Proposed Moonshine Hil  AM – Adjusted 
1982
Vehicle Movement Performance  
Mov 
Demand Flows  
Arrival Flows  
Deg. 
95% Back Of Queue  
Aver. 
 
Aver. 
Level of 
Prop. 
Eff. 
Aver. 
ID  
Turn   Mov 
Class  
[ Total  
HV ]  
[ Total   HV ]  
Satn   Delay  
Service  
[ Veh.  
Dist ]  
Que  
Stop Rate  
No. of 
Cycles   Speed  
Act 
 
 
 
veh/h  
%  
veh/h  
%  
v/c   
sec   
 
veh  
m  
 
 
 
km/h  
East: SH2 Hutt Expressway  
6  
R2   All MCs  
50  
7.0  
50  
7.0  
* 0.498   
64.2  
LOS E   
2.8  
20.8  
1.00   
0.75  
1.00  
28.6  
Approach  
50  
7.0  
50  
7.0  
0.498   
64.2  
LOS E   
2.8  
20.8  
1.00   
0.75  
1.00  
28.6  
North: Moonshine Hil  Road  
7  
L2   All MCs  
250  
9.0  
250  
9.0  
0.143   
5.7  
LOS A   
0.0  
0.0  
0.00   
0.52  
0.00  
53.1  
9  
R2   All MCs  
250  
9.0  
250  
9.0  
* 0.821   
59.4  
LOS E   
14.3  
107.9  
1.00   
0.94  
1.20  
29.6  
Approach  
500  
9.0  
500  
9.0  
0.821   
32.6  
LOS C  
14.3  
107.9  
0.50   
0.73  
0.60  
38.1  
West: SH2 Hutt Expressway  
10  
L2   All MCs  
50  
9.0  
50  
9.0  
0.033   
6.2  
LOS A   
0.2  
1.5  
0.14   
0.58  
0.14  
52.4  
Information 
11  
T1   All MCs  
950  
7.0  
950  
7.0  
* 0.828   
18.9  
LOS B   
40.5  
300.3  
0.86   
0.80  
0.87  
45.8  
Approach  
1000  
7.1  
1000  
7.1  
0.828   
18.3  
LOS B   
40.5  
300.3  
0.82   
0.79  
0.83  
46.1  
Al  Vehicles  
1550  
7.7  
1550  
7.7  
0.828   
24.4  
LOS C  
40.5  
300.3  
0.72   
0.77  
0.76  
42.4  
Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab).  
Vehicle movement LOS values are based on average delay per movement.  
Intersection and Approach LOS values are based on average delay for all vehicle movements.  
Official 
Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included).  
Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Green.  
Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D).  
HV (%) values are calculated for Al  Movement Classes of Al  Heavy Vehicle Model Designation.  
the 
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity Constraint effects.  
 
 
under 
Released 


1982
Act 
Information 
Official 
 
 
the 
under 
Released 

1982

Proposed Moonshine Hil  PM – Adjusted 
Vehicle Movement Performance  
Act 
Mov 
Demand Flows  
Arrival Flows  
Deg. 
95% Back Of Queue  
Aver. 
 
Aver. 
Level of 
Prop. 
Eff. 
Aver. 
ID  
Turn   Mov 
Class  
[ Total  
HV ]  
[ Total   HV ]  
Satn   Delay  
Service  
[ Veh.  
Dist ]  
Que  
Stop Rate  
No. of 
Cycles   Speed  
 
 
 
veh/h  
%  
veh/h  
%  
v/c   
sec   
 
veh  
m  
 
 
 
km/h  
East: SH2 Hutt Expressway  
6  
R2   All MCs  
200  
9.0  
200  
9.0  
* 1.031   
174.9  
LOS F   
23.8  
179.2  
1.00   
1.29  
2.00  
15.3  
Approach  
200  
9.0  
200  
9.0  
1.031    174.9  
LOS F   
23.8  
179.2  
1.00   
1.29  
2.00  
15.3  
North: Moonshine Hil  Road  
7  
L2   All MCs  
75  
9.0  
75  
9.0  
0.043   
5.7  
LOS A   
0.0  
0.0  
0.00   
0.52  
0.00  
53.1  
9  
R2   All MCs  
75  
9.0  
75  
9.0  
* 0.797   
89.5  
LOS F   
6.0  
44.9  
1.00   
0.90  
1.27  
23.8  
Approach  
150  
9.0  
150  
9.0  
0.797   
47.6  
LOS D  
6.0  
44.9  
0.50   
0.71  
0.63  
33.0  
Information 
West: SH2 Hutt Expressway  
10  
L2   All MCs  
200  
9.0  
200  
9.0  
0.140   
33.8  
LOS C  
2.5  
18.7  
0.22   
0.61  
0.22  
51.2  
11  
T1   All MCs  
1400  
7.0  
1400  
7.0  
* 1.118   
267.6  
LOS F   
228.5  
1695.8  
1.00   
2.08  
2.36  
11.6  
Approach  
1600  
7.3  
1600  
7.3  
1.118    238.3  
LOS F   
228.5  
1695.8  
0.90   
1.89  
2.09  
12.8  
Al  Vehicles  
1950  
7.6  
1950  
7.6  
1.118    217.2  
LOS F   
228.5  
1695.8  
0.88   
1.74  
1.97  
13.7  
Official 
Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab).  
Vehicle movement LOS values are based on average delay per movement.  
Intersection and Approach LOS values are based on average delay for all vehicle movements.  
Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included).  
the 
Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Green.  
Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D).  
HV (%) values are calculated for Al  Movement Classes of Al  Heavy Vehicle Model Designation.  
Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity Constraint effects.  
 
 
under 
Released 


under the Official Information Act 1982
Released 