Suze Keith 
Whare Kaupapa Atawhai 
Conservation House  
 
18-32 Manners Street,  
fyi-request-32312-
PO Box 10420, 
[email address] 
Wellington 6011 
 
doc.govt.nz   
 
25 November 2025 
 
Ref: OIAD-5650 
 
  
 
 
Tēnā koe Suze 
Thank you for your request to the Department of Conservation (DOC), received on 15 
September 2025, in which you asked for: 
1. I would like all correspondence, reports, documents, meeting minutes, file 
notes, etc, you have on record regarding the proposal to develop 4 open cast 
mines, underground mine, industrial cyanide processing plant, permanent waste 
tailings dam, engineered land forms and miners caravan park in the Bendigo 
Ophir - Dunstan Mountains area by Matakanui Gold / Santana Minerals. 
Regardless of whether they are associated with fast track consenting or any other 
process. 

2. From August 25, 2025 until present day. 
We have considered your request under the Official Information Act 1982 (the OIA). 
On 13 October 2025, we extended the timeframe for responding to your request to 25 
November 2025, due to the substantial volume of information sought and the time required to 
compile a response. 
During the pre-application phase, Santana Minerals submitted materials to DOC for 
assessment. This information was provided under an obligation of confidence. Both the reports 
and DOC’s feedback on these reports contain technical and sensitive information related to the 
Fast-track consenting process. 
To maintain transparency while protecting the integrity of the process, DOC has either provided 
descriptions or summaries of these documents under section 16(1)(e) of the OIA or withheld 
them in full where necessary. This approach ensures official information is released while 
preserving Santana Minerals’ ability to lodge its application without prejudice. 
Santana Minerals lodged its Fast-track application on 3 November 2025. The Environmental 
Protection Authority (EPA) is currently assessing the application for completeness. Once initial 
checks are complete, the application wil  be published, a process that typically takes one to 
three weeks. Until the formal application is publicly available, any reports provided by Santana 
 
 

 
 
Minerals to DOC remain commercially sensitive. Therefore, withholding or summarising this 
information is stil  required where referenced. 
As advised, we have provided descriptions of some reports submitted by Santana Minerals, as 
they remain commercially sensitive and were provided under an obligation of confidence. 
However, the full reports are withheld under section 18(d) of the OIA, as the information 
requested is or wil  soon be publicly available when the EPA publish the application.  
-  Appendix A lists the documents withheld in full, along with the relevant grounds for 
withholding. 
-  Appendix B contains summary information for documents too sensitive to release in full at 
present, pursuant to section 16(1)(e) of the OIA, as well as withholding grounds for which a 
summary has been provided. 
-  Appendix C includes correspondence and any remaining documentation within the 
requested period. Where applicable, email attachments are provided beneath the relevant 
email chain unless they are addressed elsewhere, withheld in full, or have been provided 
and declined in previous requests. 
I have decided to release the relevant parts of the documents listed above, subject to 
information being withheld under one or more of the following sections of the OIA, as applicable: 
•  personal information, under section 9(2)(a) – to protect the privacy of natural persons, 
including deceased people, 
•  commercially sensitive information, under section 9(2)(b)(i ) – to protect the commercial 
position of the person who supplied the information, or who is the subject of the 
information, 
•  information provided in confidence, under section 9(2)(ba)(i) – to protect information 
where release would prejudice the ongoing supply of similar information. 
•  free and frank expression under section 9(2)(g)(i) – to maintain the effective conduct of 
public affairs, 
•  advice subject to legal privilege, under section 9(2)(h) - to maintain legal professional 
privilege, 
•  improper gain or advantage, under section 9(2)(k) – to prevent the disclosure or use of 
official information for improper gain or improper advantage. 
In addition, some information has been removed and marked as ‘Not in scope’ because it is either 
administrative in nature or falls outside the scope of your request. 
In making my decision, I have considered the public interest considerations in section 9(1) of the 
OIA and determined there are no public interests that outweigh the grounds for withholding. 
You are entitled to seek an investigation and review of my decision by writing to an 
Ombudsman as provided by section 28(3) of the OIA. 

 
 


 
 
Please note that this letter (with your personal details removed) and attached documents may 
be published on DOC’s website. 
 
Nāku noa, nā  
 
Lynn Hansberry 
Acting Director Regulatory Systems Performance 
Department of Conservation 
Te Papa Atawhai 
 
 

 
 

 
 
Appendix A 
 
Documents withheld in full 

Document description 
Withholding grounds 
Draft DOC Concession and Conditions for Access Route to CIT Battery 
9(2)(b)(i ), 9(2)(h), 9(2)(j) 
(5 Sept 2025).docx 
 
Draft DOC Concession and Conditions for Ardgour Rise (5 Sept 
9(2)(b)(i ), 9(2)(h), 9(2)(j) 
2025).docx 
 
Draft DOC Concession and Conditions for SH8 and Ardgour Road 
9(2)(b)(i ), 9(2)(h), 9(2)(j) 
Intersection (5 Sept 2025).docx;  
 
Draft DOC Concession and Conditions for Willow Clearance (5 Sept 
9(2)(b)(i ), 9(2)(h), 9(2)(j) 
2025).docx;  
 
Critique of the Habitat NZ invertebrate report. W. Chinn..docx 
9(2)(b)(i ), 9(2)(g)(i),  
Part H - Working Draft Rules Assessment for RMA Approvals (29 August 
9(2)(b)(i ) 
2025) - for DOC.docx 
Section 4 - BOGP Working Draft Substantive Application Report - 
9(2)(b)(i ) 
Approvals Sought (29 August 2025) - for DOC.docx 
Email to Environmental Solicitor, dated 29 August 2025, 2:56PM 
9(2)(h) 
FW: Bendigo-Ophir Gold Project - fast track pre-lodgement consultation 
Email attachment of further email correspondence from in-house solicitor,  9(2)(h) 
Malcolm Lucas, to DOC staff, dated 8 September 2025. 
‘RE: Section 78 conditions – next steps’ 
Feedback on the Vegetation Values Assessment: 
9(2)(b)(i ), 9(2)(ba)(i), 9(2)(g)(i) 
BOGP_preapp_vegetation_advice_2025090.docx - 4 Sept 2025 
 
 
 
 
 
 
 
 
 
 
 
 


 
 

 
 
Appendix C  
 
Document schedule 

Item  Date 
Document description 
Decision 

24 August to 15  Email correspondence 
Released in part 
September 
2025 

9 June 2025 
DOC Response Santana Minerals Ltd 09062025 
In full 

August 2025 
Memo - Economic impacts of BOGP updated for 
In full 
June 2025 Pre-Feasibility Study 

1 September 
R239296_Map1_Topo_PCL 
In full  
2022