Plant & Food Research – Asbestos Investigation 
 
Planned Method of Investigation 
 
1.  Aim 
Aim: To understand the facts around the recent asbestos removal operation at 120 Mt Albert Road site and the subsequent rediscovery of further 
asbestos after clearance and sign-off, resulting in potential exposure of staff, contractors & visitors to harmful dust. 
Objectives: 
To obtain statements from key personnel in respect of Asbestos operations and management including the removal process  
To collate all available documentation for review and corroboration with statements 
To inform H&S decision making to ensure a safe working environment 
To provide confidence that Plant & Food Research (PFR) response was appropriate  
To minimise further disruption to construction and daily operations on site 
To minimise further cost to all parties 
To report back to Plant & Food Research with findings 
 
©  Copyright  TCIL  2017.  WARNING.  Unauthorised  copying,  disclosure  or  distribution  of  this  publication  is  strictly  prohibited.  It  is  restricted  to  approved  TCIL  clients  only  and  their  authorised 
representatives. Unauthorised possession, copying or distribution may make offenders subject to legal action relating to offences regarding unlawful possession of unauthorized information and/or 
intellectual property. If you are not the intended recipient of this publication, or do not have authorisation from TCIL to view it, or have received this publication in error, you must not peruse, use, pass 
or copy this publication or any of its contents. 
 


 
 
2.  Situation 
 
Background: 
The premises at 118-120 Mt Albert Road, Auckland is owned by The New Zealand Institute for Plant and Food Research Limited (PFR).  
Plant & Food Research is a New Zealand government-owned Crown Research Institute. 
The  building  was  constructed  in  1972  at  a  time  when  asbestos  was  commonly  used  in  construction  processes.  Subsequent  legislation  has  necessitated 
programmes of remediation, control and removal of Asbestos Containing Materials (ACMs). 
As a result of this PFR commissioned an initial Asbestos Assessment which was conducted by 
 which concluded that the 
overall risk due to the  presence of asbestos was  at a  medium  level. The  document also included a low risk rating for the  plant  room  specifically  due  to 
‘reasonably effective encapsulation’. This assessment identified the asbestos as Chrysotile (white asbestos) which is the least harmful form of ACM. 
Some asbestos removal and encapsulation work was conducted in 
 which included the Cunningham building and server 
room. At this time, 
 were directly contracted to PFR. 
A more comprehensive Asbestos refurbishment survey was authorised by PFR, conducted 
 and published in 

This survey utilised visual identification, physical sampling and swab testing to ascertain the presence of ACM. 
It was identified that the majority of the Asbestos was contained on the underside of the roof at level 6 of the Hamilton building and in the spandrels at each 
floor. Spray coating and associated debris was evident within the building and was assumed to be present beneath floor coverings.  
Areas within the building (such as pipework gaskets & ceiling voids) were not accessible during the asbestos survey however it was assumed that ACM was 
present in these locations. 
 
©  Copyright  TCIL  2017.  WARNING.  Unauthorised  copying,  disclosure  or  distribution  of  this  publication  is  strictly  prohibited.  It  is  restricted  to  approved  TCIL  clients  only  and  their  authorised 
representatives. Unauthorised possession, copying or distribution may make offenders subject to legal action relating to offences regarding unlawful possession of unauthorized information and/or 
intellectual property. If you are not the intended recipient of this publication, or do not have authorisation from TCIL to view it, or have received this publication in error, you must not peruse, use, pass 
or copy this publication or any of its contents. 
 


 
This survey confirmed the presence of Chrysotile throughout all levels of the Hamilton building and strongly presumed that Crocidolite (blue asbestos), which 
is the highest risk ACM, was present in a number of areas. 
The main construction contract was commenced 
. Aspects of this contract included removal of asbestos from the Hamilton 
building & the annex plant room. Excluded from this contract were the lift shafts in the Hamilton building and 1st & 2nd floors (including the roof) of the 
annex building – this was a budgetary decision. 
 were engaged 
 for the removal of ACM from the in-scope areas. 
During the demolition phase, air-testing was conducted on a daily basis to identify the presence of asbestos. All air monitoring results of a positive nature 
(which may include other airborne fibres) are sent away for specialist testing. Any tests that have indicated the presence of asbestos during the construction 
phase, of which only one has been confirmed, have proven to be Chrysolite. 
The order of asbestos removal conducted 
 commenced with the Annex Plant Room and then worked their way down from the 7th 
floor of the Hamilton building.  The process was one of containing the relevant floor of operation, removal of asbestos, followed by clean and clearance. This 
process was required to satisfy PFR business continuity within daily operations. 
, a visual inspection report was completed 
 in respect of the Annex Plant Room. Swab tests taken on 1st & 2nd July in 
the South end of the Plant Room initially tested positive for Amosite (brown asbestos), as did a fire hose reel on the West side (Chrysotile) and the North East 
pipes tested negative. On 6th July, repeat tests in the same areas detected no asbestos. Reasons for the conflicting test results are not yet clear. 
Following this testing process, the Annex Plant Room was cleared 
 however additional comments were referred to with regard to the porous 
nature of the concrete and potential for asbestos fibres to remain ingrained and between the cinder concrete blocks. Recommendations were made in respect 
of a precautionary approach to further work in this area. Based on this clearance, however,
 authorised further access to the Plant Room. 
Both operational and construction work has recommenced in the Plant Room post 1st July 2015. This includes removal and replacement of plant equipment, 
installation of hanging brackets, piping, new gib walls and, significantly, the installation of two galvanised flues within the riser up to the roof of the annex. 
 
©  Copyright  TCIL  2017.  WARNING.  Unauthorised  copying,  disclosure  or  distribution  of  this  publication  is  strictly  prohibited.  It  is  restricted  to  approved  TCIL  clients  only  and  their  authorised 
representatives. Unauthorised possession, copying or distribution may make offenders subject to legal action relating to offences regarding unlawful possession of unauthorized information and/or 
intellectual property. If you are not the intended recipient of this publication, or do not have authorisation from TCIL to view it, or have received this publication in error, you must not peruse, use, pass 
or copy this publication or any of its contents. 
 


 
 
Incident: 
The construction project then continues to schedule until 17th January 2018. 
On this date,
 staff were directed by PFR to commence a further asbestos management survey for seemingly two purposes: the scoping of new work 
and reassurance of the newly appointed PFR Site Managers concerns around the amount of asbestos in the Plant Room. 
The
 representative subsequently conducted a number of swab tests in the Plant Room & tunnel (connecting Plant room to Cunningham building & 
Ground Floor of the Hamilton building) which proved to be positive for Chrysotile, one confirmed result for Crocidolite, and one presumed positive result for 
Crocidolite.  
On 18th January 2018, access to the Plant room was restricted and Worksafe New Zealand notified. 
As a result of these positive tests, further monitoring has been conducted in the East & West Risers and Ground Floor Lobby through swab testing. In the 
Western Riser, asbestos was found on level 4 & 6. No asbestos was found on other floors of this riser. 
The lobby has since been cleaned and cleared and reopened to general staff access.  
Subsequent testing has also found dormant asbestos fibre in the lift shaft but this is not airborne and therefore presents a low risk. 
The Plant room remains under restricted access and subject of a WorkSafe notice. 
 
 
 
 
©  Copyright  TCIL  2017.  WARNING.  Unauthorised  copying,  disclosure  or  distribution  of  this  publication  is  strictly  prohibited.  It  is  restricted  to  approved  TCIL  clients  only  and  their  authorised 
representatives. Unauthorised possession, copying or distribution may make offenders subject to legal action relating to offences regarding unlawful possession of unauthorized information and/or 
intellectual property. If you are not the intended recipient of this publication, or do not have authorisation from TCIL to view it, or have received this publication in error, you must not peruse, use, pass 
or copy this publication or any of its contents. 
 


 
Focus: 
As a result of the above background and with the information currently available, it is anticipated that the focus of this investigation will be directed towards 
the possible sources of contamination in the plant room. These include, but are not limited to:  
•  the clean & clear process 
•  the effectiveness of the asbestos encapsulation process 
•  subsequent construction work within the Plant Room: 
o  the installation of hanging rod attachments  
o  riser contamination during the flue installation  
•  possible contamination of the tunnel during the removal of the final spandrel  
 
In order to achieve this, key internal staff have been initially interviewed and some key documents obtained. It is evident that there is large volume of 
information yet to be obtained and reviewed in order to fully understand the process to date and draw any conclusions around causes or liability. 
It is anticipated that a timeline of events leading up to the discovery of further asbestos will assist this understanding along with an association chart of 
entities involved in asbestos operations. It is understood that this is being prepared in draft form by PFR staff. 
Next Steps: 
The first phase has enabled us to determine the key people pertinent to the investigation and where the necessary documents can be sourced from. 
 
 
 
 
 
©  Copyright  TCIL  2017.  WARNING.  Unauthorised  copying,  disclosure  or  distribution  of  this  publication  is  strictly  prohibited.  It  is  restricted  to  approved  TCIL  clients  only  and  their  authorised 
representatives. Unauthorised possession, copying or distribution may make offenders subject to legal action relating to offences regarding unlawful possession of unauthorized information and/or 
intellectual property. If you are not the intended recipient of this publication, or do not have authorisation from TCIL to view it, or have received this publication in error, you must not peruse, use, pass 
or copy this publication or any of its contents. 
 


 
 
3.  Method  
 
3.1  Management Team  
 
Permanent Members 
 

 
T+C 
Plant & Food Research 
 - 

 
 -
 
  
 - I
 
 
Co-Opted Members  
 
 
T+C 
Plant & Food Research 
 – 
 

Nil at this stage 
 
 
 
 
 
 
 
 
 
 
 
 

 
©  Copyright  TCIL  2017.  WARNING.  Unauthorised  copying,  disclosure  or  distribution  of  this  publication  is  strictly  prohibited.  It  is  restricted  to  approved  TCIL  clients  only  and  their  authorised 
representatives. Unauthorised possession, copying or distribution may make offenders subject to legal action relating to offences regarding unlawful possession of unauthorized information and/or 
intellectual property. If you are not the intended recipient of this publication, or do not have authorisation from TCIL to view it, or have received this publication in error, you must not peruse, use, pass 
or copy this publication or any of its contents. 
 


 
 
3.2 Set up of investigation & Enquiry Management 
 
3.2.1 Responsibilities  
•  Client communication – 
 
•  Document / Exhibit Management – 
 
•  Actions Management – 
 
•  Identify ingredients of offences (if any) – 
 
•  Produce precis of evidence (review of evidence relevant to ingredients) – 
 
•  Consider aspects of enquiry: Criminal, Civil, Employment – 
 
•  Establish modus operandi (MO) and identify any breaches of legislation – 
 
•  Timing of investigation – 
 
•  Budget and Costs –
  
 
3.2.2 Communication Strategy 
•  Single point of contact (SPOC) - 
 
 
•  Internal Comms  
o  regular contact including conference calls between management team to ensure progress is shared and lines of enquiry prioritised 
o  Emails and phone calls between specific team members as required 
o  Meetings to be scheduled as required 
 
•  External Comms – PFR managing (e.g. ESR, SMT, Shareholding Ministers, local businesses if appropriate) 
 
 
©  Copyright  TCIL  2017.  WARNING.  Unauthorised  copying,  disclosure  or  distribution  of  this  publication  is  strictly  prohibited.  It  is  restricted  to  approved  TCIL  clients  only  and  their  authorised 
representatives. Unauthorised possession, copying or distribution may make offenders subject to legal action relating to offences regarding unlawful possession of unauthorized information and/or 
intellectual property. If you are not the intended recipient of this publication, or do not have authorisation from TCIL to view it, or have received this publication in error, you must not peruse, use, pass 
or copy this publication or any of its contents. 
 


 
 
 

3.2.3 Legality Strategy  
•  Consideration given to ensure that all aspects of the enquiry are within legal guidelines of NZ legislation. 
•  Chapman Tripp to be kept informed by PFR 
   
 
 
 
3.2.5 Property Exhibit Strategy  
•  N/A 
 
 
 
 
 
 
 
 
 
 

 
©  Copyright  TCIL  2017.  WARNING.  Unauthorised  copying,  disclosure  or  distribution  of  this  publication  is  strictly  prohibited.  It  is  restricted  to  approved  TCIL  clients  only  and  their  authorised 
representatives. Unauthorised possession, copying or distribution may make offenders subject to legal action relating to offences regarding unlawful possession of unauthorized information and/or 
intellectual property. If you are not the intended recipient of this publication, or do not have authorisation from TCIL to view it, or have received this publication in error, you must not peruse, use, pass 
or copy this publication or any of its contents. 
 


 
 
3.2.6 Analyst Strategy 
• 
 
 
 
 
•  To generate a comprehensive timeline of events and decisions in order to identify any gaps or misunderstandings throughout the project. 
 
•  An Association chart of entities involved in asbestos operations will be compiled to aid understanding of relevant contractual relationships. 
 
 
 

  
 
 
 
 
 
 
 
 
 
 
 
 
 

 
©  Copyright  TCIL  2017.  WARNING.  Unauthorised  copying,  disclosure  or  distribution  of  this  publication  is  strictly  prohibited.  It  is  restricted  to  approved  TCIL  clients  only  and  their  authorised 
representatives. Unauthorised possession, copying or distribution may make offenders subject to legal action relating to offences regarding unlawful possession of unauthorized information and/or 
intellectual property. If you are not the intended recipient of this publication, or do not have authorisation from TCIL to view it, or have received this publication in error, you must not peruse, use, pass 
or copy this publication or any of its contents. 
 


 
 
 
3.2.8 Interview Strategy  
•  Interviews will be conducted at the relevant times subject to the investigation process developing 
•  Appropriate interview locations and interviewers are to be selected 
 
Witnesses 

Status 
Comments 
 
▪  Initial interview conducted 
Can provide background and insight re the Asbestos 
 
▪  Ongoing assistance 
Management Plan and assistance with obtaining 
 
 
documents 
 
▪  Initial interview conducted 
 
  
▪  Ongoing assistance re provision of documents & 
 
 
timeline of events 
Can provide overall understanding of key contractors and 
▪  Evidential statement may be required 
their roles 
 
▪  Initial interview conducted 
Initiated further asbestos survey which triggered the 

▪  Ongoing assistance 
discovery and subsequent response 
PFR 
▪  Evidential statement likely 
 
▪  Interview scheduled 23 Feb 2018 
 involved directly in the project 

 
 
▪  Initial interview conducted 
Slightly removed from the asbestos management project 
 
▪  Ongoing assistance re incident management 
however 
 has been involved in incident coordination 
PFR 
 
 
 
©  Copyright  TCIL  2017.  WARNING.  Unauthorised  copying,  disclosure  or  distribution  of  this  publication  is  strictly  prohibited.  It  is  restricted  to  approved  TCIL  clients  only  and  their  authorised 
representatives. Unauthorised possession, copying or distribution may make offenders subject to legal action relating to offences regarding unlawful possession of unauthorized information and/or 
intellectual property. If you are not the intended recipient of this publication, or do not have authorisation from TCIL to view it, or have received this publication in error, you must not peruse, use, pass 
or copy this publication or any of its contents. 
 


 
 
▪  Initial interview conducted 
Long term involvement with the project 
Project Manager 
▪  Ongoing assistance re provision of documents & 
Awaiting scope of work & tender documents as 
 
general clarity re process 
requested 
▪  Evidential statement may be required 
 
▪  Interview scheduled for 21 Feb but now 
Asbestos specialist – expert knowledge 
Independent Asbestos Expert 
postponed to 26 Feb 
 
 
▪  Relationship established 
 
 
▪  Interview to be scheduled in Phase 2 
 
▪  Relationship established 
 
Project Manager 
▪  Interview to be scheduled in Phase 2 
 
 
▪  Initial interview conducted 
Long term staff member assisting with information 
Maintenance Team 
▪  Ongoing assistance 
provision 
PFR 
 
 
▪  Not yet interviewed 
 
Electrician 
 
 
▪  Not yet interviewed 
Overview re operational decisions 
Group Manager Assets & Services 
PFR 
 
▪  Not yet interviewed 
 
 
 
 
 
©  Copyright  TCIL  2017.  WARNING.  Unauthorised  copying,  disclosure  or  distribution  of  this  publication  is  strictly  prohibited.  It  is  restricted  to  approved  TCIL  clients  only  and  their  authorised 
representatives. Unauthorised possession, copying or distribution may make offenders subject to legal action relating to offences regarding unlawful possession of unauthorized information and/or 
intellectual property. If you are not the intended recipient of this publication, or do not have authorisation from TCIL to view it, or have received this publication in error, you must not peruse, use, pass 
or copy this publication or any of its contents. 
 


 
3.2.9 Sensitive Issues  
•  PSA may request input and reporting – PFR to handle this 
•  Parallel enquiries with other ongoing investigations, i.e.
 currently conducting their own 
•  Reluctance of existing staff to commit to written statements for fear of consequences / employment issues (involve HR) 
•  Lack of willingness of staff to proactively provide information – this has improved with rapport building 
•  Possible collection of unrelated employment (?) matters during forensic examination of emails 
3.2.10 Media Strategy  
Managed by PFR  
•  PFR Comms to be updated 
 
•  preparation of a media holding statement advised 
•  preparation for OIA requests advised 
 
 3.2.11 Action Points for Future Consideration  
 Action schedule being maintained 
 
   
 
 
 

 
©  Copyright  TCIL  2017.  WARNING.  Unauthorised  copying,  disclosure  or  distribution  of  this  publication  is  strictly  prohibited.  It  is  restricted  to  approved  TCIL  clients  only  and  their  authorised 
representatives. Unauthorised possession, copying or distribution may make offenders subject to legal action relating to offences regarding unlawful possession of unauthorized information and/or 
intellectual property. If you are not the intended recipient of this publication, or do not have authorisation from TCIL to view it, or have received this publication in error, you must not peruse, use, pass 
or copy this publication or any of its contents. 
 


 
 
 
 
 

4.  Conclusion  
This above investigation plan has been supplied to Plant & Food Research in order to give an overview of the investigation process in order to appreciate 
the course that this enquiry is taking. T+C use this format as an investigative tool in order to achieve their aim. Significant emphasis is being placed upon 
document collation & review and any evidence this may provide to the investigation. 
 
©  Copyright  TCIL  2017.  WARNING.  Unauthorised  copying,  disclosure  or  distribution  of  this  publication  is  strictly  prohibited.  It  is  restricted  to  approved  TCIL  clients  only  and  their  authorised 
representatives. Unauthorised possession, copying or distribution may make offenders subject to legal action relating to offences regarding unlawful possession of unauthorized information and/or 
intellectual property. If you are not the intended recipient of this publication, or do not have authorisation from TCIL to view it, or have received this publication in error, you must not peruse, use, pass 
or copy this publication or any of its contents.