This is an HTML version of an attachment to the Official Information request 'Spectrum allocation policy for rural broadband and fixed wireless access'.

 
 
 
 
20 March 2026 
 
Ref: DOIA-REQ-0026009-Sam Brown 
 
 
Sam Brown 
Email: [FYI request #33467 email] 
 
 
Tēnā koe Sam 
 
Thank you for your email of 8 January 2026 to the Ministry of Business, Innovation and Employment 
(MBIE) requesting, under the Official Information Act 1982 (the Act), the fol owing information: 
 
1.   All policy documents, ministerial briefings, or strategic reviews from 2020 to present 
regarding spectrum allocation for rural broadband and fixed wireless access services, 
including: 
- Assessment of spectrum needs for rural connectivity providers 
- Policy objectives for making spectrum available for regional broadband deployment 
- Reviews of whether current spectrum allocation frameworks adequately support rural 
connectivity objectives 
2.  Information regarding the 3.3-3.34GHz spectrum allocation process conducted approximately 
2022-2023, including: 
- Policy rationale for offering 6-month "exclusive rights to apply" rather than direct spectrum 
licenses 
- Assessment of whether 6-month timeframe was adequate for: 
-- Technology platform selection and vendor engagement 
-- Funding arrangement finalisation 
-- Security clearance processes 
-- Actual license application preparation 
- Number of entities that obtained exclusive rights versus number that successfully obtained 
licenses 
- Current status and usage of 3.3-3.34GHz spectrum in regions where exclusive rights were 
forfeited 
- Any review or lessons learned from this allocation process 
3.  Any analysis of 6GHz spectrum availability and potential for rural broadband deployment, 
including: 
- Assessment of 6GHz spectrum for fixed wireless access services 
International approaches to 6GHz deployment (particularly USA's Automatic Frequency 
Coordination system) 
- Whether RSM or MBIE has assessed developing AFC or similar coordination mechanisms for 
New Zealand 
- Timeline for potential 6GHz availability for outdoor fixed wireless use 
- Any industry consultation or proposals received regarding 6GHz access 
- Whether spectrum availability constraints are identified as limiting rural broadband 
deployment 

 
4.  Any assessment of spectrum availability imbalances between different provider types, 
including: 
- Spectrum holdings by mobile network operators versus fixed wireless operators 
- Whether spectrum allocation policy considers competitive balance in rural connectivity 
markets 
- Assessment of whether limited spectrum availability for WISPs/fixed wireless operators 
constrains their ability to compete with mobile operators or satel ite services in rural areas 
5.  Any advice to Ministers regarding: 
- Whether current spectrum management frameworks adequately support rural connectivity 
policy objectives 
- Resource constraints within RSM affecting spectrum policy development or allocation 
processes 
- International spectrum developments (WiFi 7, 6GHz, AFC systems) and implications for New 
Zealand policy 
- Whether spectrum policy is coordinated with rural connectivity funding programmes and 
infrastructure policy 
6.  Any correspondence with telecommunications industry participants regarding: 
- Spectrum needs for rural broadband provision 
- Barriers to accessing spectrum suitable for fixed wireless deployment 
- Requests for 6GHz access or AFC system development 
- Feedback on 3.3-3.34GHz allocation process 
 
Please find attached the documentation relevant to your request as set out in the attached document 
schedule. 
 
Please note some information has been withheld under the fol owing sections of the Act: 
•  9(2)(a), to protect the privacy of natural persons, including that of deceased natural persons; 
•  9(2)(b)(ii), to protect information where the making available of the information would be likely 
unreasonably to prejudice the commercial position of the person who supplied or who is the 
subject of the information; 
•  9(2)(ba)(i), to protect information which is subject to an obligation of confidence or which any 
person has been or could be compelled to provide under the authority of any enactment, where 
the making available of the information would be likely to prejudice the supply of similar 
information, or information from the same source, and it is in the public interest that such 
information should continue to be supplied; 
•  9(2)(f)(iv), to maintain the constitutional conventions for the time being which protect the 
confidentiality of advice tendered by Ministers of the Crown and officials; 
•  9(2)(g)(i), to maintain the effective conduct of public affairs through the free and frank expression 
of opinions by or between or to Ministers of the Crown or members of an organisation or officers 
and employees of any public service agency or organisation in the course of their duty; 
•  9(2)(h), to maintain legal professional privilege; and 
•  9(2)(j), to enable a Minister of the Crown or any public service agency or organisation holding the 
information to carry on, without prejudice or disadvantage, negotiations (including commercial 
and industrial negotiations). 
 
Information has been withheld under section 18(d) as it is out of scope. Where documents are publicly 
available I have also refused these under section 18(d), as it is publicly available, however, I have provided 
links to where you can find these documents in the attached document schedule. 
 
I do not consider that the withholding of this information is outweighed by public interest considerations 
in making the information available. 


 
 
On 5 February 2026 we contacted you asking you to narrow the scope of your request in relation to part 
6, unfortunately after we applied the additional parameters you had provided in your response the scope 
of the request was stil  far too large as the results of the search encompassed over 1000 emails in scope. 
Therefore, I refuse part 6 of your request under section 18(f) of the Act, as the information requested 
cannot be made available without substantial col ation or research. 
 
If you wish to discuss any aspect of your request or this response, or if you require any further assistance, 
please contact [email address]. 
 
You have the right to seek an investigation and review by the Ombudsman of this decision. Information 
about how to make a complaint is available at www.ombudsman.parliament.nz or freephone 0800 802 
602. 
 
Nāku noa, nā 
 
 
 
Daniel O’Grady 
Manager, RSM Policy and Planning 
Communication, Infrastructure and Trade 
 
 
 
 

 
Document Schedule 
 
Documents released 
 

Date 
Description 
Withholding grounds 
2122-1979 Briefing. Cabinet paper - Allocation 
Information withheld under section 

18 January 
2022 
of 3.5 GHz spectrum to support rol out of 5G 
9(2)(a) 
and advancement of rural connectivi.pdf 
24 
2122-1395 Briefing - Allocation of 3.5GHz 
Information withheld under section 

November 
spectrum to support rol out of 5G and 
9(2)(a) and 9(2)(ba)(i) 
2021 
advancement of rural connectivity.pdf 
23 
Information withheld under section 

September 
2021-0911 Rural Connectivity in New 
9(2)(a) 
2020 
Zealand.pdf 
Information withheld under section 

23 August 
2122-0499 Briefing 5G Infrastructure Project - a  9(2)(a), 9(2)(b)(ii) and 
2021 
rural-focussed package.pdf 
9(2)g(i) 

20 April 2023  2223-3301 Initial policy decisions on the 24 - 30  Information withheld under section 
GHz radio spectrum range SIGNED.pdf 
9(2)(a) and 9(2)(b)(ii) 
Information withheld under section 

10 March 
2223-2369 Decisions on 3.3-3.4 GHz non-
9(2)(a) 
2023 
national spectrum assignment.pdf - signed.pdf   
2223-3164 Update on 3.30-3.34 GHz regional 
Information withheld under section 

24 March 
9(2)(a) 
2023 
broadband non-national spectrum assignment 
SIGNED.pdf 
 
Information withheld under section 
9(2)(a), 

28 February  SIGNED 2324-1616 Update on 24 - 30 GHz 
2024 
Project.pdf 
9(2)(b)(ii) and 
Out of scope 

15 January 
2026 
FW: Some proposed next-steps for AFC systems  Information withheld under section 
9(2)(a) 
10   
Response to submissions 5-year spectrum 
Released in full 
Outlook 
11  20 October 
Decisions on 3.30-3.34 GHz transition to first-
Information withheld under 
2023 
in-time licencing 
sections 9(2)(a) and out of scope 

 

Date 
Description 
Withholding grounds 
12   
[Draft for review] 3.30 – 3.4 GHz Regional 
Information withheld under section 
Broadband Internal Decision Document 
9(2)a 
13   
3.3 – 3.4 GHz Options Analysis  
Information withheld under 
sections 9(2)h and 9(2)b(ii) 
14   
Reflections on 3.30 – 3.34 GHz 
Information withheld under 
sections 9(2)g(i) 
15   
3.3-3.4 GHz licensing tracking 
Released in full 
16   
Exclusive rights holders finalized list 
Information withheld under 
sections 9(2)a 
17   
3.3-3.4 GHz Decisions 
Released in full 
18   
3.3-3.4 project notes at November 2022 
Released in full 
Outcome of consultation on using 6 GHz band 
Information withheld under section 
19   
for Wi-Fi 
9(2)(a) 
2122-0776 
23 
Information withheld under section 
20  November 
Communications Officials_ Fortnightly Report 
9(2)(a) and out of scope 
2025 
for Fortnight Ending 23 November 2025 .pdf 
21  7 December  Communications Officials_ Fortnightly Report 
Information withheld under section 
2025 
for Fortnight Ending 07 December 2025 .pdf 
9(2)(a) and out of scope 
22  3 March 
2324-1452 Communications Officials_ Weekly 
Information withheld under section 
2024 
Report for week ending 3 Mar 2024.pdf 
9(2)(a) and out of scope 
6 GHz FWA trial licences request.pdf RE_ 6 GHz  9(2)a 
23  3 July 2025 
FWA trial licences request _IN-CONFIDENCE - 
9(2)(b)(ii) 
RELEASE EXTERNAL_.pdf 
Fwd 6 GHz FWA trial licences request [IN-
9(2)a 
24  4 October 
2025 
CONFIDENCE - RELEASE EXTERNAL] 
[UNCLASSIFIED].pdf 
25  9 October 
RE 6 GHz FWA trial licences request 
9(2)a 
2025 
[UNCLASSIFIED].pdf 
26  23 July 2025  Re_ 6 GHz FWA trial licences request 
9(2)a 
_UNCLASSIFIED_.pdf 
27  1 September  RE  6 GHz FWA trial licences request 
9(2)a 
2025 
[UNCLASSIFIED] 

 

Date 
Description 
Withholding grounds 
28  N/A 
Radio Spectrum Outlook Consultation 
9(2)a 
Response from Telco2 Ltd.pdf 
29  3 July 2025 
6 GHz Trial for Manawatu - Google Docs.pdf 
9(2)a 
17 
Released in full 
30  November 
6084HH_Report_FCC_MPE_6948201_(5.1, 5.8 
2023 
GHz) 
17 
Released in full 
31  November 
6084HH_Report_FCC_RF_FR380325_(5.1, 5.8 
2023 
GHz part 1).pdf 
17 
Released in full 
32  November 
6084HH_Report_FCC_RF_FR380325_(5.1, 5.8 
2023 
GHz part 2).pdf 
17 
Released in full 
33  November 
6084HH_Report_FCC_RF_FR380325-01_(6 
2023 
GHz).pdf 
34  21 October 
6092HH_FA470407-01_FCC MPE Test 
Released in full 
2023 
Report.pdf 
35  29 August 
6092HH_FR470407_FCC RF Test Report_5G 
Released in full 
2024 
UNI 3.pdf 
36  24 October 
6092HH_FR470407-01AA_FCC RF Test 
Released in full 
2024 
Report_5G UNI 1.pdf 
37  29 February 
2024 
E513139-A6065-CB-1-Amendment-2.pdf 
Released in full 
38  29 February 
2024 
E513139-A6065-CB-1-Original.pdf 
Released in full 
39  1 January 
SDOC_450v_6084HH_tc2.pdf 
s(2)a 
2025 
40  1 January 
SDOC_450v_6092HH_tc2.pdf 
s(2)a 
2025 
 
 
 

 
Documents withheld in ful  
  #  Date 
Description 
Withholding grounds 

N/A 
Inspire Trial Setup North Range Road.pdf 
Refused in ful  under section 
9(2)b(ii) 

N/A 
Inspire Trial Setup Saddle Hill.pdf 
Refused in ful  under section 
9(2)b(ii) 

N/A 
Inspire Trial Setup Te Mata Linton.pdf 
Refused in ful  under section 
9(2)b(ii) 

N/A 
Review of AFC Proposal Documents 
Withheld in full s 9(2)f(iv) 

 
RE_ 3_3GHz - Auction Catalogue - Draft IN-
Refused in ful  under section 
CONFIDENCE RELEASE-EXTERNAL 
9(2)(h) 

 
RE_ New information on 3_30-3_34_ further 
Refused in ful  under section 
licence query_planned licences 
9(2)(h) 

 
RE_ Policy logic and legal view on the 
Refused in ful  under section 
acquisition limit IN-CONFIDENCE 
9(2)(h)  
Information withheld in ful  under 

12 May 2024  2324-1462 Communications Officials_ Weekly 
Report for week ending 12 May 2024.pdf 
section 9(2)g(i), 9(2)(a) and out of 
scope 
Refused in ful  under section 

N/A 
AFC Full Proposal Telco2 Inspire Cambium 
9(2)b(ii) 
Qualcomm - Google Docs.pdf 
 
10  N/A 
450v trial Link Budget and CN objectives 
Refused in ful  under section 
9(2)b(ii) 
11  N/A 
afc_trial_records_example_20250729.txt 
Refused in ful  under section 
9(2)b(ii) 
 
 
 

 
Documents refused under section 18(d) as publicly available 
 

Date 
Description 
Link to publicly available 
information 
Six-month Right to Place 3.30-3.34GHz Non-
Refused in ful  under section 18(d) 
national 
Auction 26 | Radio Spectrum 

18 April 2023  Spectrum Licenses: 
Management New Zealand 
Auction Catalogue 

April 2025 
Unlocking-6-GHz-Wi-Fi-whitepaper-Qualcomm- Refused in ful  under section 18(d) 
AFC-Suite.pdf 
Unlocking-6-GHz-Wi-Fi-whitepaper-
Qualcomm-AFC-Suite.pdf 

16 February  ISED_AFC_Data_Glossary.pdf 
Refused in ful  under section 18(d) 
2024 
AFC_Data_Glossary.pdf 

25 April 2025  WINNF-TS-1014.pdf 
Refused in ful  under section 18(d) 
WINNF-TS-1014.pdf 

N/A 
6084HH Antenna Specification.pdf 
Refused in ful  under section 18(d) 
7331792.pdf 

29 February  6084HH_Cert_CB_Safety_IEC62368-1_DK-
Refused in ful  under section 18(d) 
2024 
150779-UL.pdf 
DK-150779-UL | IECEE Certificates 

29 February  6084HH_Report_CB_Safety_IEC62368-
Refused in ful  under section 18(d) 
2024 
1_E513139-A6065-CB-1.pdf 
pc_2149-CB_Report_USB-EXT-2-1G 

6 May 2025 
6084JH_Cert_CB_Safety_IEC62368-1_DK-
Refused in ful  under section 18(d) 
150779-M3-UL_(Thailand Factory).pdf 
DK-150779-M3-UL | IECEE 
Certificates 

 
6092HH Antenna Specification.pdf 
Refused in ful  under section 18(d) 
6937186.pdf 
10  2023 
AFC System to AFC Device Interface 
Refused in ful  under section 18(d) 
Specification v1.5.pdf 
6 GHz AFC Resources | Wi-Fi 
Alliance 
11  2023 
AFC_System_Reference_Model_v1.0.pdf 
Refused in ful  under section 18(d) 
6 GHz AFC Resources | Wi-Fi 
Alliance 
12  2025 
Cambium_Networks_data_sheet_2x2_450v.pdf  Refused in ful  under section 18(d) 
Cambium_Networks_data_sheet_2
x2_PMP_450v_SM.pdf 
 

 

Date 
Description 
Link to publicly available 
information 
13  2024 
Cambium_Networks_data_sheet_PMP_450v 
Refused in ful  under section 18(d) 
AP.pdf 
PMP-450v-4x4-Fixed-Wireless-SM-
and-PTP-Backhaul-Data-Sheet.pdf 
14  15 March 
DA-24-166A1_Rcd.pdf 
Refused in ful  under section 18(d) 
2024 
DA-24-166A1.pdf 
15  5 February 
E513139-A6065-CB-1-Amendment-1.pdf 
Refused in ful  under section 18(d) 
2025  
Test-Report-Audio_Video-Info-and-
Comm-Tech-Equipment-Safety-
Requirements-E322375-A6031-CB-
1.pdf 
WGNDOC01-#5123270-v5-MBIE_- Licence 
Refused in ful  under section 18(d) 
Agreement   
https://www.rsm.govt.nz/assets/Up
16   
(for licences within 3.30-3.34GHz 
loads/documents/auctions/licence-
Non-national spectrum) 
agreement-for-licences-within-3.30-
3.34ghz.pdf 
with [operator]