Health and Safety Plan 
SMAG – Building Closure 
13 April 2018 
To ensure the safety of employees conducting core services in the museum building it is essential that we address the health and safety risks 
that this may include. 
Building Access 
First and foremost it is essential that any workers on site are authorised to be there by Manager - Building Assets and SMAG. All workers 
including contractors and visitors, on site are expected to sign in and out using the book located in the staffroom. All substantial movements 
around the museum building need to be noted on the whiteboard. 
It is expected all employees on site meet for a toolbox meeting every morning to discuss the plan for the day, and contractors visiting, any 
issues or suggestions. They must carry with them, at all times, a fully charged cell phone or communication device. 
Any access to the building outside 8:30am-5:30pm, the worker must have pre-approval from Manager-Building Assets and SMAG, notifying 
them on arrival and exit of the building. 
Emergency Preparedness 
The SMAG building evacuation plan must be reviewed to ensure the building can be evacuated in a timely and safe manner with the limited 
number of workers. All workers must be contactable and working in a way that ensures they have a safe passage out of the building at all 
times. All workers must be informed of any change in the evacuation plan and a drill must be conducted and reviewed by the end of May to 
ensure the effectiveness of this plan. 
The Council Health and Safety Advisor will ensure that all museum employees currently in the building are following the below plan, by first a 
group discussion and then fortnightly catch ups with employees to ensure it is running smoothly. 
Last Updated 3 May 2018 
 

All controls in the below risk management plan must be actioned before work commences in the SMAG building. 
Risk Management Plan 
Hazard 
Risk 
Controls 
Museum Building 
  Risk of falling objects during seismic 
  Location in Building 
 
activity. 
  All workers must primarily be 
 
working in the shared work 
  Risk of employees being difficult to 
space.  
locate/contact in an emergency.  
  All work undertaken in all other 
 
areas of the museum building 
 
will need to be conducted with a 
 
buddy if possible. If not 
 
practicable another member of 
staff must know where you are 
going and what you anticipate 
doing. 
  All substantial movements/work 
around the museum needs to be 
noted on the whiteboard in the 
staffroom. 
  Ensure all areas of work have a 
secure desk/table that can 
provide cover during a seismic 
event. 
 
  PPE  
  All workers on site must wear 
closed toe footwear. 
  All workers conducting work the 
museum must wear a hi vis vest. 
  There will be a plan created to 
move all items that are above 
head level down. In the meantime 
an inspection must be conducted 
Last Updated 3 May 2018 
 

checking that these items are not 
at risk of falling. 
  Administration Controls 
  Management is to ensure that all 
workers on site are aware of and 
have practiced the emergency 
procedures. - Drill to be 
conducted next week. 
 
High Risk Work 
  Risk of fall from height  
  All high risk work will be prohibited 
 
unless authorised by Management. If 
 
authorised then this will require a HS 
 
plan that contains the use of a spotter 
and considers controls in the case of 
seismic activity. 
  Any work plans will be discussed at 
the morning meeting to ensure there is 
a plan in place for any other high risk 
work. 
 
Visiting lenders and artists 
Any works currently installed in SMAG galleries will be deinstalled by the SMAG team, it will then be arranged to meet any lenders or artists at 
the front door for handing over. 
Contractors 
Any contractors working on site will be met at the front or side door by the nominated SMAG employee. The contractor will then be inducted 
and accompanied to the area they are working in. Contractors will have limited access to floors/galleries and be accompanied at all times. 
 
 
Last Updated 3 May 2018 
 

ACKNOWLEDGEMENT 
 
 
 
 
 
 
 
I ______________________________________ acknowledge that I have read and understood the Southland Museum and Art Gallery Health and Safety 
Plan. I will abide by this plan and follow any reasonable instruction given by Southland Museum and Art Gallery Management. 
 
I understand that this plan may be updated from time to time and that it is my responsibility to be engaged in health and safety management and to keep up to 
date with these changes. 
 
 
 
  ________________________________  
 __________________   
Signed  
 
 
 
 
 
Date 
Last Updated 3 May 2018