This is an HTML version of an attachment to the Official Information request 'Approved developments and new connections in Te Atatu Peninsula'.

 
 
 
22 June 2026 
 
Ben Gracewood 
 
Email: [FYI request #34777 email]    
 
Dear Ben 
 
REQUEST FOR INFORMATION UNDER THE LOCAL GOVERNMENT OFFICIAL INFORMATION AND MEETINGS 
ACT 1987 (LGOIMA) – APPROVED DEVELOPMENTS AND NEW CONNECTIONS IN TE ATATU PENINSULA 

Your request 
On 25 May 2026, we received your request for information. In particular, your request was as follows: 
Dear Watercare Services Limited, 
For some time, Watercare have noted that Te Atatu Peninsula is an area with "limited capacity" 
(https://www.watercare.co.nz/builders-and-developers/consultation/network-capacity-in-auckland 
), at times being labelled a "red zone" for wastewater 
(https://urldefense.com/v3/__https://www.oneroof.co.nz/news/watercare-blindsides-auckland-
developers-people-will-go-under-
46798__;!!JcuPmubLuqHOewrctw!C1ekemhVxz745lUo_ol76saG5dZJIAV8rn1ZF9evR2ZWkC3naL_ac
RjEyRVI84aYBL6usgilg3rvQI0MUOCu8sd0VEzUSNunCR7P6lA5QJpG$). 
We have noted ongoing resource and building consents granted during this period, including 
consents for 13 new units on Dawnhaven Drive. 
Please provide the following information: 
1. Timeline from when development constraints (if any) were recommended for Te Atatu Peninsula 
2. Since the capacity constraints have been understood (or since 2024 if no constraints have in fact 
been put in place): information about Watercare decisions on resource consents granted in Te Atatu 
Peninsula where more than 4 units are replacing one unit (e.g. 2 single dwellings being converted to 
8 or more units, or one single dwelling being converted to 4 or more). 
3. Where permission has been granted, the reasons for granting this permission despite the 
"restricted capacity" zone, and reasons why the development should go ahead despite the 
"restricted capacity". 
4. Statistics on wastewater overflows in the network for Te Atatu Peninsula, and drinking water 
failures/ruptures. E.g. total count logged per month/year. 
Yours faithfully,  

Our response  
We provide our response below in the order of your request.  
1. Timeline from when development constraints (if any) were recommended for Te Atatu Peninsula 
The wastewater network capacity limitations for the Te Atatū Peninsula area were announced on 14 
November 2024 via Watercare’s network capacity map. An update to this was provided in June 2025, which 
set the classifications currently in place.  An excerpt of the map below outlines the following: 


 
 
•  Eastern parts of the peninsula are an area with capacity, closely monitored (light green), meaning that 
while there is generally capacity in the bulk infrastructure servicing this area, Watercare is closely 
monitoring rate of growth and network performance. Some larger developments may be declined at 
resource consent stage, depending on the specific location and impact to our networks; and 
•  Northern and western parts of the peninsula are an areas with limited capacity (dark green), meaning 
developments of up to five additional standard houses – or developments with expected wastewater 
volumes equivalent to up to five standard homes – can go ahead. This approach has been taken to 
manage demand on the wastewater network and mitigate against sudden change in system 
performance. 
  
 
Please refer to our website for more detailed information on the capacity situation in Te Atatū 
2. Since the capacity constraints have been understood (or since 2024 if no constraints have in fact been 
put in place): information about Watercare decisions on resource consents granted in Te Atatu Peninsula 
where more than 4 units are replacing one unit (e.g. 2 single dwellings being converted to 8 or more 
units, or one single dwelling being converted to 4 or more). 

The list of Resource Consent (RC) applications identified within the area is attached and it includes a search 
on our system (IPS) for all the RC applications recorded within the "Te Atatū Peninsula" area after 15 
November 2024.  
From the search outcome, we manually reviewed each application to confirm that it was located within the 
dark green restricted-capacity area. We then reviewed each application individually to determine: 
•  The status of the application; 
•  The number of Demand Equivalent Units (DUEs) proposed; 
•  Whether the proposal met the criteria outlined in the request; and 
•  The basis for Watercare's decision. 
The results of this review are provided in the attached spreadsheet (Attachment 1). 
Watercare is withholding, and has therefore redacted, some information contained within Attachment 1, 
because this is necessary to protect the privacy of natural persons under section 7(2)(a) of LGOIMA. In 
terms of section 7(1) of LGOIMA, we are satisfied that the withholding of this information is not 
outweighed by other considerations that would make it desirable, in the public interest, to make that 
information available. 

 
 
3. Where permission has been granted, the reasons for granting this permission despite the "restricted 
capacity" zone, and reasons why the development should go ahead despite the "restricted capacity". 

Three applications were identified that appear not to align with the current approach for managing 
development within this limited capacity area. These applications have been highlighted in yellow and red 
within the attached spreadsheet (attachment 1). A summary is provided below. Please refer to the 
"Observations" tab.: 
•  Ward Crescent (RC-280989): This application proposed 7 DUEs, replacing 1 existing DUE (a net increase 
of 6 DUEs). The application was originally declined but was then approved to honour a recent approval 
previously obtained through Network Capacity. Please note the conditions were different when this 
was originally approved. The Te Atatū area has since been updated to allow up to 5 connections as part 
of our latest network capacity update. 
•  Taikata Road (RC-280099): This application proposed 8 DUEs, replacing 1 existing DUE (a net increase of 
7 DUEs). The application was approved based on the current scenario; the proposed development is 
not expected to significantly impact the local network. Accordingly, despite the proposal resulting in a 
net increase of 7 DUEs, the anticipated impact on the network was considered minimal, and approval 
was therefore granted.  
•  Gill Avenue (RC-260883): This application proposed 7 DUEs, replacing 1 existing DUE (a net increase of 
6 DUEs). The application was approved because the proposed development is not expected to 
significantly impact the local network. Accordingly, despite the proposal resulting in a net increase of 6 
DUEs, the anticipated impact on the network was considered minimal, and approval was therefore 
granted.  
In addition, there were a small number of applications that were approved because, although the 
properties are physically located within the identified capacity-constrained area, their wastewater 
catchments discharge to an area where capacity remains available (light green). Examples include: 
•  Kervil Avenue (RC-285963) 
•  Clinton Avenue (RC-214815) 
4. Statistics on wastewater overflows in the network for Te Atatu Peninsula, and drinking water failures / 
ruptures. E.g. total count logged per month/year. 

The table below provides a summary of the total number of reactive, customer-raised faults (both small 
and large) for water raw jobs and wastewater raw jobs from 1 January 2024 to May 2026. This summary 
does not include any jobs that were cancelled but does include faults that Watercare investigated and 
determined to be private, related to the stormwater network or where no issues were identified. 
Numbers of leaks  
 
Jan  Feb  Mar  Apr  May  Jun  Jul 
Aug  Sep  Oct  Nov  Dec  Total 
2024 
21 
27 
34 
23 
19 
19 
23 
31 
22 
23 
27 
36 
305 
2025 
23 
23 
20 
22 
10 
25 
26 
22 
10 
13 
10 
13 
217 
2026 (Jan-May) 
46 
24 
20 
16 
16 
 
 
 
 
 
 
 
122 
Numbers of overflows  
 
Jan  Feb  Mar  Apr  May  Jun  Jul 
Aug  Sep  Oct  Nov  Dec  Total 
2024 












28 
2025 












31 
2026 (Jan-May) 





 
 
 
 
 
 
 
17 


 
 
 
Further options  
You have the right to seek an investigation and review by the Ombudsman of this decision. Information 
about how to make a complaint is available at www.ombudsman.parliament.nz or freephone 0800 802 
602. 
Yours sincerely 
 
Shane Lawton 
Head of Developer Services