From:
To:
FastI@ckAppijcatjonE0011icies
Subject:
Bendigo Ophir Gold Project Fast-Track Application Consultation Request
Date:
Friday, 28 February 2025 11:08:27 am
Attachments:
iroaoe001 joo
BQGP ore-lodaement-fast-track-apolication-cons,,ltatjon-aoplication-form odf
BQGP Pmiect Qescciotion - AEE -20 Feb 2s DOC ffA Consultation odf
Bendigo Ophir Gold Project Fast-Track Application Consultation Request
Act
Please find attached:
• Request for pre-lodgement Fast-track application consultation form -
BOGP
pre-lodgement-fast-track-application-consultation-application-form
• Details of the prosed activity-
BOGP Project Description -AEE- 20Feb 25 DOC
FTA Consultation
Since aspects of the project are still being refined the Project Description is marked
as draft.
We look forward to being able to discuss the project with you.
If you require any further information, please do not hesitate to contact me.
Information
Regards
Environment Manager
M:
@santanaminerals.com Official
W: www.santanaminerals.com
The information contained in this message i� confidential and ma(i be legal�priviteged. If the reader of this mi:ssarfi, is not the intended reci£ient
;°!i��'!e��% '3:t it;;�f���a8J�og c:;;eproduction O
this mes age is prohibited. If you have recetved his message in error, pie se 61Qu
f!ne,/?:�rlt:.1
n tify us
the
under
Released
Request for Fast-track Pre-lodgement
Consultation
Purpose - To request pre-lodgement consultation on fast-track referrals or substantive
applications as required by the Fast-track Approvals Act 2024
Act
Instructions:
Please email the completed form to [email address]
NOTE: DOC will recover the actual and reasonable costs incurred in consulting and assisting y ou before the
application is lodged (whether or not the application is subsequently lodged).
Project Details
Your role &
company: Environment Manager, Santana
Your name:
I
Minerals Limited
Information
Phone number:
I
Email:
@santanaminerals.com
"Fast-track applicant's name (Company Name and Trading Name (if different)): Matakanui Gold Limited
"Project name and summary: Bendigo Ophir Gold Project
(BOGP)
Official
BOGP comprises a new gold mine, ancillary facilities and environmental mitigation measures. The BOGP involves
mining the identified gold deposits at Rise and Shine
("RAS"), Come in Time ("CIT") and Srex
("SRX"). The
resources will be mined by open pit methods at each location identified above, with underground mining methods
also proposed to be utilised at RAS. The majority of the mining activities, ancillary facilities and associated
the
infrastructure will be located in Shepherds Valley, with an additional general and administration area located on the
adjoining Ardgour Terraces area.
under
"Project location (high-level):
The project is located on Bendigo and Ardgour Stations in the Dunstan Mountains of Central Otago. The project
site is located within Minerals Exploration Permit 60311, which is approximately 20 km north of Cromwell.
Released
oJ Department of
Conservation
Te Kawanatanga
oAotearoa
Te PapaAtawhai
New Zealand Government
GPS location and/or map:
Act
Information
SANTANA MIHERALS MINE.SrrE LOCATION PLAN
Official
Is the project on Public Conservation Land? • No, but is possible that some targeted areas of Public
Conservation Land will be the subject of off-site mitigation and compensation package
Type of Fast-track Application: An application under the Fast Track Approvals Act 2024. See below in
the
relation to the type of consents sought (in addition to resource consents under the RMA).
Applicant Phone number:
Applicant email:
@santanaminerals.com
under
Details of the proposed activity:
See attached document
Details of any relevant Treaty of Waitangi settlement obligations you are aware of and any engagement
Released
you have undertaken with local iwi/hapO:
While the Ngai Tahu Claims Settlement Act 1998 applies to the geographical location of the project we are not
aware of any specific Treaty of Waitangi settlement obligations affecting the project site. No statutory
acknowledgements apply to the site. Consultation has been initiated with local iwi/hapo.
What conservation approvals do you think may be required for the activity?
•
Concessions under the Conservation Act 1987, Reserves Act 1977,
Yes
Wildlife Act 1953, and National Parks Act 1980
•
Authorities provided under the Wildlife Act 1953
Yes
•
Act
Specific permissions under the Freshwater Fisheries Regulations 1983
Yes
•
Access arrangements under the Crown Minerals Act 1991
Yes
•
Exchanges of land under the Conservation Act 1987 or Reserves Act
No
1977
•
Amending or revoking conservation covenants under section 27 of the
Yes
Conservation Act 1987 or section 77 of the Reserves Act 1977
•
Other
Information
What current interests over the land are you aware of? A conservation covenant under section 77 of the
Reserves Act applies to the land
Is there any other additional information that may be relevant? (e.g. is the activity in a World Heritage
Area?)
Official
N/A
the
Date initially planning to lodge (subject to pre-lodgement consultation discussions):
29 April 2025
Disclaimers:
under
•
The purpose of collecting this information is to enable the Department to respond to your request for pre-lodgement consultation and your
application if one is subsequently lodged. The Department will not use this information for any reason not related to that purpose.
•
DOC works with others to achieve its conservation goals and has a responsibility to give effect to the principles of the Treaty of Waitangi.
DOC may share some of the high-level information you provide above (highlighted with a ') with our Treaty partners and Conservation
Boards and Authority within the context of dealing with your application. To clarify DOC will not be consulting with these groups on your
behalf and you are responsible for any pre-lodgement consultation with them. DOC will also not represent the views of those groups or
others in our pre-lodgement consultation with you. However, if any interests are identified early, this can help support DOC's advice to you
in the early steps of this application.
•
Applicants should be aware that provisions of the Official Information Act may require that some or all information provided to DOC be
publicly released.
Released
1.
PROJECT DESCRIPTION
This section of the AEE is provided in accordance with Clause and of Schedule of
the Fast-track Approvals Act and provides a description of the activities proposed by MGL
as part of its fast-track application.
Act
For completeness, and in accordance with Clause of Schedule of the Fast-track
Approvals Act, this section of the AEE provides a complete description of all activities that
form part of the proposed BOGP.
1.1
PROJECT OVERVIEW
As previously noted, the BOGP comprises a new gold mine, ancillary facilities and
environmental mitigation measures on Bendigo and Ardgour Stations in the Dunstan
Mountains of Central Otago. The project site is located within Minerals Exploration Permit
60311, which is approximately 20 km north of Cromwell.
Information
The BOGP is located adjacent to land administered by the Department of Conservation
("DOC"), including the Bendigo Historic Reserve, the Bendigo Conservation Area and the
Ardgour Conservation Area.
Official
the
under
Released
Matakanui Gold Limited - Bendigo-Ophir Gold Project
L
,
Fast-Track Application and Assessment of Environmental Effects
From:
FastTrackApplicationEnquiries
To:
Cc:
FastTrackApplicationEnquiries
Subject:
RE: Bendigo Ophir Gold Project Fast-Track Application Consultation Request
Date:
Friday, 28 February 2025 3:12:44 pm
Attachments:
image001.jpq
Cost Recovery Initial Estimate Letter
-•-W j . .D!!f
Kia ora
Thank you for your interest in engaging with DOC in consideration of your proposed Fast-track
Act
Approvals application.
The Fast-track (Cost Recovery) Regulations 2025 and DOCs Fast-track Cost Recovery Policy were
published on 7 February 2025. Under the fast-track Cost Recovery regime applicants are
required to pay an estimate of the costs prior to pre-lodgement consultation. The enclosed letter
includes this estimate.
Please complete the New Customer Form found here. and return it to us at
[email address] to enable us to proceed with the pre-lodgement
consultation.
Once this has been completed, we will send you an invoice for payment that must be paid before
work can commence.
Nga mihi nui,
Information
Grace Masterton (she/her)
Permissions Advisor
Te Papa Atawhai I Department of Conservation
From: =---..ll
Sent: Friday, 28 February 2025 11:08 am
To: FastTrackApplicationEnquiries
Official
Subject: Bendigo Ophir Gold Project Fast-Track Application Consultation Request
I You don't often get email from
@santanamjnerals com. Learn why this is impmtaut
Bendigo Ophir Gold Project Fast-Track Application Consultation Request
the
Please find attached:
• Request for pre-lodgement Fast-track application consultation form -
BOGP
pre-lodgement-fast-track-application-consultation-application-form
• Details of the prosed activity-
BOGP Project Description -AEE- 20Feb 25 DOC
FTA Consultation
under
Since aspects of the project are still being refined the Project Description is marked
as draft.
We look forward to being able to discuss the project with you.
If you require any further information, please do not hesitate to contact me.
Regards
Released
Environment Manager
M:
W: www santanamjnerals com
The information contained in this messaa
- confidentia
nereD',( notJfl�£
'ldnd m�
be leaallv orivi
.
at anv use,
�e ed. If the reader of. this messaae is nothth e
intended rectP._tent vou are
6
��
,ssem,
atJon ar .rep_roc/u on
t
of
this message ,s pron101tea. It you ave
received tnts message m error, p,ease no
us 1mme<11a e1y an return ne ongma message to us.

Conservation House
18 Manners Street
Wellington 6011
Email
fasttrackapplicationenguiries
@doc.qovtnz
28-0 2 -2025
Tena koe
Act
Environment Manager
Fast Track Application - Pre-Consultation Request
Santana Minerals Limited
Thank you for your interest in engaging with DOC in consideration of your proposed Fast-track
Approvals application.
Section 104 of the Fast-track Approvals Act allows for DOC to recover the actual and reasonable
costs in undertaking pre-consultation. DOC's Cost Recovery Policy can be found on the DOC
website - Request a fast-track pre-lodgement consultation.
In summary the key steps from here are:
• DOC will send you an estimate of pre-lodgement costs (this letter) and a New Customer
Form. Please fill out the New Customer Form for our Finance system and return asap;
Information
• You will then be sent an invoice for payment that must be paid before work can commence.
• Actual time will be tracked, and you will be advised as we progress; and any difference
between the estimate and the final time will then be invoiced or refunded.
DOC has a standard $204 hourly rate for all work undertaken as part of exercising its role under
the Fast-track Approvals Act 2024, with the first hour provided free.
Pre-lodgement Estimate
Official
Our initial fee estimate for your application is based on an estimated 10 hours of work. Given the
first hour is free, this totals $1,836 (before GST).
the
A breakdown of these estimated costs is provided in the table below:
Step
Estimated Resourcing
Total Time
Receive Request / Undertake Initial
1 person for 2 hours
2 hours
Assessment
under
Engage DOC Experts
3 people for 1.5 hours each
4.5 hours
Summarise Advice
1 person 1.5 hours
2 hours
Pre-Lodgement Meeting with Applicant
3 people 30 mins
1.5 hours
Should additional matters be raised, adding to the complexity, an updated fees assessment will
be provided to you. If you have any questions please do not hesitate to contact us at
[email address].
Naku noa, na
Released
Susan Smith
Fast-track Applications Manager
6J Department of
Conservation
Te Kawanatanga
le
oAotearoa
Papa Atawbai
New Zealand Government

duplicate email
Act
Information
From: Marie Payne <[email address]>
Sent: Monday, 19 May 2025 9:02 am
To: John Roberts <[email address]>
Subject: FW: DOC Pre-lodgement consultation request BOGP
Hey John,
FYI the response below from s.9(2)(a)
Kind regards,
Official
Marie
On behalf of the Fast Track Applications team
Te Papa Atawhai | Department of Conservation
the
Whare Kaupapa Atawhai | Conservation House
18 - 32 Manners St | PO Box 10 420, Wellington 6143
www.doc.govt.nz
under
From: s.9(2)(a)
@santanaminerals.com>
Sent: Monday, 19 May 2025 8:35 am
To: Marie Payne <[email address]>
Subject: RE: DOC Pre-lodgement consultation request BOGP
Good morning Marie,
You have been on my mind! Indeed, the submission date has been pushed back until June (late) and we are crazy busy as you could imagine.
We are just about ready to send through the information you requested. It has taken longer than I planned but we are nearly there.
Released
Many thanks for checking in, I will be in touch.
cheers
s.9(2)(a)
Environment Manager
M:s.9(2)(a)
E:s.9(2)(a) @santanaminerals.com
From: Marie Payne <[email address]>
Sent: Monday, 19 May 2025 8:26 am
To: s.9(2)(a)
@santanaminerals.com>
Subject: RE: DOC Pre-lodgement consultation request BOGP
Caution: This Email is from an EXTERNAL source. Please exercise caution. DO NOT open attachments or click on links from unknown senders or
unexpected email.
Hi s.9(2)(a)
It has been a few weeks since we last caught up so I just wanted to check in, in relation to the below. Previously I understood you were working on providing
some further information which was specific to the DOC approvals being sought.
Act
I note that the intended lodgement date initially provided was the 29th of April, so also wondered if you were working towards a revised target lodgement date.
Happy to set up a meeting/discuss further and answer any questions etc…
Kind regards,
Marie
Marie Payne
Senior Advisor Fast Track Applications
Te Whanganui-a-Tara | Wellington
Mobile: s.9(2)(a)
Information
From: FastTrackApplicationEnquiries
Sent: Wednesday, 19 March 2025 4:00 pm
To: s.9(2)(a) @santanaminerals.com
Subject: DOC Pre-lodgement consultation request BOGP
Kia oras.9(2)(a)
Thank you for the pre-lodgement consultation request submitted. I (Marie Payne) will be the DOC fast track application lead for the Bendigo-Ophir Gold
Project.
Official
I have reviewed the information provided to date and request and to move forward it would be helpful if you could provide some more information around the
fast-track proposal.
Specific detail around each permission/activity for which an approval is being sought from DOC e.g. a Wildlife Approval would need to be specific to
the
species and activity. Concessions should detail specific activity/location etc…
Background information to support that approval e.g. draft application documents/external assessments and reports
Identification of any requests/application currently underway with the permissions team/local office
Without more specific further information we would be unable to provide feedback in relation to the DOC approvals being sought.
I acknowledge that you have been working with our local office previously for different approvals. As a fast-track request, I will be co-ordinating DOC’s
response to all of the approvals/permissions you identify as part of the fast-track application.
under
Our financial team has also noted no consultation deposit had not been received as of late last week, if you are able to progress this to enable us to proceed
when further information is received that would be very helpful. If you have already, please confirm and I can follow up.
I am on leave tomorrow but happy to give you a call and walk through DOC’s fast track process/answer any questions you may have at this point (my details are
below).
Kind regards,
Marie
Marie Payne
Senior Advisor Fast Track Applications
Te Whanganui-a-Tara | Wellington
Released
Mobile: s.9(2)(a)
Caution - This message and accompanying data may contain information that is confidential or subject to legal privilege. If you are not the intended recipient you are
Fast Track Application Enquiries
To: Marie Payne, Senior Advisor Fast Track Applications
Act
Department of Conservation
Subject: DOC Pre-lodgement consultation request BOGP
Date: 19 May 2025
From: s.9(2)(a)
Environment Manager
Information
Responding to your request for more information on the Bendigo Ophir Gold Project
(BOGP) fast-track proposal, please find below information regarding:
• Specific detail around each permission/activity for which an approval is being
sought from DOC e.g. a Wildlife Approval would need to be specific to species
and activity. Concessions should detail specific activity/location etc…
• Background information to support that approval e.g. draft application
Official
documents/external assessments and reports
• Identification of any requests/application currently underway with the
permissions team/local office
the
Rest of document withheld under s.9(2)(ba)(i) & 9(2)(b)(ii)
under
Released
From:
FastTrackApplicationEnquiries
To:
s.9(2)(a)
Cc:
FastTrackApplicationEnquiries
Subject:
RE: Bendigo Ophir Gold Project
Date:
Tuesday, 11 March 2025 10:59:02 am
Attachments:
image001.jpg
Kia ora s.9(2)(a)
A DOC initial estimate cost recovery invoice was sent to your accounts team on 6th
Act
March regarding your request for pre-lodgement consultation for Fast-track Bendigo
Ophir Gold Project.
Once this invoice has been paid, we will assign your application with a team lead and
begin consultation.
Please reach out if you have any questions.
Ngā mihi,
Grace Masterton (she/her)
Permissions Advisor
Te Papa Atawhai | Department of Conservation
From: FastTrackApplicationEnquiries
Information
Sent: Tuesday, 4 March 2025 4:39 pm
To: s.9(2)(a)
Cc: FastTrackApplicationEnquiries
Subject: RE: Bendigo Ophir Gold Project - New Customer form
Kia ora s.9(2)(a)
Thank you for this.
Official
We are now working on getting the invoice sent to you shortly.
Once this invoice has been paid, we will commence pre-lodgement consultation with
you.
the
Ngā mihi,
Grace Masterton (she/her)
Permissions Advisor
Te Papa Atawhai | Department of Conservation
From: s.9(2)(a)
@santanaminerals.com>
under
Sent: Tuesday, 4 March 2025 1:57 pm
To: FastTrackApplicationEnquiries <[email address]>
Subject: Bendigo Ophir Gold Project - New Customer form
You don't often get email from s.9(2)(a)@santanaminerals.com. Learn why this is important
Hi Grace,
Thank you for your email on 3 March regarding the New Customer Form. I have
completed the form and attached as requested.
If you require any further information, please let me know.
Released
Regards
s.9(2)(a)
Environment Manager
M: s.9(2)(a)
E:s.9(2)(a)@santanaminerals.com
W: www.santanaminerals.com
The information contained in this message is confidential and may be legally privileged. If the reader of this message is not the
intended recipient you are hereby notified that any use, dissemination or reproduction of this message is prohibited. If you have
received this message in error, please notify us immediately and return the original message to us.
Act
Information
Official
the
under
Released