This is an HTML version of an attachment to the Official Information request 'Documents relating to cycle work as part of connected communities'.

 
 
 
 
Aurecon New Zealand Limited 
T  +64 9 520 6019 
Level 3, Te Tihi  
E  [email address] 
110 Carlton Gore Road, 
W  aurecongroup.com 
 
Newmarket, Auckland 1023 
PO Box 9762, Newmarket, Auckland 
1149, New Zealand 
New Zealand 
Memorandum
 
 
 
 
 
To 
Auckland Transport 
From 
Aurecon, Steve Dudley 
Copy 
 
Reference 
530992 
Date 
2026-06-22 
Pages  
(including this page) 
24 
Subject 
Wellesley Street Cycle Connection Memo 

Background 
Wel esley Street has been identified in the City Centre Masterplan (CCMP) and al  supporting transport 
planning work as a major bus corridor and part of a critical east-west traffic route across the city centre. 
It has also been identified in published planning documents as the preferred route for a “Major” (second 
tier) east-west cycling connection between the Grafton Gul y  Cycleway and Te  Hā Noa.  As a result, 
there are a number of conflicts in the al ocation of space for various modes in this corridor.  
A cycleway on Wellesley Street between the Grafton Gully Cycleway and the intersection with Princes 
Street  has  been  proposed  as  part  of  the  Auckland  Network  Optimisation  (ANO)  programme.  The 
decision to proceed with this cycleway and the onward connection to Te Hā Noa needs to be considered 
in the context of the role of Wel esley Street as a critical public transport and traffic route. 
In this regard, there are related issues that will influence the cycle route choice and function of Wel esley 
Street: 
◼  There is a need to advise NZTA on whether to proceed with building a separated cycle facility on 
the north side of Wellesley Street between the Grafton Gully Cycleway and the intersection with 
Princes Street as part of the Auckland Network Optimisation (ANO) programme. 
◼  There has been a concept developed to widen the eastbound ramp connecting Wellesley Street to 
Symonds Street to provide an additional bus lane to enable buses to turn right into Symonds Street 
and create efficiencies in bus operations. 
The above two improvements would occupy the same, currently landscaped road space on the 
northern edge of Wellesley Street and as a result, a decision is required. 
◼  There  is  a  need  to  define  the  function  and  form  of  Wel esley  Street  between  Princes  Street  and 
Queen Street to ensure that its traffic and public transport functions can operate effectively. This, 
along with an assessment of viable cycleway options should inform the route choice for the proposed 
cycle connection to connect with Te Hā Noa. 
This memorandum considers the currently proposed Wel esley Street cycle route alongside alternative 
routes to provide a safe east west cycle route between Grafton Gul y and Te Hā Noa and connect the 
university precinct. In doing so, this memo is intended to:     
◼  Identify a recommended route (or routes), outlining key trade-offs, dependencies, and residual 
risks, including matters requiring resolution in future stages of work. 
◼  Take a whole-of-network view including al  transport and place outcomes. 
Any recommendations from this investigation would have to be worked through with Learning Quarter 
groups, precinct planning and any decisions ratified by Council as part of reviewing the transport 
network in the city centre. 
Project 530992  File 530992-W00001-MEM-TI-0001.docx  2026-06-22  Revision A  Page 1 

link to page 2 link to page 3

 
 
 

Decisions required 
To guide the next stages of work, the following decisions will be required, informed by the analysis 
presented in this memo and further work and engagement: 
◼  Confirm available safe and effective cycle routes available to make the required connection. 
◼  Decide the need to protect the future ability to widen the Wellesley Street eastbound ramp to 
Symonds Street. 
◼  Decide on a preferred cycle route – informing Future Connect and corridor planning/design – based 
on a balance of al  transport and place requirements and/or any further work required to confirm 
this and/or any further work required to confirm this. 

Methodology applied 
Figure 3-1 summarises the process adopted for this study. An important first step in the study has 
been the confirmation of network roles and function.  The criticality of this section of Wellesley to traffic 
and buses means that there is a need to ensure that the preferred cycle route and any proposed 
investment in cycle facilities considers the trade-offs with the performance of other network functions. 
 
  
Figure 3-1: Methodology 
The method also needs to consider the potential to widen the eastbound ramp connecting Wel esley 
Street to Symonds Street.  This link current only allows left turns only into Symonds Street and has 
some resulting inefficiencies in the bus network. Any widening of this ramp, should it be proposed, 
would occupy same space as the proposed NZTA/ANO cycle connection. 
The work to deliver this assessment has included obtaining input from a number of subject matter 
experts from across AT and Council, including: 
◼  Council – AUDO 
◼  Cycling design and planning 
◼  Traffic/network operations 
◼  Public transport operations 
◼  Transport Strategy, including parking and servicing 

Network assessment – confirm network roles and functions 
4.1 
Trafficgoods and services 
Under the CCMP, the Cook/Mayoral/Wellesley route (Figure 4-1) is the only prioritised east–west traffic 
corridor through the city centre which places a high reliance on the route for important functions, noting 
other routes also retain a traffic function. Its role is critical for servicing, deliveries, access to parking and 
mobility spaces, and pick-up drop-off due to its connection with State Highway 1 and State Highway 16 
Project 530992  File 530992-W00001-MEM-TI-0001.docx  2026-04-29  Revision A  Page 2 

link to page 3


 
 
 
ramps and its link with Grafton Road, Hobson Street and Nelson Street. The intention of this corridor is 
to  be  designed  and  operated  as  a  general  traffic-oriented  route,  general y  with  four  lanes  in  each 
direction,  plus  turn  lanes.  The  efficient  operation  of  this  route  is  essential  to  enable  other  east-west 
routes to be prioritised as bus corridors and for places for people walking, cycling and local traffic access 
to parking. 
 
Figure 4-1: Main east-west traffic route 
The section of Wellesley Street considered in this memorandum is also an important outlet for traffic 
diverted from Queen Street as a result of the AVO on Queen Street and Wel esley Street West.  With 
the AVOs in place on Queen Street and Wel esley Street West, traffic southbound on Queen Street is 
forced to turn left into Wel esley Street.  Without a right turn into Mayoral Drive, the required routes for 
people to make their journeys is complex (Figure 4-2)
 
Figure 4-2: Traffic circulation with no right turn from Wellesley Street to Mayoral Drive 
Project 530992  File 530992-W00001-MEM-TI-0001.docx  2026-04-29  Revision A  Page 3 

link to page 4 link to page 4

 
 
 
However,  there  is  also  a  high  volume  of  buses  using  Mayoral  Drive  between  Wel esley  Street  and 
Wakefield Street, with a bus-only right turn from Wel esley Street into Mayoral Drive. This provision for 
buses clashes with the identified traffic function. This conflict between bus and traffic networks results 
in some general traffic travelling further  and on  lower-volume local streets,  undermining the  network 
planning and reducing the ability to enhance those local streets. 
4.2 
Buses 
Wel esley Street is a bus corridor of the highest order, being one of two east-west corridors provided for 
in the City Centre Bus Plan (CCBP).  In this regard, with the reliance that the city centre has on buses 
as the largest public transport mode and limited additional capacity in the road network serving the city 
centre, the efficient operation of Wel esley Street is critical to the city centre’s overall transport capacity 
and ability to grow.  
Wel esley Street provides direct access to the Te Waihorotiu Station, Universities as wel  as bus and 
rapid transit services on Albert Street (Figure 4-3). 
Due to the inability to turn right from Wellesley Street to Symonds Street, there are compromises in the 
bus network shown in Figure 4-3 which are relevant to this investigation. 
However,  the  arrangement  of  the  network  in  the  area  means  not  all  routes  are  able  to  solely  follow 
Wel esley Street as set out in the CCBP.  High volumes of buses currently need to use parts of the 
network  not  previously  envisaged  –  Mayoral  Drive  and  Wakefield  Street  –  for  movement,  stops  and 
layover.  This is due to a Grafton Gully bus facility not proceeding, and a planned Quay Park bus facility 
unable to accommodate Midtown buses. No other viable alternative arrangement has been found. 
This is contrary to Mayoral Drive’s role as the key east-west traffic corridor under the CCMP, and the 
CCBP network. 
  
Figure 4-3: Bus corridors in the city centre 
The width (and intersections) of the eastbound ramp connecting Wellesley Street and Symonds Street 
means buses cannot use it to turn right onto Symonds Street. It only allows low bus volumes to turn left, 
and if there was a need for buses to turn right from the ramp, it is likely to need to be widened, which 
risks clashing with adjoining space a cycle facility may use. 
Project 530992  File 530992-W00001-MEM-TI-0001.docx  2026-04-29  Revision A  Page 4 

link to page 6

 
 
 
However, the ramp arrangement does not currently preclude bus operations, nor would introducing  a 
right turn help to re-route buses off Mayoral Drive. The benefit of a future widening of the ramp is unclear 
at this stage. 
4.3 
Active modes 
Pedestrians are considered a priority in all places in the city centre with major routes being identified in 
the  City  Centre  Master  Plan  on  Te  Hā  Noa,  Queen  Street  and  the  laneway  network.    Major  public 
transport routes and streets within the city centre are key pedestrian generators, bringing high volumes 
of  people  into  the  city  as  bus  passengers  and  creating  strong  pedestrian  movement  and  access 
demands along these corridors. 
Cycle routes are proposed in a hierarchy from Regional (highest), Major and Connector (lowest) routes. 
Regional cycling connections are available on the northern and southern edges of the city centre on 
Quay Street and through Central Motorway Junction  connecting north-south routes on Nelson  Street 
and Grafton Gul y.  Queen  Street provides  a  mid-town north-south Major connection and  Te  Hā Noa 
provides a mid-town east-west Major connection between Nelson Street (and areas to the west) and 
Grafton Gully.  Due to the topography of the area and the location of Albert Park, the “Major” cycle link 
between Te Hā Noa’s eastern extent and Grafton Gully is shown as a Queen Street-Wellesley Street 
link, noting other routes are also proposed. 
 
Figure 4-4: AT Future Connect Strategic cycle network showing “Major” east-west connection 
In the context of the wider proposed cycle network, the “Major” link shown between Grafton Gul y and 
Te Hā Noa is likely to serve: 
◼  Key catchments to the  east and  west of the city centre for those travel ing to/from a midtown and 
Learning Quarter zone 
◼  People trying to access Victoria Quarter and destinations from Parnel  
These are important movements, with most other trips would be met by other elements in the proposed 
cycle network (Figure 4-5). Note that from a journey (origin/destination) perspective, this link does not 
have to be on Wel esley Street. 
Project 530992  File 530992-W00001-MEM-TI-0001.docx  2026-04-29  Revision A  Page 5 

link to page 2

 
 
 
 
Figure 4-5: Cycle catchments and journey connections 
 
In summary the Network Assessment concludes: 
◼  There is a moderately important “Major” east-west cycle connection needed between the very 
important “Regional” connections on the north and south edges of the city centre, linking Midtown 
and the Learning Quarter with catchments east and west. This needs to link the Grafton Gully 
“Regional” link with Victoria Street (Te Hā Noa) 
◼  Wel esley is a very important bus corridor – one of only two east-west corridors in the city centre 
and its function is compromised to an extent by the inability of buses to turn right from Wellesley 
Street to Symonds Street. 
◼  Wel esley is a very important traffic corridor – the only prioritised east-west corridor in the city 
centre. 
◼  Of note, there is no cycle route proposed on Wellesley Street, west of Queen Street, meaning 
options other than Wel esley Street are possible to connect Grafton Gully with Te Hā Noa. 
So, a cycle connection is important, but Wel esley Street’s importance as a bus and traffic corridor is 
critical, and options other than Wellesley Street can be considered for the cycle link, in part or entirely, 
as well as Wel esley Street. 

Wellesley Street proposed improvements 
5.1 
Grafton Gully Cycleway Connection 
NZTA has proposed building (but has not yet attained funding for) a separated shared path facility on 
the north side of Wel esley Street between the Grafton Gully Cycleway and the intersection with Princes 
Street  as  part  of  the  Auckland  Network  Optimisation  (ANO)  programme  which  will  give  effect  to  the 
planned cycle route. The proposed design is shown in Figure 5-1.  
Given the conflicts outlined in section 4 and the possible future need to widen the eastbound ramp 
connecting Wel esley Street with Symonds Street, this memorandum is intended to provide information 
to a support a decision on whether or not to advise NZTA to proceed with this new section of 
cycleway. 
 
Project 530992  File 530992-W00001-MEM-TI-0001.docx  2026-04-29  Revision A  Page 6 

link to page 7 link to page 2


 
 
 
 
Figure 5-1: Proposed NZTA/ANO Grafton-Wellesley Cycleway Connection 
5.2 
Wellesley Street Bus Improvements Stage 3 
The continuation of the Wellesley Street Bus Improvements project east of Queen Street (Stage 3) is a 
vital part of the city centre’s overall transport capacity and efficiency. An early concept is shown in 
Figure 5-2, with design work expected to commence in 2027. 
 
Figure 5-2: Wellesley Street Bus Improvements Stage 3 Concept (note - early concept only) 
This plan, while very early and conceptual, il ustrates the conflicts and constraints in this section of 
Wel esley Street. For example, considering the needs outlined in section 4, the plan includes: 
◼  The strategy to provide a cycleway (shown in yel ow) 
◼  The need to provide a bus right turn into Mayoral Drive from Wellesley Street to accommodate the 
inability for buses to turn right at Symonds Street 
◼  A westbound continuous bus lane 
◼  Pedestrian and passenger waiting spaces 
This arrangement also illustrates the challenges with providing for al  required functions in the space 
available, in that it does not provide: 
◼  A continuous eastbound bus lane 
◼  A traffic right turn into Mayoral Drive to provide for traffic diverted by the Queen Street AVO 
◼  Two lanes of traffic in and out of Mayoral Drive to allow this important traffic route to be effective. 
Resolving these issues and finding an optimal solution is complex with the need for design, operational 
modelling and clear assessment of trade-offs.   
Project 530992  File 530992-W00001-MEM-TI-0001.docx  2026-04-29  Revision A  Page 7 

link to page 2 link to page 8 link to page 2 link to page 17

 
 
 

Options assessment  
6.1 
Recognising traffic and bus network functions 
This options assessment focuses on options for a safe cycle route. This is because the Network 
Assessment in section 4 indicates that there are two critical functions of Wel esley Street that are of 
high importance and that are supported by committed service and infrastructure delivery. The 
assessment considers the following functions essential: 
◼  The effective function of this section of Wellesley Street as a traffic route 
◼  The effective function of Wellesley Street as a bus route 
Options assessment, as a result has focused on the cycle route options to determine: 
◼  If viable alternatives exist that deliver in the cycle network function; and 
◼  whether, on balance considering all modes and functions, the alternative cycle routes are 
preferable; or 
◼  whether it is best to accommodate the cycle route on Wel esley Street. 
6.2 
Considering the route in two sections 
For the purposes of this assessment, Wel esley Street improvements can be broken into two sections 
(Figure 6-1) as the decision on the east section enables different options for the west section. 
◼  West (Queen Street to Princes Street); and 
◼  East (Princes Street to Grafton Gul y) – the section where ANO propose to implement a new cycle 
facility. 
 
Figure 6-1: Wellesley Street proposed works 
The two sections are related as there is a continuity of functional requirements described in section 4, 
but can be considered distinctly because: 
◼  There is greater urgency in the need to make a decision on the eastern section due to the potential 
Grafton Gul y Cycleway and the intersection with Princes Street as part of the Auckland Network 
Optimisation (ANO) programme. 
◼  There are differing alternatives for a safe cycle route depending on decisions for each section, 
described in section 7). 
Project 530992  File 530992-W00001-MEM-TI-0001.docx  2026-04-29  Revision A  Page 8 



 
 
 
The west section involves Wel esley Street Bus Improvements (WSBI) Stage 3. The design for this Stage 
3 is unlikely to begin prior to 2027, currently envisaged to include a cycle path along the northern side 
of Wellesley Street. 
The east section of Wel esley Street has two main influences: 
◼  A conceptual proposal to provide a bus link via the eastbound ramp from Wellesley Street to 
Symonds Street in the future, to allow buses to turn right onto Symonds Street and improve 
outcomes for bus operations in the area. A significant capital cost would be required to move the 
retaining wal  for the off-ramp expansion.  
◼  The NZTA proposal, in detailed design phase for a Wellesley Street Active Modes Connection, a 
shared path link from Princes Street to Grafton Gully. Space is available alongside the Symonds 
Street underpass carriageway for this expansion.  
The proposed  Wellesley Street Active Modes Connection and the widened ramp noted above would 
occupy the same road space.  As a result, the decision regarding need to protect the ability to widen the 
Wel esley Street ramp plays a crucial role in which cycle route is preferred.   
6.3 
Cycle route assessment 
Five options were considered during the options assessment. Options 1,2 and 3 tie into the Wel esley 
Street Active Modes Connection whilst options 4 and 5 provide alternative routes through the Learning 
Quarter. Al  options form part of the planned Future Connect cycle network, some as part of the Major 
network and others as part of the lower order Connector network. 
The cycle route options also sit within the Learning Quarter and consider streets that are important in 
precinct plans being developed by Council and universities. 
Currently proposed east-west cycle connection: 
 
Figure 6-2: Option 1 (Wellesley Street) 
 
 
 
 
 
 
 
 
 
 
 
 
Project 530992  File 530992-W00001-MEM-TI-0001.docx  2026-04-29  Revision A  Page 9 






 
 
 
Cycle routes that utilise the Wellesley Street Active Modes Connection: 
 
 
Figure 6-3: Option 2 (Wellesley, Princes, Bowen) 
Figure 6-4: Option 3 (Wellesley, Princes, Albert 
Park, Bowen) 
Cycle routes that do not use the Wellesley Street Active Modes Connection: 
 
 
Figure 6-5: Option 4 (Alten, Waterloo Quadrant, 
Figure 6-6: Option 5 (Grafton, Alfred, Princes, 
Bowen) 
Bowen) 
6.3.1  Multi-criteria assessment criteria 
A Multi-criteria assessment (MCA) was carried out and assessed each option against the following 
criteria: 
•  Level of service for cyclists: gradients, length of climbs, legibility, conflicts, connectivity to 
Strategic routes and destinations, facility type, and accessibility for a wide range of users. 
•  Impact on bus network and operations: effects on reliability, layover locations, out-of-
service movements, passenger experience, and future network flexibility. 
•  Impact on traffic circulation: consistency with CCMP intent, effects on key east–west 
movements, and servicing access. 
•  Connectivity and land-use integration: access to University precincts, Learning Quarter 
destinations, and consistency with precinct plans. 
•  Impact on parking and kerbside use: scale of parking removal, loading impacts, and 
business effects. 
Project 530992  File 530992-W00001-MEM-TI-0001.docx  2026-04-29  Revision A  Page 10 

link to page 11

 
 
 
•  Other issues: heritage, constructability, staging and interaction with committed projects 
(WSBI Stage 3, Te Hā Noa, ANO). 
The outcomes of the MCA can be seen in Figure 6-7.  
 
Figure 6-7: MCA summary 
Large 
Large 
Scale
positive
negative
 
 
Project 530992  File 530992-W00001-MEM-TI-0001.docx  2026-04-29  Revision A  Page 11 



 
 
 
6.3.2  Option 1 – Grafton Gully to Queen Street via Wellesley Street 
Option 1 connects Grafton 
Gully to Queen Street/Te Hā 
Noa via Wellesley Street and 
Queen Street.  
It utilises the proposed ANO 
shared path connection up to 
Princes Street and then joins 
the proposed WSBI 
bidirectional cycle path on 
Wel esley Street before joining 
Queen Street. 
 
Advantages 
Disadvantages 
Notes 
◼  Considered the best safe and 
◼  Universal design/accessibility 
◼  This is the current strategy 
accessible cycle route (ANO 
concerns regarding conflicts 
◼  Leaves the eastern extent of 
and WSBI designs) 
with cyclists and bus 
constructed Te Hā Noa 
passengers – University bus 
◼  Most direct and shortest route 
disconnected from a protected 
stops by Albert Park are an 
for cycling 
facility 
important boarding/alighting 
◼  Avoids the steepest sections in 
location 
◼  Does not allow for Wellesley 
other options 
Street ramp – impacting bus 
◼  Reduces capacity for general 
reliability and routing options 
◼  Good connection to Grafton 
traffic on Wel esley-Mayoral-
through Wellesley Street, 
Road and the Auckland 
Cook EW traffic route – poor 
Mayoral Drive and Wakefield 
Domain 
CCMP alignment 
Street 
◼  Has the lowest delivery risk – 
◼  Reduces capacity for bus 
◼  There is already some level of 
part of planned works  
movements through Wellesley 
cycle provision on Wellesley 
– negative impacts on bus 
◼  The WSBI design aligns with 
Street (painted cycle lane) 
reliability with current WSBI 
the city centre approach for 
design 
slower cyclist speeds due to a 
mix of activity through these 
◼  Steep gradients limit access for 
areas, as seen on Queen 
all ages and abilities 
Street 
 
  
Project 530992  File 530992-W00001-MEM-TI-0001.docx  2026-04-29  Revision A  Page 12 



 
 
 
6.3.3  Option 2 - Grafton Gully to Victoria Street via Wellesley Street, Princes Street and Bowen 
Avenue 
Option 2 connects Grafton 
 
Gully to Queen Street/Te Hā 
Noa via Wellesley Street, 
 
Princes Street, and Bowen 
Ave.  
It utilises the proposed ANO 
shared path connection up to 
Princes Street and then joins a 
proposed bidirectional cycle 
path on Princes Street and 
Bowen Ave (park side) before 
connecting to Te Hā Noa. 
 
Advantages 
Disadvantages 
Notes 
◼  Adopts the best alternate cycle 
◼  Steep connection to Victoria 
◼  Uses the eastern extent of 
alignment west of Princes 
Street with existing/constructed 
committed Te Hā Noa 
Street (grades, quality) 
Te Hā Noa connection 
◼  Does not allow for Wellesley 
(although this is already in 
◼  Provides good access to key 
Street ramp widening in near 
place) 
University areas/Albert Park 
term 
and good connection to 
◼  Steep corner connection 
◼  Princes Street is expected to 
Grafton Road and the 
Princes/Bowen 
continue accommodating in-
Auckland Domain 
◼  Steep gradients limit access for 
service and out-of-service bus 
◼  Aligns with future University 
all ages and abilities 
movements in the medium 
Masterplan concept for Princes 
term. 
◼  Space constraints at the end of 
Street (parking removal) 
Bowen – rework of Kitchener 
◼  Confident cyclists will Stil  use 
◼  Avoids Wellesley Street 
Street intersection required 
Wellesley Street to travel 
between Princes and Queen to 
to/from Queen Street 
◼  Significant parking removal – 
provide more capacity for key 
Princes, Bowen (note this is 
bus and general traffic 
potential y a short-term issue 
movements (in alignment with 
as it is aligned with Strategy) 
the CCMP) 
 
Project 530992  File 530992-W00001-MEM-TI-0001.docx  2026-04-29  Revision A  Page 13 



 
 
 
6.3.4  Option 3 - Grafton Gully to Victoria Street via Wellesley Street, Princes Street, Albert Park 
and Bowen Avenue 
Option 3 connects Grafton 
Gully to Queen Street/Te Hā 
Noa via Wellesley Street, 
Princes Street, and Bowen 
Ave via Albert Park.  
It utilises the proposed ANO 
shared path connection up to 
Princes Street and then joins a 
proposed bidirectional cycle 
path on Princes Street which 
traverses through Albert Park 
onto Bowen Ave before 
connecting to Te Hā Noa. 
 
Advantages 
Disadvantages 
Notes 
◼  Provides good access to key 
◼  Steep connection to Victoria 
◼  Uses the eastern extent of 
University areas/Albert Park 
Street with existing/constructed 
committed Te Hā Noa 
and good connection to 
Te Hā Noa connection 
◼  Does not allow for Wellesley 
Grafton Road and the 
(although this is already in 
Street ramp widening in near 
Auckland Domain 
place) 
term 
◼  Aligns with future University 
◼  Steep gradients limit access for 
◼  Princes Street is expected to 
Masterplan concept for Princes 
all ages and abilities 
continue accommodating in-
Street (parking removal) 
◼  Space constraints at the end of 
service and out-of-service bus 
◼  Avoids Wellesley Street 
Bowen – rework of Kitchener 
movements in the medium 
between Princes and Queen to 
Street intersection required 
term 
provide more capacity for key 
◼  Significant parking removal – 
bus and general traffic 
Princes, Bowen (note this is 
movements (in alignment with 
potential y a short-term issue 
the CCMP) 
as it is aligned with Strategy) 
◼  Uses a key Step‑free access 
into Albert Park, reducing 
availability for park users and 
creating potential conflicts 
◼  Lower route legibility in 
park/shared spaces, requiring 
greater reliance on wayfinding 
and user behaviour 
◼  Heritage impacts in Albert Park 
from use of existing paths 
 
Project 530992  File 530992-W00001-MEM-TI-0001.docx  2026-04-29  Revision A  Page 14 



 
 
 
6.3.5  Option 4 – Grafton Gully to Victoria Street via Alten Road, Waterloo Quadrant and Bowen 
Avenue 
Option 4 connects Grafton 
Gully to Queen Street/Te Hā 
Noa via Alten Road, Waterloo 
Quadrant, and Bowen 
Avenue.  
The proposed protected 
bidirectional cycle facility 
begins at Alten Road, 
continuing along Waterloo 
Quadrant and Bowen Avenue 
(park side) before connecting 
to Te Hā Noa. 
 
Advantages 
Disadvantages 
Notes 
◼  Adopts the most direct route 
◼  Alten Road connection is steep 
◼  Uses the eastern extent of 
(fewer turning moments) 
but similar to the existing/in 
committed Te Hā Noa 
construction Te Hā Noa and 
◼  Avoids Wellesley Street 
◼  Allows for Wellesley Street 
existing connection between 
between Princes and Queen to 
ramp widening in near term 
Beach Road and Grafton Gully 
provide more capacity for key 
providing flexibility in bus 
Cycleway 
bus and general traffic 
network operations and 
movements (in alignment with 
◼  Steep connection to Victoria 
opportunities to take bus 
the CCMP) 
Street with existing/constructed 
services off Mayoral Drive and 
Te Hā Noa connection 
Wellesley Street 
◼  Aligned with future reduced 
(although this is already in 
traffic function of Alten Road 
◼  Alternative Grafton Gully 
place) 
and Waterloo Quadrant in the 
connection via Constitution Hill 
CCMP 
◼  Steep gradients limit access for 
possible (some heritage 
all ages and abilities 
sensitivity to be further 
reviewed) 
◼  Less direct connection to 
Grafton Road and the 
◼  Alten currently plays a 
Auckland Domain and further 
significant role in connecting 
away from AUT and UoA 
car parks on High Street to the 
facilities 
motorway network 
◼  Constraints at the end of 
Bowen – rework of Kitchener 
Street intersection required 
◼  High delivery complexity, 
requiring wider network and 
circulation changes before 
implementation due to 
significant Street changes 
required (parking and traffic 
lane real ocation)  
Project 530992  File 530992-W00001-MEM-TI-0001.docx  2026-04-29  Revision A  Page 15 



 
 
 
 
6.3.6  Option 5 - Grafton Gully to Victoria Street via Grafton Road, Alfred Street and Bowen 
Avenue 
Option 5 connects Grafton 
Gully to Queen Street/Te Hā 
Noa via Grafton Road, Alfred 
Street, and Bowen Ave.  
The proposed protected 
bidirectional cycle facility 
begins at Grafton Road, 
continues through the 
Learning Quarter via Alfred 
Street, Princes Street (park 
side), and Bowen Avenue 
before connecting to Te Hā 
Noa. 
 
Advantages 
Disadvantages 
Notes 
◼  Good access to the Learning 
◼  Steep connection to Victoria 
◼  Uses the eastern extent of 
Quarter, UoA City Campus. 
Street with existing/constructed 
committed Te Hā Noa 
Limited access to AUT. Good 
Te Hā Noa connection 
◼  Allows for Wellesley Street 
connection to Grafton Road 
(although this is already in 
ramp widening in near term 
and the Auckland Domain, 
place) 
providing flexibility in bus 
future cycle facilities on 
◼  Steep gradients limit access for 
network operations and 
Symonds Street 
all ages and abilities 
opportunities to take bus 
◼  Aligned with Strategy for Alfred 
services off Mayoral Drive and 
◼  Pedestrian–cyclist conflict risk 
Street - expected to be 
Wellesley Street 
in shared and low‑legibility 
pedestrianised under future 
environments (e.g. Alfred 
◼  Grafton Road is noted as a 
University Masterplan 
Street), with greater reliance on 
Major cycle route, but our 
◼  Avoids Wellesley Street 
wayfinding and user behaviour 
assessment indicates this 
between Princes and Queen to 
would be difficult to implement 
◼  Constraints at the end of 
provide more capacity for key 
in alignment with the wider 
Bowen – rework of Kitchener 
bus and general traffic 
CCMP Strategy 
Street intersection required 
movements (in alignment with 
 
the CCMP) 
◼  Significant parking removal – 
Princes, Bowen (note this is 
potential y a short-term issue 
as it is aligned with Strategy) 
◼  Difficult to accommodate 
cycling within the constrained 
road reserve, as lane removal 
would conflict with Grafton 
Road’s traffic role and require 
significant tree removal 
Project 530992  File 530992-W00001-MEM-TI-0001.docx  2026-04-29  Revision A  Page 16 


 
 
 

Findings and trade-offs 
7.1 
Preferred cycle route options 
In a precinct like the university area, with numerous dispersed destinations for people on cycles across 
the universities and midtown, it is likely that users wil , in practice take a range of the routes 
considered, depending on where they are going and their level of confidence and ability. The focus of 
this work is to identify a safe, al  ages and abilities route that can be used as a spine for people to 
make a range of journeys and importantly to connect the Te Hā Noa cycleway with the Grafton Gully 
Cycleway. 
Overall, Option 1 (Wellesley Street) is the most direct, least steep and most legible for cyclists.  
However, the route has the following risks and trade-offs: 
◼  West of Princes Street the route has potential conflicts between cyclists and bus passengers and 
pedestrians at busy bus stops and on pathways. 
◼  West of Princes Street, this option introduces limitations to the space available in the street to 
provide for important traffic and bus functions. 
◼  East of Princes Street the option may reduce the potential performance of Wel esley Street, 
affecting one of the city’s busiest bus corridors with potential wider network impacts on buses and 
traffic. 
◼  The option would not protect the future ability to widen the eastbound ramp from Wel esley Street 
to Symonds Street with consequences for ongoing bus operations on Mayoral Drive and Wakefield 
Street. 
Option 2 (via Princes Street and Bowen Avenue) better aligns with future traffic and precinct plans 
and improves access to the university, but involves steep gradients, parking removal, and stil  does not 
enable the future ramp widening and its ongoing consequences.  
Option 4 (via Alten Road and Waterloo Quadrant) is a planned “Connector” cycle route and 
provides a reasonably direction connection.  
This would be the preferred route should the decision be made to retain the ability to widen the 
eastbound ramp from Wel esley Street to Symonds Street. Option 4 has some potential risks: 
◼  Steep gradients and legibility issues for users. 
◼  It is longer than Option 1 and Option 2. 
◼  Delivery, design and acceptance risks including loss of significant kerbside parking on Waterloo 
Quadrant. 
7.2 
Non-preferred cycle routes 
Routes assessed that are not considered preferred are: 
Option 3 through Albert Park due to potential impacts on the park and park users. Option 2 achieves 
most of the benefits of this option and does not impact the park and its users. 
Options 5 using Grafton Road and Alfred Street due to the important traffic function and constrained 
form of Grafton Road, steep grades and potential conflicts with people in Alfred Street which is 
intended to function as a shared space. 
7.3 
Direction with regard to the Wellesley-Symonds eastbound ramp 
The operational and physical outcomes of widening the ramp were investigated in 2025 (Wellesley 
Street off-ramp (Long-Term layout), 526568-050DRP-NOT-MC-0003) as part of the City Centre Bus 
Project 530992  File 530992-W00001-MEM-TI-0001.docx  2026-04-29  Revision A  Page 17 

link to page 18 link to page 18

 
 
 
Plan (CCBP) business case. This paper identified the possible physical solution and operational 
performance associated with buses turning right from and widening of the ramp. 
This report confirmed that the ramp is suitable, with minor alterations at Princes Street for only a low 
number of bus movements per hour, and only for services turning left into Symonds Street. If a higher 
number of buses or right-turning was required, it is expected that the ramp would need to be widened, 
which is expected to cost in the vicinity of $17m1 and impact on the space available in the adjoining 
underpass for other uses, including the proposed NZTA/ANO shared path project. There would also be 
potential impacts on the layout and operation of the Symonds Street/Wellesley Street ramp 
intersection which may impact efficient bus and traffic movements.  
CCBP service pattern 
Figure 7-1 shows the proposed service pattern for buses with the eastbound ramp from Wel esley 
Street to Symonds Street remaining its current width.  Of note, the key compromises are: 
◼  The NX2 route using Mayoral Drive and Wakefield Street to complete its route and commencing 
again on Wellesley Street; and 
◼  The 70 and 75 routes having a different route to enter and exit the city centre. 
 
Figure 7-1: CCBP Service pattern 
NX2 Services 
The NX2 service had previously been expected to utilise an off-street layover, either Quay Park which 
is considered too far away and with insufficient capacity or a Grafton Gully facility no longer planned. 
The interim arrangement is for NX2 buses, as wel  as 82, 802, 923, 924 buses to use Mayoral Drive 
and Wakefield Street to complete their route and access layovers and the westbound ramp to 
Wel esley Street to commence their return route. This has some conflict with the strategic intent of 
Mayoral Drive being the main east-west midtown traffic route. There appears to be no viable 
alternative to this arrangement within the next 10-year horizon with no planned infrastructure solution 
 
1 Wel esley Street off-ramp (Long-Term layout), 526568-050DRP-NOT-MC-0003, May 2025. 
Project 530992  File 530992-W00001-MEM-TI-0001.docx  2026-04-29  Revision A  Page 18 


 
 
 
and no economical y sustainable alternative termination location. Therefore, although not original y 
part of the CCBP, AT is of the view that that the current NX2 route/layovers should be adopted as the 
ongoing operational arrangement, acknowledging that this is not as legible for customers and 
represents a compromise on the CCBP.  
930 and OuterLink Services 
It is expected that there wil  be increasing pressure and desirability to move the 930-series services 
and OuterLink away from their current routes within Auckland University’s precinct and instead use the 
eastbound Wel esley Street slip lane ramp, with a left-turn into Symonds Street. As this is a low 
number of buses per hour, and on the basis that other vehicle traffic on the ramp with be low or 
manageable, AT intends to open discussions with the University of Auckland about when and how this 
could occur, in support of campus improvements planning. This arrangement would also be adopted in 
the CCBP. 
70 and 75 services 
There is the potential for the 70 and 75 services to use the eastbound slip lane ramp, which would 
simplify the network, however, there does not currently appear to be sufficient patronage benefit to 
justify the likely associated infrastructure costs as a widening of the eastbound ramp for the additional 
bus volumes and right-turns would be required. It is recommended the current 70 and 75 routes 
remain and be confirmed in the CCBP. 
Future WX2 services 
There is also the potential for a future WX2 (service to Westgate) service to similarly use the 
eastbound ramp. As with the 70/75 routes, this additional volume of buses would likely trigger 
infrastructure to widen the ramp, to create more space. Whilst a new WX2 service is expected in the 
future, there is no confirmed date for this, as it relies on the implementation of significant enabling 
infrastructure around Ian McKinnon Drive and State Highway 16. Even when this is in place, there are 
several options for the WX2 routing within the city centre, so it is not considered that a future WX2 
service can be relied upon as requiring the use of the ramp. It is recommended that the WX2 routing 
be considered in more detail once a likely start date is known. 
Summary 
While there are some benefits in the widening of the eastbound ramp to al ow 70, 75 and possibly in 
the future, WX2 buses to turn right, the direction is that the widening of the ramp is not currently 
considered necessary, given the low level of benefits that have certainty, compared to the high cost 
and high degree of certainty associated with the NZTA/ANO proposal to implement the Wellesley 
Street Active Modes Connection. This is further supported by the assessed advantages for cyclists in 
the Wel esley Street option (east of Princes Street) and risks with the Alten Road option (Option 4) 
which would be required should the ramp be widened. 
For clarity, there are trade-offs in this direction as the ramp widening would reduce reliance on Mayoral 
Drive and Wakefield Street for bus circulation. 
7.4 
Preferred cycle route east of Princes Street and implications 
Given the above assessment, the preferred cycle route between Grafton Gully Cycleway and Princes 
Street is Wellesley Street.  
Project 530992  File 530992-W00001-MEM-TI-0001.docx  2026-04-29  Revision A  Page 19 

link to page 20 link to page 23

 
 
 
 
Figure 7-2: Recommended route for eastern section 
The main reasons for this are: 
◼  It is the intended route in published planning document and strategies. 
◼  It is most direct for cyclists with most manageable gradients. 
◼  There is a project to implement the cycle route with a high level of confidence which would improve 
cycle access and safety in a part of the city centre that has a current gap in provision. 
◼  The benefits resulting from a potential widening of the ramp for buses are not considered significant 
in the foreseeable future and larger future benefits are uncertain.  
This requires a compromise with the intended CCBP bus pattern – although as noted above, this is 
considered acceptable and as a result the issue is less complex than the Princes Street to Queen 
Street section. The decision on this section of the route is also more urgent with the potential for the 
proposed NZTA/ANO cycleway connection and specific direction is required. 
7.4.1  Remaining issues and risks resulting from this direction 
While the compromise in the CCBP noted above is acceptable in principle from a bus operational 
perspective, this direction creates greater pressure on: 
◼  The eastbound right turn for buses from Wel esley Street to Mayoral Drive – also possibly required 
for southbound traffic forced to turn left from Queen Street into Wel esley Street. 
◼  The section of Mayoral Drive between Wellesley Street and Wakefield Street – part of a critical 
traffic route and would need to retain some bus priority. 
◼  Wakefield Street, as it would need to continue to function as an important bus connector with 
layover for end of route buses. 
These issues would need to be resolved and are discussed further in section 7.5 and 8. 
7.5 
Preferred cycle route west of Princes Street and implications 
The direction above to implement a cycleway from Grafton Gul y as far as Princes Street on Wel esley 
Street leaves two options open for consideration for the remainder of this cycle connection: 
Project 530992  File 530992-W00001-MEM-TI-0001.docx  2026-04-29  Revision A  Page 20 

link to page 2


 
 
 
Option 1 – Wellesley Street to Queen Street, using Queen Street to connect with Te Hā Noa 
 
Figure 7-3: Option 1 - Wellesley Street to Te Hā Noa via Queen Street 
Option 2 – using Princes Street and Bowen Avenue to connect with Te Hā Noa 
 
Figure 7-4: Option 2 - Wellesley Street to Te Hā Noa via Princes Street and Bowen Avenue 
Key trade-offs in this decision are: 
Option 1 is the preferred route from a cyclist’s perspective with lesser gradients, less distance and 
more directnessHowever, this route would require street space that places considerable pressure on 
the core function of this section of Wel esley Street (refer section 4).  While some of these issues could 
be resolved through further design, there is at this time, considerable unresolved risk in relation to the 
following functions: 
◼  Space for a continuous bus lane eastbound between west of Lorne Street and east of Kitchener 
Street. 
Project 530992  File 530992-W00001-MEM-TI-0001.docx  2026-04-29  Revision A  Page 21 

link to page 19
 
 
 
◼  Space for a possible traffic right turn from Wellesley Street eastbound into Mayoral Drive, noting 
the diversion required by the northbound AVO on Queen Street north of Wel esley Street. 
◼  Space for adequate traffic capacity and performance connecting Wellesley Street to Mayoral Drive 
as part of the Mayoral Drive east-west traffic route. 
◼  Conflicts between cyclists and bus passengers at the busy bus stop outside Albert Park on 
Wel esley Street. 
Option 2 is a good route for cyclists that avoids the issues noted above and provides better access to 
key university destinations on Princes Street. A cycle route on Princes Street is well aligned with the 
University of Auckland’s intended future function of Princes Street as a park-edge street for active 
modes.   
An advantage of this option is that it would use the eastern extent of the recently constructed Te Hā 
Noa cycleway (east of Queen Street) improving legibility and avoiding the Te Hā Noa route terminating 
abruptly at Kitchener Street.   
This option leaves more space in Wellesley Street, west of Princes Street for accommodating 
important traffic and bus functions. 
This option has the following risks and issues: 
◼  It is not completely aligned with the previously published planned cycle route. 
◼  It is a longer route than Option 1 for cyclists accessing midtown and Te Hā Noa. 
◼  There is a steep grade at the eastern extent of Te Hā Noa/Victoria Street – although it is noted that 
this section of cycleway is already constructed. 
◼  There is some parking removal required on Bowen Avenue with associated risks. 
7.5.1  Remaining issues and risks in the section west of Princes Street and surrounding area 
There are some significant trade-offs outlined above and unresolved risks inherent in any 
recommended direction in this section. The issue is complex and any decision as to the preferred 
outcome will need to include analysis and design to ensure that the risks and issues have properly 
considered as well as stakeholder engagement, particularly with the universities. 
The need to resolve this issue is less urgent than the section of Wel esley Street east of Princes Street 
and there is time to carry out the required assessment and design to develop an optimal solution. 
Resolution of these issues will need to include the effective function of this section of Wellesley Street 
as a traffic route and bus route, specifical y: 
◼  Space for a possible traffic right turn from Wellesley Street eastbound into Mayoral Drive, noting 
the diversion required by the northbound AVO on Queen Street north of Wel esley Street. 
◼  Space for adequate traffic capacity and performance connecting Wellesley Street to Mayoral Drive 
as part of the Mayoral Drive east-west traffic route. 
◼  Conflicts between cyclists and bus passengers at the busy bus stop outside Albert Park on 
Wel esley Street. 
◼  The effective function of Wellesley Street as a bus route, including space for a continuous bus lane 
eastbound between west of Lorne Street and east of Kitchener Street and capacity for buses to 
turn right from Wellesley Street to Mayoral Drive. 
◼  The implications on Mayoral Drive of the ongoing need for buses to use Mayoral Drive and 
Wakefield Street to accommodate the inability to turn right from Wel esley Street to Symonds Street 
(a result of the proposed direction in the section east of Princes Street in section 7.4) 
Project 530992  File 530992-W00001-MEM-TI-0001.docx  2026-04-29  Revision A  Page 22 


 
 
 

Draft recommendations and actions 
As a result of this work, there are a number of recommendations to be consulted on and advanced. 
8.1 
NZTA cycleway project proceeds on Wellesley Street, east of Princes Street 
Reasons:  
Between Grafton Gully and Princes Street, Wellesley Street remains the preferred and the most viable 
option for cycling, because: 
◼  This is the route identified in published planning documents. 
◼  It is the most direct and legible for cyclists with the most manageable gradients. 
◼  There is greater certainty that cycling facilities can be delivered (NZTA proposal exists). 
Trade-offs:  
◼  There is no futureproofing for ramp widening for potential future right turning bus movements. 
Recommended action:  
◼  NZTA to proceed with their project. 
◼  NZTA project is scoped to ensure a practical and safe tie-in for buses, traffic, pedestrians and 
cyclists at the Wel esley Street and Princes Street intersection. 
8.2 
Wellesley Street ramp widening for buses is not futureproofed for  
Reasons:  
Future proofing to widen the ramp is not required because: 
◼  There is uncertainty about future bus operational requirements.  
◼  Benefits for buses being able to make a right turn onto Symonds Street are unclear. This appears 
useful but creates chal enges, and the operational movement has alternatives in the network.  
◼  Left turns by buses onto Symonds continue to be enabled, allowing a potential shift of buses off 
Alfred Street, aligning with University of Auckland proposals. 
Trade-offs: 
◼  Risks being unable to achieve future bus right turn, if needed. 
◼  Buses on the ramp pass close to sensitive University of Auckland Science building. 
Recommended action: 
◼  Use of the ramp and left turn onto Symonds Street by buses to be enabled. 
◼  Discussions commence with the University about buses using the ramp, with potential removal 
from Alfred Street. 
8.3 
Continue bus movements on Mayoral Drive and Wakefield Street  
Reasons: 
◼  Buses need to use Mayoral Drive because there is a lack of alternative layover locations in 
Learning Quarter/Grafton Gully. 
◼  This is not due to the lack of a right turn on the Wellesley Street eastbound ramp. 
Trade-offs: 
◼  Conflicts and al ocation of space between traffic and bus movements on Mayoral Drive. 
Project 530992  File 530992-W00001-MEM-TI-0001.docx  2026-04-29  Revision A  Page 23 


 
 
 
Recommended action: 
◼  The CCBP and related workstreams are to be updated to recognise this requirement. 
◼  Investigate and confirm ongoing bus layovers in the area, identify opportunities to remove buses 
from Mayoral Drive. 
8.4 
Investigate remaining modal priority challenges on Wellesley Street between Princes 
Street and Queen Street 

Reasons: 
◼  Significant unresolved network conflicts remain on Wellesley Street west of Princes Street, due to 
multiple modes sharing the limited space and the need for movements not currently provided. 
◼  Resolving this is a key enabler for upcoming work – e.g. WSBI Stage 3 and DDP. 
Trade-offs: 
◼  Current strategic plans may have to be amended for one or more modes, or a desired modal 
outcome may be unable to be achieved. 
Actions: 
◼  Investigation to confirm how bus, traffic, and cycling provision can be viably made in the section of 
Wel esley Street between Queen Street and Princes Street. 
◼  For cycling, this includes identifying a preferred cycle route between Princes Street and Te Hā Noa.  
This investigation should result in an updated concept for Wel esley Street Bus Improvements Stage 3 
and inform relevant strategies and operational plans.  
This investigation should consider: 
◼  Traffic circulation from Queen Street southbound, including into Mayoral Drive. 
◼  The performance of the Wel esley Street-Mayoral Drive connection for traffic. 
◼  The performance of Wel esley Street and the Wellesley Street-Mayoral Drive-Wakefield Street 
circuit for buses. 
◼  The operation, safety and customer experience for users of the eastbound bus stops on Wel esley 
Street. 
◼  The safety and experience for pedestrians in this area. 
◼  The experience, safety and effectiveness of the route as a cycleway. 
 
Project 530992  File 530992-W00001-MEM-TI-0001.docx  2026-04-29  Revision A  Page 24