Roads of national significance
Waikato Expressway
Cambridge Section
Effects on the Road Network
A
E
F
G
H
D
I
+1100
J
Increase
+1300
B
Decrease
Cutoff = 500 Vehicles
C
Changes to average daily traffic in 2021 resulting from construction of the Waikato Expressway
LOCATION
SH1 immediately
SH1 immediately
SH1 past the
SH1B (Victoria
SH1B (Victoria
Peake Rd at
Swayne Rd
Watkins Rd
St Kilda Rd
Thornton
north of Hautapu
west of
Golf Course
Rd) immediately
Rd) immediately
proposed
at proposed
at proposed
Rd east of
TRAFFIC FLOW
Rd
Cambridge
north of
north of Hautapu
overbridge
overbridge
Expressway
Oaklands Dr
Cambridge
Rd
A
B
C
D
E
F
G
H
I
J
2010 existing traffic flow
18,000
17,100
15,100
6,500
5,900
800
1,600
1,200
500
1,800
under the Official Information Act 1982
2021 predicted traffic flow without the Waikato
Expressway
24,400
19,700
18,000
8,900
6,300
1,000
900
1,900
700
2,500
2021 predicted traffic flow with the Waikato
Expressway
31,600
12,600
8,600
11,400
5,200
1,500
1,000
0
1,800
3,800
Changes to 2021 traffic resulting from the
construction of the Waikato Expressway
+7,200
-7,100
-9,400
+2,500
-1,100
+500
+100
-1,900
+1,100
+1,300
Annual average daily traffic at various locations in 2010 and in 2021 with and without the Waikato Expressway
Released
Expected safety improvements
•
40% reduction in crash costs (equivalent to saving $3.1 million per year).
www.nzta.govt.nz/waikato-expressway