Thank you for your request to the Department of Conservation (DOC), received on 19 July 2025 in 
which you asked for: 
 
1.  I would like all correspondence, consenting materials, reports, documents, meeting minutes, file 
notes, etc, you have on record regarding the proposal to develop a series of open cast 
goldmines in the Bendigo Ophir - Dunstan Mountains area by Matakanui Gold / Santana 
Minerals. Regardless of whether they are associated with fast track consenting or any other 
process. 

2.  From June 27, 2025 until present day. 
 
On 15 August 2025, we extended the timeframe for responding to 26 September 2025 due to the 
substantial collation and research, with approximately 2,000 pages needing to be assessed. 
Consultation with relevant third parties also needed to be conducted. 
 
This letter is to advise you that I have made a decision on your request but additional time is needed 
to finalise material. We expect to provide the information by 9 October 2025, sooner if possible. 
 
Decision on your request 
During the requested period, DOC received a range of draft and final documents from Santana 
Minerals. Many are highly technical and have been withheld in full due to sensitivities linked to the 
anticipated fast-track consenting application Santana is expected to lodge. DOC must balance the 
public interest against the need to avoid prejudicing Santana’s ability to lodge an application. 
 
Withheld information 
Documents being withheld in full are outlined in Appendix A. In making this decision, I have 
considered the public interest in disclosure under section 9(1) and determined that it does not 
outweigh the reasons for withholding. 
 
 
 
 
 
 
 
 
 


Information we wil  provide 
A decision has been made to release high-level summaries of selected reports under section 
16(1)(e) of the OIA. These are listed in Appendix B of this letter. Additional correspondence and 
documents will also be released either in full or in part, as outlined in Appendix B. 
 
You have the right to seek a review of this decision by the Ombudsman under section 28(3) of the 
OIA. Information about how to do so is available at www.ombudsman.parliament.nz. 
 
If you wish to discuss this response to your request, please contact 
[email address].  
 
Nāku noa, nā 
 
Siobhan Quayle 
Director Regulatory Systems Performance 
Department of Conservation 
Te Papa Atawhai 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 


 
 
 
 
 
 
 
Appendix A  
 
 

Document description 
Withholding grounds 
Aquatic Ecology Assessment 
9(2)(ba)(i) 
250528 Aquatic Assessment Report Bendigo_FINAL.docx 
9(2)(g)(i) 
Mammalian Pest Survey 
9(2)(ba)(i) 
20250515_BOGP_Mammalian_Pest_Report_v001.pdf 
9(2)(g)(i) 
Terrestrial Invertebrate Survey 
9(2)(ba)(i), 9(2)(g)(i) 
20250519_BOGP_Terrestrial_Invertebrate_Survey_Final_v001.pdf 
Socio-economic Baseline 
9(2)(b)(i ), 9(2)(j) 
BOGP_SE Baseline_v2.0_final.pdf 
Economic Impacts Report 
9(2)(b)(i ), 9(2)(j) 
Economic impacts of the Bendigo-Ophir Gold Project_FINAL (1).pdf 
Archaeological Management Plan 
9(2)(ba)(i), 9(2)(g)(i) 
J011821_AMP_REV A 1.pdf 
Heritage Assessment 
9(2)(b)(i ), 9(2)(ba)(i) 
J011821_BOGP HA_May 2025 
Heritage – Construction Camp 
9(2)(b)(i ), 9(2)(ba)(i) 
J012084_Camp HA_May 2025.pdf   
Recreation Assessment 
9(2)(b)(i ), 9(2)(j) 
Matakanui Bendigo-Ophir recreation assessment Final 12 June 2025.pdf 
Integrated Transport Assessment 
9(2)(b)(i ), 9(2)(j) 
310206156_bogp_ita_250513_final_FTA.pdf 
Construction TMP 
9(2)(b)(i ), 9(2)(j) 
Matakanui Gold Limited Construction TMP Final Draft.docx 
Landscape Effects Assessment 
9(2)(b)(i ), 9(2)(j) 
Landscape, Natural Character and Visual Assesment.pdf 
Surface Water Effects Assessment 
9(2)(b)(i ), 9(2)(ba)(i) 
Surface_Water_Effects_Rpt-Z24002BOG-2 (FINAL).pdf 
 
 
 
 


 
 
 
 
 
 
Appendix B 

 
Date 
Document description 
Decision 
27 June - 19 July  Email correspondence 
Partial release 
2025 
28 March 2025 
Magazine & Emulsion Tank 
Summary  
J012082_Emulsion Tanks 2025 (1).pdf 
17 April 2025 
Ardgour Rise Realignment 
Partial release 
J012109_AGR_April 2025.pdf 
20 April 2025 
CIT Battery Access Track 
Partial release 
J012137_CIT Track_April 2025.pdf 
30 April 2025 
Groundwater Effects Assessment 
Summary  
Gw_Effects_Rpt-Z24002BOG-1(FINAL).pdf 
30 April 2025 
Groundwater Bore Take Assessment 
Summary  
Gw_Take_Effects_Rpt-Z24019SML-3 FINAL 
12 May 2025 
Groundwater Modelling Analysis 
Summary  
 
hardrock_bog_report_2025_05_12 FINAL 
13 May 2025 
Noise & Vibration Assessment 
Summary  
Rp 001 R02 20230685 Bendigo-Ophir Gold Project- 
Assessment Of Noise Effects _ FINAL.pdf  
15 May 2025 
Exterior Lighting Report 
Summary  
CQ24020 BOGP Exterior Lighting Report Rev C FINAL.pdf 
15 May 2025 
Surface Water Effects Assessment 
Summary  
Surface_Water_Effects_Rpt-Z24002BOG-2 (FINAL).pdf 
15 May 2025 
Native Bat Survey 
Summary  
20250515_BOGP_Native_Bat_Survey_Final_v001.pdf 
27 May 2025 
Bond Introduction 
Summary  
Matakanui Bond Introduction-e.pdf 
5 June 2025 
Air Quality Assessment 
Summary  
Air Quality C051440001R003.pdf 
5 Jun 2025 
Bendigo-Ophir Gold Project Mine Closure Plan  
Summary  
J-NZ0454-002-R-Rev1-MCP.pdf 
7 July 2025 
Word document 
Partial release 
Report Summary – Bendigo-Ophir Gold Project.docx 

8 July 2025 
Visual Simulations  
Partial release 
Landscape Visual Simulations.pdf 
29 July 2025 
GIS shape files 
Summary  
29 July 2025 
DOC Document Register 
Full release