Suze
S uzanne Rushmere
S enior Planner (Policy) | Kaiwhakamahere Matua
Te Kaunihera o Te Awa Kairangi ki Uta | Upper Hutt City Council
838 – 842 Fergusson Drive, Private Bag 907, Upper Hutt, 5140, New Zealand
T: +64 4 8855706 | E: [email address]
W: upperhuttcity.com | F: fb.com/UpperHuttCityCouncil
From: Mat Collins
Sent: Wednesday, February 28, 2024 12:58 PM
To: Suzanne Rushmere <[email address]>
Cc: Dave Smith
Subject: RE: GTC / UHCC / Abley catch up re landuse assumptions
Importance: High
Hi Suze, just checking in on how you’re going with getting approval to release the TRACKS model and land use
assumptions? We’re on a tight timeline to be able to assist Guildford with their evidence.
Cheers
Mat Collins BEng (Hons)
Associate Transportation Planner, Abley
abley.com
From: Mat Collins
Sent: Thursday, February 22, 2024 12:14 PM
To: Suzanne Rushmere <[email address]>
Cc: Dave Smith
Subject: RE: GTC / UHCC / Abley catch up re landuse assumptions
Hey Suze, just checking in to see if we have approval to share the transport model with Guildford.
Cheers
Mat Collins BEng (Hons)
Associate Transportation Planner, Abley
abley.com
From: Mat Collins
Sent: Thursday, February 15, 2024 11:50 AM
To: Mat Collins
; Alan.kerr
phernne.tancock
phil.peet
Regan Toogood
Dave Smith
[email address]; chris
michael.hall
Subject: GTC / UHCC / Abley catch up re landuse assumptions
3
Hi all, my brief minutes from the meeting today along with the modelling summary that was shared on
screen. Please reply all with any corrections/clarifications.
Mat Collins BEng (Hons)
Associate Transportation Planner
Auckland + Wellington + Christchurch
abley.com
Be inspired - sign up now!
GTC / UHCC / Abley catch up re landuse assumptions
Thursday, 15 February 2024
11:02 am
GTC / UHCC / Abley catch up re landuse assumptions
Thu, 15 Feb, 11:00 am - 12:00 pm
Microsoft Teams Meeting
Link to Outlook Item
Invitation Message
Participants (9)
Mat Collins (Meeting Organizer)
Alan Kerr (Accepted Meeting)
Phernne Tancock (Accepted Meeting)
Phil Peet (Accepted Meeting)
Regan Toogood (Accepted Meeting)
Dave Smith
Suzanne Rushmere (Accepted Meeting)
Chris Hansen (Accepted Meeting)
Michael Hall (Accepted Meeting)
Notes
4
DS confirms that the UHCC transport model has been updated. Future land use assumptions for scenarios
have been determined by UHCC
DS gave an overview of the 3 Scenarios modelled, 3 step model with no mode shift
SR suggests that
o Scenario 1 is a starting point for assessing Southern Growth Area
o Scenario 2/3 are based on Council estimates for development areas, may not align with Guildford
Timber intent
SR confirms that all Scenarios account for MDRS, with uplift added to Greenfield Development Areas plus
some growth spread over existing urban, with a sense check to adjust for areas with no / more growth
might be feasible.
PT asks if SR can provide more detail on growth assumptions for Scenario 1.
Action - SR will check internally if growth assumptions and model details can be shared.
DS advises that the UHCC Transport Model is strategic, more detailed assessment using SIDRA is advised.
AK queried trip generation assumptions. DS confirmed that this is based on existing Census data. Based on
vehicle ownership and veh/HH. Existing good access to public transport is reflected in existing traffic
movements, the model has had calibration/validation of the transport model against observed traffic
movements.
DS confirmed that Abley can calibrate the model based on requests from PP/AK.
SR confirms that the transport model is UHCC's best attempt at incorporating PC49 (new road connection to
SGA) and MDRS/IPI. The model is suitable as a start point for Guildford to prep evidence from.
Created with OneNote.
The information contained in this email and any attachments is confidential and intended for the
named recipients only. If you are not the intended recipient, please notify the sender immediately
and delete this email.
The information contained in this email and any attachments is confidential and intended for the
named recipients only. If you are not the intended recipient, please notify the sender immediately
and delete this email.
5
Figure 2: Growth locations
Figure 3: TRACKS model network, showing zone connectors for Southern Growth Area