Board Meeting | 28 February 2023 
Agenda item no. 17 
Closed Session 
CONFIDENTIAL 
 
Auckland Transport Open Loop Recommendation 
For decision: ☒ 
For noting: ☐ 
Reason for inclusion in closed board meeting session 
1.  Please state why this report is being considered in the closed board 
1. To protect commercial interests of both Cubic and 
meeting as opposed to the open board meeting.  Please refer to the 
Thales/GTS. 
'reasons for confidentiality' and provide a direct reference to one of 
2. To protect confidentiality, as a decision needs to be 
these reasons. 
considered carefully and not impact future commercial contract 
negotiations. 
7. To protect the integrity of political and administrative 
processes re Procurement between Thales/GTS and Cubic. 
2.  Please provide an estimated date for release of this report. 
Not for release. 
Ngā tūtohunga / Recommendations 
That the Auckland Transport Board (board): 
a)  Notes that the proposed solution will use a combination of the Ground Transportation Systems (GTS, formerly known as Thales) and with 
Cubic/National Ticketing System (NTS) EMV (Europay, MasterCard, Visa – payment cards with a smart chip) processing capability at the 
backend as the preferred option for the implementation of early EMV Open Loop functionality for Auckland. 
b)  Approves  operating  expenditure,  as  a  Software  as  a  Service  (SaaS)  offering  via  Waka  Kotahi  New  Zealand  Transport  Agency  (Waka 
Kotahi), of the Cubic component for the proposed solution of 
 over 2022/23 and 2023/24, noting this is subject to draft 2023/24 
budget considerations in March 2023.  The 
 will potentially attract a Waka Kotahi funding assistance rate (FAR) as a bring forward 
of NTS expenditure. 
c)  Notes that in order to achieve the combined solution above, the GTS/Thales component, including various back-office components, could 
be used for the limited EMV transactions should the Cubic/Waka Kotahi back office not be available at the planned time, noting that when 
the Cubic backend is available that AT will migrate the EMV open loop transaction processing to it.   
 



Board Meeting | 28 February 2023 
Agenda item no. 17 
Closed Session 
CONFIDENTIAL 
 
Te whakarāpopototanga matua / Executive summary 
1.  At the end of September 2022, the board approved the implementation of an open loop ticketing capability in order to achieve substantial 
patronage, customer experience, decongestion, and environmental benefits. The approval was based on a business case prepared by 
PricewaterhouseCoopers (PwC) using cost and implementation assumptions from a commercial proposal provided by AT’s incumbent 
ticketing provider, GTS/Thales. The board also directed management to consider an alternative option for achieving open loop benefits by 
bringing forward capability planned for the NTS and delivered by the NTS. The board delegated the decision about which option to take to the 
Interim Chief Executive, asked that this analysis be completed and a decision made by the end of October 2022. 
2.  The analysis has now been completed, and following extensive engagement with Waka Kotahi, management in conjunction with Waka Kotahi 
recommends that AT implements a combined solution using GTS/Thales equipment and some backend functionality required to support 
those devices and required interfaces, and Cubic/Waka Kotahi functionality for the EMV financial processing. 
3.  This mixed approach provides a clear transition option when AT migrates fully to Cubic in a few years’ time.  In the meantime, it de-risks both 
organisations from a probity perspective, and also from an implementation approach as should the integration take longer AT could still take 
transactions using Thales as an interim.  
4.  This also moves AT onto a standard GTS/Thales product which will make support easier to provide from global services as the New Zealand 
contract winds down which assists with mitigation of this risk. 
5.  Since November 2022, Waka Kotahi has engaged extensively to influence AT’s decision about open loop.   
Ngā tuhinga ō mua / Previous deliberations 
Date 
Report Title 
Key Outcomes 
September 2022 
AT HOP Open Loop 
The board endorsed the objectives and outcomes of the business case for the interim AT 
Board 
Business Case 
HOP open loop capability, planned to be implemented within 12 months for busses initially 
and to train and ferry modes within 18 months, with funding up to 
 noting the 
preferred implementation pathway is to be confirmed by 31 October 2022 and delegated 
authority to the Interim Chief Executive to decide that pathway. 
September 2022  
AT HOP Open Loop 
The committee recommended that the board endorse the business case for AT HOP open 
Design and Delivery 
Business Case 
loop capability.  Members noted the criticality of open loop capability as an essential risk 
Committee (committee) 
mitigant to delivery of NTS as well as the importance to increasing PT patronage. 
 



Board Meeting | 28 February 2023 
Agenda item no. 17 
Closed Session 
CONFIDENTIAL 
 
May 2022 
Project Next – 
The board approved the preparation of the AT HOP open loop business case. 
Board 
Negotiation Update 
October 2017 
AT HOP Open Loop 
Direction was provided to support the NTS and not to proceed with AT HOP open loop. 
Board 
Project 
Te horopaki me te tīaroaro rautaki / Context and strategic alignment 
6.  The context and strategic alignment of open loop ticketing capability was outlined in the September 2022 board paper and remains 
unchanged.   
7.  The approach recommended in this paper addresses strategic supplier alignment by continuing to engage with Waka Kotahi to create the 
opportunity for further optimisation and acceleration of the planned NTS capability.  It also provides additional work for AT’s incumbent 
ticketing supplier, which reduces risk associated with their commercial incentives as the end of their relationship with AT approaches. 
Ngā matapakinga me ngā tātaritanga / Discussion and analysis 
8.  In October 2022, workshops were held with Waka Kotahi and its supplier Cubic to gain the information that they needed to develop an open 
loop (early EMV) proposal for AT. A proposal from Cubic/Waka Kotahi was provided in early November 2022.  
9.  In early November 2022, AT convened a group of ticketing, technical, and programme delivery subject matter experts (SMEs) to evaluate the 
Waka Kotahi and the GTS/Thales proposals in a series of workshops. Following these workshops, an evaluation report and associated 
materials were produced which recommended the GTS/Thales option. This recommendation was provided to AT executives on 17 November 
2022 and shared with Waka Kotahi at approximately the same time. Since late November, Waka Kotahi has engaged extensively to influence 
AT’s decision about open loop. 
10. Following the discussions with Waka Kotahi, AT and Waka Kotahi have jointly determined that the best implementation path in principle is to 
implement the GTS option while in parallel developing an integrated open loop NTS capability using the planned NTS infrastructure (noting that 
this  work  and  any adoption  of  the  capability  would  not  represent  a transition  to  NTS by  AT).   This  approach  minimises  the  risk  of  delay  in 
obtaining the benefits of open loop for AT while building earlier integration of NTS and the associated transition planning. The details of this are 
still to be determined during detailed design phases. 
 



Board Meeting | 28 February 2023 
Agenda item no. 17 
Closed Session 
CONFIDENTIAL 
 
Ngā tūraru matua / Key risks and mitigations 
Key risk 
Key points 
Mitigation 
Lack of Waka Kotahi co-funding 
Discussions with Waka Kotahi on 
Explore co-funding potential given the future transition cost 
means the full implementation 
funding this project are ongoing given 
savings are significant to the NTS and AT. 
cost must be borne by AT.  
the dependency on it for NTS transition.  AT is prepared to fully fund AT HOP open loop as it has a 
financial payback. 
Poor value for money being 
If actual patronage uplift is lower than 
Comprehensive communication and marketing package as 
achieved from implementing open  anticipated, this will lead to a longer 
part of the roll out to help achieve the patronage outcomes.  
loop. 
payback period. 
Clear understanding of the benefits delivered to the NTS 
transition to offset the upfront investment. 
Actual implementation costs are 
Technology projects inherently carry 
Two thirds of the cost estimate is based on a commercial offer 
higher than the estimated cost of 
scope and implementation risks that 
from GTS/Thales. The remaining one third is primarily based 
$23 million.  
can have significant cost impacts.  
on well-established cost information and includes a 10% 
contingency.  
Ngā ritenga-ā-pūtea me Ngā rauemi / Financial and resource impacts 
11. AT commissioned PwC to prepare a business case on the open loop proposal.  PwC estimated that, over the 10-year period (financial year 
2022-2023 to financial year 2031-2032), the financial net present value (NPV) of moving to open loop is between -$21 million and +$32 
million. The outcome is dependent on the uplift in patronage that will occur as a result of introducing open loop (estimated at between 1% to 
3.5%). To break even from a financial perspective (ignoring economic benefits), an increase in patronage of 1.9% is required. The NTS 
detailed business case assumes an uplift in patronage of between 1.5% to 2.5%. 
12. Implementing open loop into AT HOP requires 
 in capital investment, with most expenditure occurring in financial year 2023-2024. 
Once implemented, there will be an increase in operating expenditure of 
 per annum.  
13. The payback period for upgrading AT HOP to open loop is dependent on the uplift in patronage that is induced and when the transition to the 
NTS occurs. However, the expected reduction of 
in the NTS transition costs, means that value for money (from a purely financial 
perspective) from the investment in open loop is achieved if transition to the NTS occurs in or after financial year 2026-2027, because of the 
financial payback. It is noted that transition is planned for 2025/26. 
 



Board Meeting | 28 February 2023 
Agenda item no. 17 
Closed Session 
CONFIDENTIAL 
 
14. Additional costs associated with the parallel development of open loop and the NTS capability with Waka Kotahi has been identified as 
 
 for the Cubic component.  The GTS/Thales component if any will be identified over the coming months. AT will require additional 
project resources to support both NTS, and Early EMV which has been budgeted for. 
15. Of the 
, circa 
 is for EMV capable hardware, 
 is for Thales software development and the remainder is for other 
related costs including AT Project costs. 
Ngā whaiwhakaaro ō te taiao me te panonitanga o te āhuarangi / Environment and climate change 
considerations 

16. There are direct environmental and climate change impacts to be considered in relation to open loop. Open loop has a key role to play in 
delivering on the Transport Emissions Reduction Pathway, through enabling faster and easier mode shift to public transport.  
17. Giving people a convenient and easy way to pay for public transport without having to pre-plan encourages mode shift from light vehicles to 
busses, trains, and ferries, easing congestion and lowering emissions.  
Ngā whakaaweawe me ngā whakaaro / Impacts and perspectives 
Mana whenua 
18. There are no direct mana whenua impacts in relation to the business case for AT HOP open loop.  
Ngā mema pōti / Elected members 
19. At this stage there is no need for consultation with elected members. 
Ngā rōpū kei raro i te Kaunihera / Council Controlled Organisations 
20. The AT HOP open loop transition will provide valuable learnings and insights for Waka Kotahi and other public transport authorities around 
New Zealand. 
 






Board Meeting | 28 February 2023 
Agenda item no. 17 
Closed Session 
CONFIDENTIAL 
 
Ngā kiritaki / Customers 
21. AT HOP open loop will provide customers with easier payment options, which is aligned to the AT customer experience blueprint, and will 
reduce key customer pain points with the current AT HOP solution. Customer benefits associated with introducing open loop capability into 
AT HOP relate to removing barriers to using public transport and more convenient payment options. 
Ngā whaiwhakaaro haumaru me ngā whaiwhakaaro hauora / Health, safety and wellbeing considerations 
22. There are no direct Health and Safety impacts to be considered in relation to AT HOP open loop.  AT HOP open loop supports the principal of 
not leaving people behind because they do not have the current payment mechanism, however, so indirectly improves passenger safety. 
Ā muri ake nei / Next steps 
23. Commence a project to design and implement EMV open loop capability for AT with GTS/Thales which will be managed by AT separately to 
the NTS project but will be required to work in conjunction with the NTS Project for the Cubic and Waka Kotahi components. 
24. Engage with Waka Kotahi to progress the development of an integrated open loop capability, noting that this would not represent a transition 
under the P2 Agreement to the NTS by AT, but will fall under the NTS Governance for the Cubic and integration components. 
25. AT and Waka Kotahi will work together to develop a vendor management plan to communicate the strategic path to all vendors whilst 
ensuring tactical business continuity. 
Te pou whenua tuhinga / Document ownership 
Submitted by 
Chris Creighton 
Group Manager, Digital and Technology Delivery 
Recommended by 
Roger Jones 
Executive General Manager, Business Technology 
Approved for submission 
Mark Lambert 
Interim Chief Executive