Cheers
Mat Collins BEng (Hons)
Associate Transportation Planner, Abley
abley.com
From: Dave Smith
Sent: Monday, January 8, 2024 1:43 PM
To: Suzanne Rushmere <[email address]>; Mat Collins
Cc: Emily Thomson <[email address]>; Patrick Hanaray <[email address]>
Subject: RE: UHCC Deficiency Analysis Note
Hi All
Happy New Year. We have re-run the 2053 conserva ve scenario with the full SGA loaded in the vicinity of Kiln
Street. Looking back we had it split 50/50 between accessing Eastern Hu Road directly and being loaded into
Silverstream so the impact of the test is to move 375 lots only back into Silverstream.
The model is not picking up any addi onal Level of Service issues at the key roundabouts with delays changing by no
more than a few seconds. However, we have observed the following changes:
-the right turn issue onto Eastern Hu Road as a result of the direct access has disappeared.
-Field Street from Fergusson Drive to Kiln Street has deteriorated in both morning and evening peak from LoS C to
LoS D as shown below (morning is on le and evening on right).
6
As before a more detailed model (such as a Sidra Intersec on model) may highlight issues on roundabout
intersec on approaches.
Please advise if you require further ac on or repor ng on this test.
Regards
Dave
7
Figure 2: Growth locations
Figure 3: TRACKS model network, showing zone connectors for Southern Growth Area