This is an HTML version of an attachment to the Official Information request 'Waikato Expressway 110km/hr speed limit, environmental review, economic evaluation'.
   
50 Victoria Street 
Private Bag 6995 

Wellington 6141 
 
New Zealand 
 
T 64 4 894 5400 
F 64 4 894 6100 
 
www.nzta.govt.nz 
11 August 2022 
 
 
 
Jack Gibbons 
 
[FYI request #19864 email] 
 
 
 
 
REF: OIA-10505 
  
Dear Jack 
 
Request made under the Official Information Act 1982 
 
Thank you for your email of 9 July 2022 requesting information about the State Highway 1 (SH1) 
Waikato Expressway’s 110kmh speed limit under the Official Information Act 1982 (the Act). I will 
address each of your queries in turn.  
 
1)  The Economic Evaluation / Business Case. 
 
Waka Kotahi NZ Transport Agency undertakes a benefit cost analysis as part of the wider Speed and 
Infrastructure Programme, but not of speed reviews on their own. The Speed and Infrastructure 
Programme is not required to have individual project Benefit Cost Ratios, as the Programme is 
principle based and seeks to implement a balanced response to the risk in the transport system. 
Assurance of value for money is provided by the use of standard safety interventions and the 
programme-level economic assessment that demonstrates value for money.  
 
As such, I am refusing this part of your request under section 18(e) of the Act as the document al eged 
to contain the information requested does not exist.  
 
2)  The Environmental Impact Review (including co2e and other pollutant gas predictions). 
 
Please refer to Attachment 1.  
 
To provide further context, Waka Kotahi has information in the enclosed document on greenhouse gas 
(GHG) emission estimates for the 110km/h speed limit based on available traffic model ing data for 
2031 and 2041 for vehicles using the Tamahere to Hampton Downs section of the Waikato 
Expressway.  
 
The findings show that if we assume an increase in average fleet speed of 10km/h to 110km/h, this will 
result in a predicted increase of 4.34 percent and 3.77 percent in GHG emissions for years 2031 and 
2041 when compared to 100km/h.  
 
The main reason for the predicted increase in GHG emissions is due to light vehicles (for example, 
passenger vehicles) driving at 110km/h and operating beyond their optimal fuel efficiency of around 
75km/h. The reduction between 2041 when compared to 2031 is due to expected improvement in 
average fleet emissions over time.  
 
 
  


Waka Kotahi uses the Vehicle Emissions Prediction Model (VEPM) to estimate fleet average 
emissions from vehicles in the fleet, based on their average speed and typical road, traffic and 
operating conditions, such as weather. There are limitations of this approach given the complexity of 
calculating real world fuel consumption of vehicles as discussed above. 
 
Further information on the model can be found here: www.nzta.govt.nz/roads-and-rail/highways-
information-portal/technical-disciplines/air-quality-climate/planning-and-assessment/vehicle-emissions-
prediction-model/. 
 
3) The Road Safety Audit (including for walking and cycling). 
 
Please refer to Attachments 2 to 7.  
 
Certain information in Attachments 1, 2, 3, 5, 6 and 7 have been withheld under section 9(2)(a) of the 
Act to protect the privacy of non-Waka Kotahi natural persons, including that of deceased natural 
persons. 
 
With respect to the information that has been withheld, I do not consider there are any other factors 
which would render it desirable, in the public interest, to make the information available. 
 
Under section 28 of the Act, you have the right to ask the Ombudsman to review my decision to 
partially withhold this information. The contact details for the Ombudsman can be located at 
www.ombudsman.parliament.nz. 
 
If you would like to discuss this reply with Waka Kotahi, please contact the Speed and Infrastructure 
Programme team, by email to [email address]. 
 
Yours sincerely 
 
Mark Kinvig  
National Manager Infrastructure Delivery  
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 


OIA-10505 Document Schedule  
 
REF  Document name 
Date 
Information being withheld/reason 
for withholding 
1.    WEX Greenhouse Gas 
2 September 
Staff phone numbers are withheld 
Emission Change Rev 2 
2021 
under s9(2)(a) to protect their 
(100110km) 
privacy.  
2.    RSA SH1 WEX Detailed Design  7 October 
Third party names and contact 
- Designer, Safety Eng, Client 
2016 
details are withheld under s9(2)(a) to 
response 
protect their privacy. 
3.    WEX 110 Hampton Downs - 
29 September  Third party names and contact 
Design RSA - Designer, RSE, 
2021 
details are withheld under s9(2)(a) to 
Client Response 
protect their privacy. 
4.    WEX 110 Ohinewai - Design 
30 November 
N/A 
RSA and Memo - Designer, 
2020  
RSE, Client Response 
5.    WEX 110 Ohinewai - Post 
26 May 2022 
Third party names and contact 
Construction RSA - Designer 
details are withheld under s9(2)(a) to 
Response 
protect their privacy. 
6.    WEX 110 Ngāruawāhia - RSA 
2 March 2022  Third party names and contact 
details are withheld under s9(2)(a) to 
protect their privacy. 
7.    WEX 110 Tamahere - Design 
26 October 
Third party names and contact 
RSA - Designer, RSE, Client 
2021 
details are withheld under s9(2)(a) to 
Response 
protect their privacy.