Smart meter
Equipment type
Smartmeter (Electricity revenue meters)
Rating
Model number
7CH-A152-19-F211-7F02-1010
Country of manufacture
Other details
Smart meter - 7CH-A152-19-F211-7F02-1010 - Serial No 9(2)(a) privacy - Meter
No 9(2)(a) privacy- also had a tag on it , Vircom EMS Barcode number on tag
9(2)(a) privacy - Other Information on Meter: VIRCOM EMS date of Installation
23/03/10 Technician GC - ICP 9(2)(a) privacy address S9(2)(a) Privacy Date
of Retest 23/0325 Certificate Serial A242566
1982
Voltage
230
Victim
Incl. in Reporting
Yes
Act
No casualty
Address
S9(2)(a) Privacy
Town/City
Lower Hutt
Property Loss
No property loss
Investigation summary (investigation)
Property loss
Event type
Other/Unknown (Electrical)
Other losses
Legal assessment
Accidents (Non-notifiable)
Information
Investigation
Lead agency
Energy Safety
Investigation type
Incident
Environment
Building
Investigation Started 5
Site type
Commercial
November 2018
Official
FENZ - Notified that power equipment in the building was not working correctly, hair dresser occupier, electrician
called to site, electrical meter appeared to crackling, and also LCD screen was going to al 00000 then restarted,
the
no visible burning showing in back of meter. Similar incidents have been attended before and FENZ was told
there may have been a fault in a batch of meters.
Smart meter - 7CH-A152-19-F211-7F02-1010 - Serial No 9(2)(a) privacy - Meter No 9(2)(a) privacy- also had a tag on
it
under
, Vircom EMS Barcode number on tag 9(2)(a) privacy - Other Information on Meter was VIRCOM EMS date of
Installation 23/03/10 Technician GC - ICP 9(2)(a) privacy address S9(2)(a) Privacy Date of Retest 23/0325
Certificate Serial A242566
Released
Page 2 of 5
10:33:02am
26/11/2025
ES contacted the meter owner, Vector-AMS, and investigated the apparently faulty meter and looked into the
claim of the “faulty meter batch” from our technical services team.
Confirmed by phone conversation with
t
S9(2)(a) Privacy hat there is no batch of meters that had faults.
al
S9(2)(a) Privacy so emailed the fol ow points though for this incident; our technician reported that:
• He found the power on-site fluctuating, so that when load was applied by using appliances in the shop the
voltage dropped significantly, causing the old circuit breakers on the meter board to crackle/hiss.
• The meter itself did not make any sound, but when the voltage dropped the meter display went blank (as would
be expected).
• The network operator contractor could not initial y locate the supply to the shop but eventually found this on the
roof.
• The network fuse on the roof had deteriorated significantly - probably due to exposure to the elements - so that
it could no longer supply power to the site under load.
• The meter did not show any sign of being faulty and there was no sign of the meter overheating.
1982
Causal Factor
Party Factor
Third Party
Equipment Factor Malfunction
Act
Work Practice
Operation
Environment
Other
Factor
Description of causal factors
The meter did not show any sign of being faulty and there was no sign of the meter overheating.
The power fluctuations were caused by a deteriorated network fuse on the roof of the building.
Summary of Event (Public)
Information
FENZ notified WorkSafe NZ of a potential electrical fire incident at a hairdresser's premises involving the
revenue meter.
Investigation Outcome (Public)
Fire and Emergency NZ investigated a potential fire with a revenue meter in a switch board when the
Official
occupier heard crackling noises that appeared to be coming form the switchboard. The occupier was
alerted to the issue when the electrical equipment with the premise was not operating correctly.
A metering technician was called to the site to examine the revenue meter and found that there was
the
power fluctuations within the electrical installation. The fluctuations were caused by a deteriorated
network fuse on the roof of the building. The technician did not find any evidence that the meter was
faulty, the crackling sound was the result of the power fluctuations, however as a precaution only the
meter was replaced with a new one.
under
The local Network contractor carried out remedial work to repair the deteriorated network fuse.
Event Note:
Created
17/10/2018 9:26:00am
Owner name
David McLaughlan
Filename
Released
Subject
Note created on 17/10/2018 9:26 a.m. by S9(2)(a) Privacy
Page 3 of 5
10:33:02am
26/11/2025

1982
Act
Information
Official
the
under
Released
What were their address(es) and telephone number(s)?
When was the contact made?
Verification: Please type the word ''complaint''
complaint
Created
17/10/2018 4:56:00pm
Owner name
David McLaughlan
Filename
ICP 000009(2)(a) privacy
.msg
S9(2)(a) Privacy
Subject
File Attachment
Note
5/11/2018 12:10:00pm
Created
David McLaughlan
Owner name
1982
ICP 000009(2)(a) privacy
L
S9(2)(a) Privacyower Hutt .msg
Filename
File Attachment
Act
Subject
Note
5/11/2018 12:11:00pm
Created
David McLaughlan
Owner name
RE ICP 000009(2)(a) privacy
Lo
S9(2)(a) Privacy wer Hutt UNCLASSIFIED.msg
Information
Filename
File Attachment
Subject
Note
Official
the
under
Released
Page 5 of 5
10:33:02am
26/11/2025