This is an HTML version of an attachment to the Official Information request 'Cycle Connections at Dowse Interchange'.

        
 
               
  
Cycle Advocates Meeting 
Time: 
10.30 – 11.30am 
Date: 
Wednesday 8th December 2021 
Location: 
MS Teams 
AGENDA 
 
Item 
Description 

Introductions and karakia  
Out of Scope

Te Ara Tupua - Petone to Melling  

Te Ara Tupua - Ngā Ūranga ki Pito-One  
Out of Scope
10 
Wrap up, schedule of meetings in 2022 and karakia 
 
ATTENDEES 
 
• 
Adrienne Black 
• 
David Cross  
• 
Sarah Martin 
• 
Joel Rowan 
• 
Sharleen Hannon  
• 
Simon Kennett 
• 
Sarah Ropata 
• 
Hannah Hyde 
• 
Gray Renwick 
• 
Claire Harman 
• 
Jonathan Kennett 
• 
Paul Barker 
• 
Deborah Wright 
• 
Timon Bakker 
• 
Marco Renall  
• 
Gene Clendon 
• 
David Tripp  
• 
Alex Dyer  
• 
Larri Wallbridge 
 
 
 

 
 
 
MINUTES 
Topic 
Minutes 
• 
New project leads introduced.  
Introductions  
• 
Cycle advocates introduced.   
Out of Scope
• 
A Safety Audit has been completed for the Petone Station.  
• 
A painted buffer will be added to the path through the carpark, to give space between 
parked cars and people using the path - similar to that on Hutt Road. Note a fence will 
not be provided as this will increase the safety risk to pedestrians.  
• 
Signage will direct pedestrians to the existing underpass, however we cannot ban people 
from walking through the new underpass.  
Te Ara Tupua – Petone to 
• 
Feedback received:  Reinforced the need for a connection onto the P2M path south of 
Melling 
Dowse.  

This requires agreement with KiwiRail for a new level crossing – something 
KiwiRail is actively trying to reduce. It also needs to link into the local network 
and will require coordination with HCC. This remains something Waka Kotahi is 
keen to progress.  
• 
Action: Share the Safety Audit (AB) 
 
Te Ara Tupua - Ngā Ūranga 
• 
The Te Ara Tupua Alliance has been progressing the shared path design, methodology 
ki Pito-One 
and pricing work.  
  
Page 2 of 3 

 
 
Topic 
Minutes 
• 
Some changes to the design are going to need to be made but the width of the path is 
something the team are not compromising on. 
 
Out of Scope
Wrap up, schedule of 
• 
Action: Quarterly meetings for 2022 to be scheduled (AB).   
meetings in 2022 and 
karakia 
 
  
Page 3 of 3