2022/23 Annual Plan 
– Update to Councillors, 15 March 2022

Purpose of this session
To discuss with Council:

Budget and Rates confirmation

Public Engagement Plan 

Timeline / next steps

2022/23 Annual Plan Recap – where we got to
At the 9 December Council Workshop:

Councillors agreed on the proposed rates increase for next year of 13.14% (not 
using internal reserves, and using a 3% personnel allowance increase)

Officers established that a public consultation is not required for the 2022/23 
Annual Plan

However, we will “Inform” the public on some items that faced increased costs 
since our LTP was published:
▪ RiverLink project
▪ Bulk Water Supply network improvement projects (Kaitoke Flume Bridge replacement and 
Silverstream Pipe bridge replacement)

2021-31 LTP Year 2 work programme – “do-ability” overview

Business Groups reviewed the “do-ability” their 2021-31 LTP Year 2 (2022/23) work 
programmes, identifying savings and re-phasing opportunities

The outcome of the exercise resulted in an overall cost-neutral budget

Savings were identified in some areas; however, these were offset with cost increases 
in other areas. Instances of CAPEX re-phasing were lower than expected

The question of the “do-ability” of our 2022/23 CAPEX programme remains

2021-31 LTP Year 2 work programme – budget changes
Some examples of proposed budget changes that have contributed to budget neutrality:
Year 2 Budget Increases:
Year 2 Budget Decreases:
Environment and Flood Protection
Pinehaven FMP (brought forward 12 months)
Otaki FMP (deferred 12 months)
Bolstering science advice – freshwater and 
Ruamahanga Aerial Electromagnetic Survey 
wetlands  (new in Year 2)
(deferred 12 months)
Metlink Public Transport
Rollout of National Ticketing Solution
Expected cost reduction – RTI
Airport Bus Service
Bus Service enhancements, timetable changes
Public Transport On Demand Service

2022/23 Annual Plan Work Programme
Major CAPEX Projects
22/23
Environment and Flood Protection
Riverlink
$24m
Water Supply
Kaitoke Flume Seismic Upgrade
$13.7m
Te Marua Water Treatment Plant upgrade
$20.5m
Silverstream Pipebridge
$30.6m
Metlink Public Transport
National Ticketing Solution
$4.5m
Asset management – Rolling stock, Buildings and 
$16.1m
Structures
Real Time Information
$5.2m
BAU Capex - Station & Bus Stop Renewals
$6.0m

2022/23 AP Work Programme
Major OPEX Projects
22/23
Environment and Flood Protection
JFN: Wairarapa Moana, Fish Passage, Riparian Management 
$2.8m
Wairarapa Rivers
Ruamāhanga Aerial Survey (delayed in 21/22)
$1.5m
Metlink Public Transport
Electric Vehicle Programme
$9.1m
National Ticketing Solutions
$12.6m


2022/23 Draft Budget


Rates % increase 2021-31 LTP

Notable changes to the 2021-31 LTP year two and considered 
in last workshop
Description
Funding
Debt
Rates 
Rates 
Rates
$'000s
Impact
Impact 
Change
$'000s
%
2021-31 LTP
12.27%
Reduced Starting Debt
Debt
-60,000
-5,324
-3.35%
Increased Debt Servicing Charges
Rates
2,451
1.54%
Water Overhead Reduction
Rates
500
0.31%
Personnel Cost Increase 2% to 3% **
Rates
640
0.40%
Farebox Revenue Reduction (COVID-19)
Debt
7,350
132
0.07%
RiverLink
Debt
0
0
n/a
Operating Expenditure increases
Rates
3,019
1.90%
Proposed 2022/23 Annual Plan Rates Changes 
1,418
0.87%
13.14%
Impact

Notable changes to the 2021-31 LTP Year Two
Description
Funding
Debt
Rates 
Rates 
Rates
$'000s
Impact
Impact 
Change
$'000s
%
Proposed 2022/23 Annual Plan Rates Changes 
13.14%
Impact from December 9 workshop
Rates Remission
Rates
30
0.02%
3 Waters Reform
Rates
150
0.09%
Stadium Grant
Debt
1,500,000
24
0.02%
Proposed 2022/23 Annual Plan Rates Changes 
204
0.13%
13.27%
Impact


2021-31 LTP and Proposed 2022/23 Annual Plan




Estimated Rates Profile
Summary
Highest »
15.85% Year 3
Average » 
14.03% over first triennium
Trend » 
downward sloping profile

LTP Financial Tools Utilised
21/22 
22/23 
23/24 
24/25 
25/26
Year 1
Year 2
Year 3
Year 4
Year 5
Tools
Description
$'000s
$'000s
$'000s
$'000s
$'000s
Debt Funding - OPEX Public Transport Farebox revenue gap
-
7,350
-
Additional RiverLink funding
50,000
50,000
50,000
Stadium Grant
1,500


Debt Affordability Benchmarks LTP/AP


Debt affordability benchmarks LTP cont…

Questions for Councillors and other Business

Do you agree with the proposed Rates increase of 13.27% (using Internal Reserves)?

Ali to lead a brief discussion on the recommendation for the treatment on the Three 
Waters 
reform ”better off” funding in the Annual Plan.


Water Levy Update


Proposed 2022/23 Annual Plan Water Levy Increase

Water Levy – Outline
Wellington Water recommends Greater Wellington invests in the following key investment priorities:
Fund an average increase $2.1M for OPEX for each of the three-year supporting a step change increase in operational costs to look after existing 
infrastructure (and noting stimulus funding provides uplift in years 1 & 2)
Plus an Annual Plan change to include;
additional OPEX average increase of $0. 28m across years 2,3 & 4 to increase maintenance budget
Fund $167m CAPEX over 10 years for renewals to look after existing infrastructure.
Plus an Annual Plan change to include;
additional CAPEX of $37.0m across years 2, 3 & 4 for the Kaitoke Flume Bridge,
additional CAPEX of $51.7m across years 2, 3 & 4 for the Silverstream Pipe Bridge.
Include CAPEX funding of $13m over 10 years to extend the bulk water network. Phasing is linked with city council growth planning.
Fund $61m CAPEX over 10 years in activities that Reduce Water Consumption including;
$37M to increase Capacity at Te Marua WTP.

Plus an Annual Plan change to include;
additional CAPEX of $17.3m across years 2, 3 & 4 for the Te Marua WTP Capacity Upgrade.
Fund $150-$250K OPEX for carbon assessments
Fund the following in the first 5 years;
$4.4M for Waterloo WTP Ground Improvements,
$2.3M for Te Marua WTP Clarifier Seismic strengthening.



Public Engagement plan – March update

2022/23 Annual Plan Public Engagement
• We will carry out a public engagement prior to the finalisation and adoption of the Annual Plan 
• Our public engagement period will be late March – late April 2022
-
at the same time as the Revenue & Finance Policy and the Rates Remission Policy (Māori Freehold land) 
consultations are being undertaken 
• We will prepare two main pieces of collateral to support the public engagement campaign:
I.
Annual Plan Public Engagement “2-pager” – to provide a high-level view of key messages related 
to our 2022/23 Annual Plan, and other front of mind issues.
II.
Annual Plan Regional Factsheets – to provide a high-level view of significant 
projects/programmes that are planned for each area of our region for 2022/23.
• Our public engagement will be primarily digitally-focused,  utilising our owned channels (website and 
social media) and earned channels (media releases).
• An FAQ document will be available to Councillors and the Contact Centre when the public engagement 
period launches.

Annual Plan 2022/23 Public Engagement “2-pager”
Public Engagement “2-pager” – key messages

Significant LTP project/programme deliverables for 2022/23.

The projects/programmes that have changed since adoption of our 2021-31 LTP:
- RiverLink Project cost increase (indicative figure)
- Bulk Water Supply network improvement project cost increases; Silverstream Pipe Bridge and Kaitoke Flume 
Bridge (funded by Water levy). 
- Greater Wellington’s position on the Three Waters Reform (short statement).

Challenges we are keeping an eye on:
- our CAPEX delivery (raising project costs and supply chain challenges)
- Public Transport farebox revenue (due to a decrease in patronage)

Opportunities we are thinking about for our next LTP (2024-2034):
- Stadium funding and future support
- LGWM future funding changers as project details confirmed.

How we are acknowledging community feedback.




Annual Plan 2022/23 Factsheets by region
Factsheets – key messages

One for each of our five parts of the region (Wellington City, Porirua, Kāpiti, Hutt Valley, Wairarapa)

Snapshot of significant programmes or projects planned for the upcoming 2022/23 year

Rates breakdown table for each region

Revenue and Financing Policy & Rates Remission Policy 

Proposed changes to the Revenue and Financing policy do not impact the Annual Plan 
Budget or Total Rates Revenue for 2022/23. 

▪ However, the proportion of Targeted vs General Rates that ratepayers will see on their rates bill will 
change.

Proposed changes to the Rates Remission policy on Māori Freehold land will have 
minimal impact on the Annual Plan Budget for 2022/23. 

▪ The Annual Plan Budget has made a provision of $30,000 for the anticipated cost of anything remission 
applications made under this policy during 2022/23.

Questions/actions for Councillor decision?

Do you support the 2022/23 Annual Plan Public Engagement approach?

Do you support the key messages in our Public Engagement?

Next Steps – 2022/23 Annual Plan Key Deliverables
We are here
Sep 21
Oct 21
Nov 21
Dec 21
Jan 22
Feb 22
Mar 22
Apr 22
May 22
Jun 22
Business Initiatives/Budget Review Process
Preparing Annual Plan Public Engagement
Preparing final Annual Plan
Engagement period on 
Annual Plan
Public Consultation on 
RFP and RRP
28 Oct
9 Dec
17/18/19 May
30 Jun
Council 
Council 
17 Mar
R&FP Hearings
Adopt 2022/23 
15 Mar
Late Mar 
Workshop 
Workshop
Update 
and 
Annual Plan and 
Council Workshop 
Annual Plan
on AP 
on Draft AP 
report to 
Deliberations
set 2022/23 
for draft AP Budget 
Public 
process and 
Budget and 
Council on 
rates
update and on 
Engagement 
direction
consultation 
Annual Plan 
R&FP Adopted
Public Engagement 
commences
topics
Progress
RRP Adopted
method