.00
399,000.00
0.00
0.00
0.00
0.00
0.00
1,173,839.90
Network analysis
Yes
Consultation by Bespoke Landscape Solutions
Tāmaki
area by developing skating facilities. Due to funding constraints, priority has
been given to development of skate park facilities (i.e. the flow-bowl) over
upgrading the vertical ramp. This wil more widely increase youth play
provisioning.
FY23/24 - investigation
FY24/25 to FY26/27 - design, consenting and physical works
Logan Carr Reserve - minor wheel play activation
Strategic
Howick
Instal appropriately designed minor wheel play components on existing
0.00
0.00
40,000.00
80,000.00
80,000.00
0.00
0.00
0.00
0.00
200,000.00
N/A
Yes
Survey at Auckland Secondary School Skate Championships
Assessment
concrete pad. Wheel play options should consider an uplift in play service
levels catering for an older age group.
FY25/26 - investigation and design
FY25/26 to FY27/28 - detailed design and physical works
Risk Adjusted Programme (RAP) project
Colin Maiden Park - develop bike tracks
Strategic
Ōrākei
Development of bike tracks as replacement tracks for Colin Maiden Park.
0.00
0.00
629,760.00
0.00
0.00
0.00
0.00
0.00
0.00
629,760.00
Network analysis
Yes
Part of - Te Tauoma and Glendowie Pump Track engagements which are ongoing.
Assessment
FY25/26 - investigation and design, physical works
Victoria Park - instal lighting to the skatepark
Strategic
Waitematā
Instal ation of LED lighting to the Victoria Park skatepark.
0.00
0.00
140,000.00
0.00
0.00
0.00
0.00
0.00
0.00
140,000.00
N/A
In planning
Targeted consulted to be delivered
Assessment
FY25/26 - design, obtain any required consents, physical works
Streamview Way Park - develop youth park
Plan
Hibiscus and Bays
Develop a youth park with playground, skate or wheel play options, furniture 0.00
118,294.18
461,705.82
1,855,000.00
0.00
0.00
0.00
0.00
0.00
2,435,000.00
N/A
Yes
Two online Have Your Say surveys, co-design workshops with youth
and pathways to ensure al accessible.
FY24/25 - investigation and concept planning
FY25/26 - consenting and detailed design
FY26/27 - deliver physical works
Risk Adjusted Programme (RAP) project
Hibiscus and Bays - develop permanent pump tracks
Plan
Hibiscus and Bays
Locate preferred site in both Hibiscus Coast subdivision (Red Beach Park) and 0.00
16,796.43
160,051.57
126,000.00
687,222.00
0.00
0.00
0.00
0.00
990,070.00
N/A
Yes
Online Have Your Say survey
East Coast subdivision (Streamview Way Park), then design and implement a
permanent pump track.
FY24/25 to FY25/26 - investigate and design
FY26/27 - physical works
FY27/28 - investigation, design and physical works (second subdivision)
Risk Adjusted Programme (RAP) project
Stanmore Bay - renew skatepark
Strategic
Hibiscus and Bays
Renew the skatepark.
0.00
0.00
20,000.00
180,000.00
0.00
0.00
0.00
0.00
0.00
200,000.00
N/A
Renewal project, no Surface renewal only.
Assessment
FY25/26 to FY26/27 - investigation, design and physical works
consultation required
Risk Adjusted Programme (RAP) project
Luckens Reserve - renew wheel play and basketbal court
Strategic
Upper Harbour
Renewal/Improvements to the existing skate park and basketbal facilities to
0.00
0.00
20,000.00
130,000.00
150,000.00
0.00
0.00
0.00
0.00
300,000.00
N/A
Not at that phase of Have Your Say/ Community engagement with local school and other relevant
Assessment
support the demand of population growth.
the project yet
groups wil be completed during planning phase.
FY25/26 - investigation and design
FY26/27 to FY27/28 - physical works
Risk Adjusted Programme (RAP) project
Bob Hil Reserve - refurbish skate park
1A.Pipeline
Whau
Refurbish skate park.
0.00
0.00
0.00
20,000.00
150,000.00
0.00
0.00
0.00
0.00
170,000.00
Condition assessment
Not at that phase of
the project yet
FY26/27 - investigation and design
FY27/28 - physical works.
Sister Rene Shadbolt Park - upgrade skate park/basketbal half court
Initiate
Whau
Upgrade skate park/basketbal half court for Tiakina/Sister Rene Shadbolt Park. 0.00
0.00
60,000.00
340,000.00
0.00
0.00
0.00
0.00
0.00
400,000.00
Condition assessment
Not at that phase of
Provide more seating and shelter.
the project yet
FY25/26 - consultation, investigation and design
FY26/27 - physical works
Risk Adjusted Programme (RAP) project.
Riversdale Reserve - renew and improve - playground and skate park
Deliver
Whau
Renew and improve playground and skate park surface at Riversdale Reserve. 0.00
0.00
40,000.00
290,000.00
0.00
0.00
0.00
0.00
0.00
330,000.00
Condition assessment
No
Renewal/H&S works of the skate
The Play Network Gap Analysis Report recommends consider inclusion of
portion of the project, retaining
chal enging spinning experience for senior - youth age groups, alongside
wal s, surfacing and concrete
additional jumping and rocking experiences and improvement of
treatment, no service increase.
creative/imaginative.
No consultation required for
Skate portion
FY25/26 - investigation and design
FY26/27 - physical works
Close
Waitematā
Renewals of Open space play equipment that are condition 4 and 5, refer the 107,230.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
107,230.00
Condition assessment
No
Renewal and reinforcing of the
asset assessment reports for the identified scope. Victoria Park Skate Park
skate ramp, resurfacing and
Open space play spaces - renew - 2023/2024 to 2024/2025 -
Renewal
repair to the concrete surface of
Waitematā
the street sections of the park.
Close
Orakei
Renewals of Open space play equipment that are condition 4 and 5, refer the 8,500.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
8,500.00
Condition assessment
No
Surface grind and repair to both
asset assessment reports for the identified scope. Crossfield Reserve
bowls, temporary manual pad
Skatebowl Renewal
formalised at request of local
Open space play space equipment - renew - 2023/2024 to
board fol owing request from
2025/2026 - Ōrākei
public.
Document Outline