This is an HTML version of an attachment to the Official Information request 'Proposed Battery Powered Trains'.


6 Henderson Valley Road, Henderson, Auckland 0612 
Private Bag 92250, Auckland 1142, New Zealand 
Ph 09 355 3553   Fax 09 355 3550 
13 January 2016 
Rob Ford 
[FYI request #3449 email] 
Dear Mr Ford 
Local Government Official Information and Meetings Act 1987 
CAS-168397-R5Y9G4 
Thank  you  for  contacting  Auckland  Transport  (AT)  on 6  December  2015  requesting  information 
regarding proposed battery powered trains. 
Auckland Transport’s response to the specific questions raised is as follows: 
What is the estimated cost associated with purchasing a new  battery train  and  retrofitting an 
existing unit? 

Battery  powering  Auckland’s  new  EMUs  to  enable  operations  outside  the  electrified  network  is  still 
under investigation but analysis completed so far is promising. Further engineering investigations are 
required  to determine  the  most  appropriate  battery  technology  and  how  to  integrate  the  battery  and 
existing  EMU  systems  for  best  control  and  operation.  Delivering  the  required  range  and  speed 
performance  within  mass  and volume limitations,  while maintaining  fire safety  and whole of  life cost, 
isn’t the easiest problem to solve.  
When the work is further advanced accurate cost estimates will be undertaken and decisions made on 
whether  retrofitting  or  building  new  vehicles  provides  the  best  outcome.  Your  request  for  this 
information  is  therefore  declined  under  section  17(g)  of  the  LGOIMA as  the  information  requested  is 
not held. 
The  total  project  cost  including  57  x  3  car  EMUs,  depot,  on-board  signalling  equipment  and  all 
associated  activities  was  $630m.   The  price  premium  to  include  batteries  and  associated  control 
equipment  is  somewhat  difficult  to  predict  due  to  the  rapidly  developing  battery  market  which  is 
experiencing cost reductions. Our current planning estimate is for a 20% cost premium.  
Has testing of this technology succeeded? 
AT is aware of a very successful battery EMU trial undertaken by Network Rail in the UK earlier  last 
year that appears to have met or surpassed all the objectives set.  
aucklandtransport.govt.nz 




If the testing is not yet complete, when is it expected to be completed? 
AT is currently still in the exploration stage. We need to determine battery technology and associated 
control systems, source the equipment, install and then test. At best this would be 6 months lead time 
but could extend to 12 or 18 months depending on how the process unfolds. 
If  the  concept  proves  to  be  viable  for  Papakura  to  Pukekohe  services  AT  considers  the  testing 
component  will  be  relatively  small  in  the  context  of  the  overall  project,  compared  to  detailed  design 
and the lead time required for sourcing the correct equipment. 
If the testing was successful, when is the estimated date of delivery? 
For new EMUs the absolute minimum supply lead time would be two years from order placement, and 
any  order  placement  is  dependent  on  availability  of  funding  which  necessarily  requires  successful 
development of the technical solution and associated business case.  
If the testing was unsuccessful, will full electrification to Pukekohe be brought forward? 
The  AT  Strategy  and  Planning  team  regularly  review  the  priority  of  rail  developments  including 
electrification  extensions  based  on  current  usage,  future  demand  modelling  and  available  cost 
estimates. 
We trust the above information has addressed the matters raised however, should you believe that we 
have not responded appropriately to your request, you have the right in accordance with section 27(3) 
of  the  LGOIMA  to  make  a  complaint  to  the  Office  of  the  Ombudsman  to  seek  an  investigation  and 
review in regard to this matter. 
If  you have any further queries, please contact me on (09) 355 3553 during business hours, quoting 
Local Government Official Information request number CAS-168397-R5Y9G4. 
Yours sincerely 
Lloyd Major 
EMU Project Director