This is an HTML version of an attachment to the Official Information request 'Kennedy Good and Melling Bridge closures, 20 April 2026'.


 
6 July 2026 
 
Luke Howison 
[FYI request #34877 email] 
 
 
Tēnā koe Luke, 
 
Request for Information – Local Government Official Information and Meetings 
Act (LGOIMA) 1987 
 
We refer to your official information request dated 8 June 2026, seeking 
information relating to the decision to close Kennedy Good Bridge and Mel ing 
Bridge on the evening of 20 April 2026. Specifical y, you requested: 
 
1.  Any written criteria, protocols, or thresholds used to determine when these 
bridges should be closed due to river levels or flood conditions, including 
any formal trigger points such as river gauge heights, flow rates 
(cumecs), or freeboard margins. 

2.  The river gauge readings and or flow rate data recorded at the time the 
decision to close the bridges was made, the anticipated readings given 
the forecast rainfal , and the readings at the time they were reopened. 

3.  Any internal communications between Hutt City Council staff and or 
Greater Wel ington Regional Council staff relating to the decision to close 
the bridges on that evening. 

4.  Any engineering assessments or advice provided to the Lower Hutt 
Control er prior to the closure decision. 
5.  Records of the post-closure engineering inspection carried out on the 
morning of 21 April 2026, including the findings that led to the bridges 
being reopened. 

6.  Data on previous occasions when Hutt River levels reached or exceeded 
those recorded on 20 April 2026, and whether bridge closures were 
implemented on those occasions.  

 
30 Laings Road, Lower Hutt 
Private Bag 31912, Lower Hutt 5040 
/huttcitycouncil 
0800 488 824 
 
[email address] 
www.huttcity.govt.nz 
▲The pattern at the top of this page is inspired by the natural landforms, hil s, river, and coastline surrounding Lower Hutt. It represents our people, our place, and our home. 

Answer: 
 
Please refer to Appendix 1, which lists the documents in scope of your request 
and Council’s decision on their release. Copies of the documents marked for 
release are enclosed. Please note, some information has been withheld under 
the fol owing provisions of the LGOIMA: 
 
•  Section 7(2)(a), to protect the privacy of natural persons, including that of 
deceased natural persons, and 
•  Section 7(2)(j), to prevent the disclosure or use of official information for 
improper gain or improper advantage. 
 
In response to your questions about the criteria and decision-making for closing 
Kennedy Good Bridge and Mel ing Bridge, the relevant operational guidance is 
set out in the Hutt River Catchment Guide and the Hutt City Council Local 
Emergency Response Plan. These documents provide a framework for 
responding to flooding events, including when bridge closures should be 
considered. They do not prescribe fixed trigger points requiring closure at a 
specific river level. Instead, they describe indicative river levels and associated 
impacts, with decisions made based on the overall risk picture at the time. 
 
The Catchment Guide indicates that at approximately 4.75 metres at the 
Birchville river gauge, bridge closures should be considered. At higher levels, 
additional risks are identified, including potential impacts from debris and scour 
affecting bridge structures and surrounding transport connections. The Local 
Emergency Response Plan supports this by outlining the broader emergency 
management approach, including movement control, road closures, and 
coordination between agencies. 
 
On the evening of 20 April 2026, Emergency Operations Centre records show that 
the Hutt River peak was forecast to reach approximately 4.7 to 5.4 metres at 
Birchvil e between midnight and 2am. This forecast range aligned with the level 
at which bridge closures are considered. The decision to close Kennedy Good 
Bridge and Mel ing Bridge was made in the context of this forecast, alongside 
other factors including a regional state of emergency, a Red Heavy Rain Warning, 
elevated river levels, the anticipated overnight timing of peak flows, existing and 
 
P.2 

forecast surface flooding, and the potential for debris and scour to affect bridge 
safety. Consideration was also given to maintaining safe access for emergency 
services and avoiding the risk of communities becoming isolated if conditions 
worsened. 
 
The situation reports, status report, and event log included with this response 
record that the bridges were closed at approximately 8pm on 20 April 2026. 
These records also show that the bridges were initial y expected to be 
reassessed the fol owing morning. However, river levels peaked lower than 
forecast and began to recede earlier than anticipated. As conditions improved 
and the overall risk reduced, the bridges were reopened from approximately 
3:40am on 21 April 2026. This sequence of decisions is reflected consistently 
across the operational records and timeline documents provided. 
 
Information about river levels during the event is included within the released 
situation reports, status report, and event log. Greater Wel ington Regional 
Council is the authoritative source for river gauge and flow data, and this 
information is publicly available through its environmental data services. 
 
In relation to engineering advice, no separate formal engineering assessment 
was carried out prior to the bridges being reopened. While initial planning 
anticipated a morning inspection, this did not occur because river levels did not 
reach levels that would warrant a structural assessment. The decision to reopen 
the bridges was made through the Emergency Operations Centre based on the 
observed reduction in river levels and the associated decrease in risk. 
 
Internal communications and operational records relevant to the decision-
making process are included in the documents provided. The decision to close 
the bridges was made within the Emergency Operations Centre during activation 
of the response and was primarily the result of real-time operational discussions 
rather than formal written correspondence. As such, the contemporaneous 
record of decision-making is captured in situation reports, status reports, the 
event log, and supporting operational material, rather than through email 
correspondence. 
 
 
P.3 


There is no single bridge-specific protocol requiring these bridges to be closed 
at a fixed river level. The decision on this occasion was a precautionary 
operational response taking into account forecast conditions and the broader 
emergency management framework in place at the time, and with consideration 
of public safety front of mind. 
 
In response to your question about previous comparable events, relevant 
information held by Council is included in the documents provided. Greater 
Wellington Regional Council maintains the authoritative river level and flow 
datasets, which are publicly available atLive Data Viewer | Environmental Data 
Dashboard
,
 and may be able to provide more comprehensive information if 
required. 
 
You have the right to seek an investigation and review by the Ombudsman of this 
response. Information about how to make a complaint is available at: Office of 
the Ombudsman - Complaints
,
 or freephone 0800 802 602. 
 
Please note that this response to your information request may be published on 
Hutt City Council’s website: Proactive releases - Hutt City Council. 
 
 
Ngā mihi nui 
 
 
 
 
Rebekah van der Splinter 
Senior Advisor, Official Information and Privacy 
 

 
 
P.4 

Appendix 1: Documents for release 
 
Number  Date 
Document Type 
Title/Subject Line 
Redaction Grounds 

20 April 2026  Situation Report 
Severe Weather Event 
Released to you in ful . 

20 April 2026  Situation Report 
Severe Weather Event (1) 
Released to you in ful . 

20 April 2026  Situation Report 
Severe Weather Event (2) 
Released to you in ful . 
Social Messaging 

21 April 2026 
No title 
Released to you in ful . 
Excerpts 
Severe weather event (rainfall 

21 April 2026 
Status Report 
Released to you in ful . 
thunderstorm) 
Some information has been 

Not dated 
Document 
Flood action matrix 
withheld under s7(2)(j). 

Not dated 
Document 
Hutt River Catchment Guide 
Released to you in ful . 
Some information has been 
Activation timeline of key 

Not dated 
Spreadsheet 
withheld under s7(2)(a) and 
events 
s7(2)(j). 
Some information has been 

Not dated 
Spreadsheet 
Event Log 
withheld under s7(2)(a) and 
s7(2)(j). 
Severe Weather Event key event  Some information has been 
10 
Not dated 
Spreadsheet 
timeline 
withheld under s7(2)(a). 
 
 
P.5