Standard equipment list – TYPE 3 Appliance
Standard equipment list – NZFS Type 3 (FL3-1 SCc)
The requirement to carry optional items is determined by Area management.
To prevent overloading do not exceed maximum locker weight.
Related documents
E1-4 equipment deployment schedule
FL3-1 Appliance equipment requirements policy.
Extinguishers
DP 9 kg or 2 x 4.5
1
CO² 3 kg
1
Foam
Class B foam concentrate in 25 litre drums
2
Class A Foam concentrate 60 litres in internal tank
(older appliances may have 3 x 25 litre containers)
3
Ladders (older appliances may have a wooden rescue ladder and an access ladder)
Short extension access ladder 3.6 metre or multi purpose access ladder
1
AS Rescue ladder
1
First aid/rescue
First aid kit
1
Manual resuscitator
1
Gloves - barrier (box)
1
Defibrillator (optional)
1
Oxygen therapy
1
Safety
IGC radios
4
Lightweight helmets (optional)
4
Dust masks - P2 (box)
1
Cordon tape (roll)
1
Nominal roll tally
1
Earplugs (box)
1
Jerkins
7
under the Official Information Act
Torches
4
Gloves - heat resist (pair)
1
Incident command board (optional)
1
Goggles
4
Water bottle (750ml)
8
Road cones (may be ridged or collapsible)
8
Small gear
Sledgehammer
1
Released
Bolt cutter
1
Wrecking bar/hooligan tool
1
Axe large
1
Axe small
1
Spade/shovel
1
Toolbox containing small tools
1
Claw hammer/nails
1
NZFS National Operations
Page 1 of 4
FL3-1 SCc Type 3 operational equipment list August 2014
Standard equipment list – TYPE 3 Appliance
Lines
Lowering line (roof kit)
1
G P lines (20-30m)
2
Bucket line
1
Line rescue pack (optional)
1
Portable equipment
Portable generator (optional)
1
Lighting accessories (optional)
1
Portable water pump (optional)
1
PPV fan (optional)
1
Act
Fuel cans 9 litre as required
1 or more
Waterway
Nozzles controlled
4
Foam nozzles
1
Branch straight 25 mm nozzle
1
Suction strainer
1
Suction basket strainer
1
Suction spanners
2
Standpipes – screw down
2
Information
Key and bar
1
Deck monitor ground base
1
Collecting breeching
1
Dividing breeching
1
Female/female adaptor
1
Male/male adaptor
1
Official
Hose ramps (90 mm)
2
Hose reel spanners
2
the
Ejector pump type B (optional)
1
Ejector pump water dragon (optional)
1
Breathing apparatus
Complete sets
4
Spare cylinders
4
under
Main guide line
1
Stage 1 control board
1
ECO jerkin
1
Stage 2 control board (optional)
1
Salvage
Ceiling hook
1
Salvage sheets
4
Mop
1
Released
Bucket
1
Broom
1
Squeegee
1
NZFS National Operations
Page 2 of 4
FL3-1 SCc Type 3 operational equipment list August 2014
Standard equipment list – TYPE 3 Appliance
Hazardous substances
Information board
1
Splash suit
4
HazMat spill kit
1
Emergency decontamination kit (1-pump station appliance carries 4 kits; 2-
2 or 4
pump station appliances carry 2 kits)
Disposal packs - 2 bags with labels and ties
4
Forestry
Forestry pack (optional)
1
Forestry nozzle (optional)
1
Dividing breeching (optional)
1
Act
Hose CAFS appliances may carry 41 mm hose
Delivery hose sets (3 x 70mm, 1 x 45mm)
2
90mm flaked feeders
6
70mm coiled
4
45mm coiled
2
100mm suction hose
4
Portable cutting equipment
Chainsaw and accessories (optional)
1
Information
Disc cutter saw and accessories (optional)
1
Reciprocating saw (optional)
1
Skill saw (optional)
1
Rescue equipment (if designated PRT)
Motorised hydraulic power unit
1
Hydraulic hoses 3 pairs
3
Official
Secondary power unit (optional)
1
Cutters
1
Spreaders
1
the
Extension rams
3
Airbags
2
Airbag control valves
2
Engineers toolkit
1
Portable winch
1
under
Sill plate
1
Step chocks
4
Cribbing varies
Tool stage sheet (2m x 2m)
1
Glass bag and kit
1
Soft and hard patient protection
4
Safety glasses (full wrap)
4
Released
Large crowbars
1
Assorted strops and chains
4
Pedal cutter (optional)
1
Basket stretcher
1
Entrenching tools
2
25T Bottle jacks (optional)
1
NZFS National Operations
Page 3 of 4
FL3-1 SCc Type 3 operational equipment list August 2014
Standard equipment list – TYPE 3 Appliance
Record of amendments
Date
Brief description of amendment
April 2014 Addition of "Jerkins" to the list.
July 2014 Changed "Rope rescue" to "Line rescue".
July 2014 Added "IGC radios" and "HazMat spill kit" to the list.
Aug 2014 "Optional" added after "Stage 2 control board".
Aug 2014 "3 x 70mm, 1 x 45mm flaked deliveries" changed to " Delivery hose sets (3 x 70mm, 1 x 45mm)".
Number of 90mm flaked feeders increased to 6.
Act
Information
Official
the
under
Released
NZFS National Operations
Page 4 of 4
FL3-1 SCc Type 3 operational equipment list August 2014