This is an HTML version of an attachment to the Official Information request 'Slide Pack and Report Drafts: Removal of PEN Conductor Protections from AS/NZS3000:2018'.



 
1 May 2026  
File Ref: 260319 
 
Mark Harris 
[FYI request #34330 email]  
 
 
Dear Mark,  
 
Thank you for your Official Information Act (the Act) request received on 1 April 2026. You 
requested: 
 
• 
During 31/3/29025 [sic] pre-release meeting with NZEIA, WorkSafe used a slide pack that 
spoke to risk assessment, residual risk and risk treatment. However, no risk definition, risk 
assessment/scoring, discussion of residual risk or recommended risk treatments was 
contained within the independent advice report 

(https://www.worksafe.govt.nz/dmsdocument/72491-review-of-technical-decision-for-
worksafe-new-zealand-g-kenyon-technology/latest/)
  
• 
Please provide:  
• 
The slide pack presented to NZEIA on 31/3/2026.  
• 
Draft version of the independent advice report (01 through 05) 
• 
The risk definition/assessments/scoring/treatment options that led to the content 
in the slide pack.  

 
Information being released  
Please find attached the following documents.  
  
Item 
Document Date 
Document Title 
Decision 
1.   
March 2026 
Energy Safety review preso – Switching 2026  Release  
16 February 2026 
GKT-GENC-REP-
Release  
2.   
0004_r01_Review_WorkSafe_NZ 
25 February 2026 
GKT-GENC-REP-
Release  
3.   
0004_r02_Review_WorkSafe_NZ 
28 February 2026 
GKT-GENC-REP-
Release  
4.   
0004_r03_Review_WorkSafe_NZ 
5 March 2026 
GKT-GENC-REP-
Release  
5.   
0004_r04_Review_WorkSafe_NZ 
 GKT-GENC-REP-
Release 
6.   
7 March 2026 
0004_r05_Review_WorkSafe_NZ 
  
I have decided to release the documents listed above in full.  
 
The independent review noted the intention of the recommended changes introduced by the 
citation of AS/NZS 3000:2025 was justifiable and considered relevant risks and how they may be 
addressed. The independent consultant’s report sets out those risks and how they may be 
mitigated.  
 
The presentation is based on the report. It provides a summary of the report and its conclusions 
and includes an overview of the risks and how they are being mitigated, as outlined in the report. 
No separate risk analysis was necessary in preparation of the presentation. 
 
 
 
 
 
 
PO Box 165, Wellington 6140 
 


 
 
 
 
This reply addresses the information you requested.  
 
If you require further assistance, please contact [email address]. 
 
 
Yours sincerely 
 
 
 
 
Rob Pope 
Head of Inspectorate