Attachment B
 
Report 
East West Connections: Coastal Process 
Assessment to Support Option Selection 
ACT
Prepared for the NZ Transport Agency and Auckland Transport 
THE  
Prepared by Beca Ltd 
15 October 2014  
UNDER 
INFORMATION 
RELEASED 
OFFICIAL 
 


 
Contents 
Executive Summary 
1 
1  Introduction 
2 
1.1 
The project 

1.2 
The Options 

1.3 
Key design assumptions 

2  Site Description 
4 
2.1 
Physical Environment 

2.2 
Coastal Processes 

3  Assessment of Options 
8 
3.1 
Assessment of Option D 

THE  ACT
3.2 
Assessment of Option E 

3.3 
Assessment of Option F 

3.4 
Consideration of Climate Change 

3.5 
Mitigation Measures 

4  Conclusion and Recommendation 
10 
5  Bibliography 
11 
UNDER 
 
Cover Photo: View of the new Manukau Harbour Crossing bridge from the Waikaraka cycleway 
 
 
INFORMATION 
RELEASED 
OFFICIAL 
East West Connections: Coastal Process Assessment to Support Option Selection //  // NZ1-9693877-1 0.1 // 15 October 2014  // i 


 
Revision History 
Revision Nº 
Prepared By 
Description 
Date 

Connon Andrews 
Draft 
9 October 2014 

Connon Andrews 
Final  
15 October 2014 
 
Document Acceptance 
Action 
Name 
Signed 
Date 
Prepared by 
Connon Andrews 
 
15 October 2014 
Reviewed by 
Andrea Rickard 
 
15 October 2014 
Approved by 
Andrea Rickard 
 
15 October 2014 
on behalf of 
Beca Ltd 
THE  ACT
UNDER 
INFORMATION 
RELEASED 
OFFICIAL 
East West Connections: Coastal Process Assessment to Support Option Selection //  // NZ1-9693877-1 0.1 // 15 October 2014  // ii 


Executive Summary 
Executive Summary 
A qualitative review of coastal processes has been completed for East West Connection Road alignment 
Options D, E and F that will encroach into the Coastal Marine Area (CMA). 
Mangere Inlet and Onehunga Bay have been subject to significant change since the mid 1800’s and has 
been the location of several large scale industrial developments that has resulted in environmental 
degradation of the CMA (ARC, 2009).  Ongoing development has resulted in reclamation of the foreshore 
concentrated along the northern embankment of the Mangere Inlet and to the west of Gloucester Park.  It is 
estimated that up to 1.2 km2 has been reclaimed within the inlet (Northern Gateway Alliance, 2006).  The 
coastal edge is protected by a variety of coastal structures including tipped rock, rock revetments and vertical 
seawalls offering varying degrees of coastal erosion protection.  Sediments within the study area have been 
documented to have high levels of contaminants that include copper, zinc, lead, ddt, dieldrin and arsenic. 
Due to the extensive intertidal nature of the Manukau Harbour ambient wave, current and sedimentation 
processes are relatively benign.  Accordingly, beach widths are either narrow or absent particularly at high 
ACT
water levels exposing the foreshore embankment directly to coastal processes.  This has resulted in the hard 
THE  
lining of the coastal edge with erosion protection.    
The proposed alignment options requires further reclamation within Mangere Inlet of up to 0.19 km2 (Option 
F) decreasing the inlet area by 3% and localised reclamation within Onehunga Bay of 0.0125 km2. Due to the 
scale and location of the proposed reclamations outlined in Options D, E and F the effects on coastal 
processes are expected to be negligible. However, some local morphological adjustment within Mangere 
Inlet is expected where the proposed reclamations encroach existing tidal channels. 
UNDER 
With reference to the status quo the relative effects on coastal processes are directly related to reclamation 
area, thereby resulting in the following ranking (lowest to highest effects): 
n   Option D 
n   Option F 
n   Option E 
INFORMATION 
It is recommended that irrespective of which option is selected that appropriate coastal erosion protection 
solutions are installed along the existing and/or future reclamation edge to minimise land loss and release of 
historic fill material to the CMA.  This would result in beneficial impacts overall on the shoreline edge. 
RELEASED 
 
 
OFFICIAL 
©Beca 2014. This proposal has been prepared by Beca Ltd (“Beca”) for  (“the Client”) and contains confidential information including the proposed methodology that is the property of Beca. The Client is 
permitted to use this information solely for the purpose of evaluating Beca’s suitability for providing the proposed services. The Client shall not disclose this information to any other person (other than 
to its partners officers advisors and employees on a strict “need to know” basis) and acknowledges that Beca will suffer a loss if this information is disclosed or used other than as set out above”. 
East West Connections: Coastal Process Assessment to Support Option Selection // 15 October 2014  // 1 


Introduction 

Introduction 
1.1 
The project 
The East West Connections project is responding to the immediate and growing freight access issues at 
either end of the Neilson Street/Church Street corridor caused by inefficient transport connections and a lack 
of response to changes in the industry’s supply chain strategies. The project is also addressing the 
inadequate quality of transport choices between Māngere, Ōtāhuhu and Sylvia Park.  
The long list of potential route options was developed in a 2-stage process. The option identification process 
began with identifying changes at a component level (e.g. lane widening; interchange improvements) across 
the geographical area. To ensure a full spectrum of components was considered, the study area was 
separated into segments and all components were then assessed through a multi-criteria analysis.  Where 
broadly equivalent components (in terms of either transport performance or social, environmental or cultural 
outcomes) were identified, the best alternative proceeded to the development of the long list options. If no 
broadly equivalent alternative component existed, the component was progressed to the development of 
long list options. All options were assessed through a multi-criteria analysis, which considered a full range of 
THE  ACT
impacts and performance against the project’s objectives and the East West Connections outcomes.  Six 
options were identified to progress to the short list for the Onehunga-Penrose connection.   
1.2 
The Options 
Of the shortlisted options, three of the six include encroachment into the Coastal Marine Area (CMA) and 
hence are subject to coastal processes.   
UNDER 
It is noted that Option C has a small portion skirting the edge of the coastal marine area at Ann’s Creek, and 
assessments of the following three options have regard to the same issues. 
The three options are:  
Option D (Long List Option 8):  Upgrade with Gloucester Park interchange and new Galway St and inland 
connections (refer to Drawing 3818663-08-1001 in Appendix 1). 
INFORMATION 
This option proposes an upgrade at Gloucester Park Interchange and a new connection from Onehunga 
Harbour Road to Galway Street. It also proposes an upgrade of Neilson and Angle Streets and Sylvia Park 
Road, and a new connection for Angle Street to Sylvia Park Road and to SH1. 
RELEASED 
The proposed option calls for a reclamation adjacent to Gloucester Park for the interchange and relocation of 
the Scott Club facilities.  The proposed reclamation area is approximately 12,500 m2 over a longshore 
distance of 450 m. 
Option E (Long List Option 13):  New foreshore Connection 
OFFICIAL 
This option proposes a new connection from SH20 to SH1 along the northern shoreline of Mangere Inlet 
(refer to Drawing 3818663-13-1001 to 3818663-13-1004 in Appendix 1).  The proposed option calls for the 
following: 
n  New interchange at SH20 at Gloucester Park with approximately 7,500 m2 of reclamation along 450 m of 
shoreline for road alignment and relocation of Scott Club facilities. 
n  New connection from Gloucester Park along foreshore to Great South Road, with local connections at 
Captain Springs Road, Southdown (Metroport) and Great South Road to connect (via intersection) onto 
Vesty Drive.  The road will require approximately 190,000 m2 (0.19 km2) of reclamation along 2.9 km of 
shoreline. 
East West Connections: Coastal Process Assessment to Support Option Selection // 15 October 2014  // 2 


Introduction 
n  New bridge from Vesty Road to provide new ramp connection to SH1 at Panama Road.  The proposed 
bridge extends past the outlet of Ann’s Creek.  
Option F (Long List Option 14): New foreshore and inland connection 
This option proposes a new connection from SH20 to SH1 partly along the foreshore and partly inland (refer 
to 3818663-14-1001 to 3818663-14-1004 in Appendix 1). The proposal calls for the following: 
n  New interchange at SH20 at Gloucester Park, with access to Neilson Street and onto Onehunga Harbour 
Road with approximately 7,500 m2 of reclamation along 450 m of shoreline. 
n  New connection from Gloucester Park along foreshore to Captain Springs Road with approximately 
110,000 m2 (0.11 km2) of reclamation along 1.7 km of shoreline and then inland to Great South Road. 
 
For the purposes of this report only the above options have been considered and hereon referred to as the 
“options”. 
1.3  Key design assumptions 
ACT
It is assumed that: 
THE  
n  The proposed seaward edge of the reclamation will be protected with a tipped rock revetment. 
n  Appropriate sea level rise levels will be accommodated in the design 
n  Along the north shore of Mangere Inlet the proposed design of the foreshore options E and F calls for an 
embankment approximately 60 metres wide to accommodate a four lane road carriageway and a shared 
path and cycle way with swales for stormwater treatment.  The embankment is separate from the existing 
foreshore and as such it will create an area between the two that can be used for additional treatment and 
UNDER 
containment of any leachate etc.   
n  The intended construction could include pre loading and in situ wick drainage to reduce long term 
settlement and the finished road carriageway elevation will be 4.5 m above mean sea level.  It is 
anticipated that some ‘headland’ features would be constructed to provide a more natural coastal edge.   
n  Existing drainage to the Mangere Inlet will be provided for using culverts. 
INFORMATION 
 
 
RELEASED 
OFFICIAL 
East West Connections: Coastal Process Assessment to Support Option Selection // 15 October 2014  // 3 














Site Description 

Site Description 
The project traverses the northern shores of Mangere Inlet and with proposed road alignments potentially 
affecting the northern shoreline of the Mangere Inlet and the shoreline west of Onehunga Port adjacent to 
Gloucester Park.    
2.1 
Physical Environment 
2.1.1 
Mangere Inlet 
Mangere Inlet is a rectangular shaped estuary comprising of 6.6 km2 of shallow tidal creeks and large 
expanses of intertidal mud flats. The northern shore of the inlet is highly modified due to port activities, 
roading and coastal reclamation.  This has led to the loss of three embayments at the inlets to historic 
streams, and also the loss of tidal inundation to the Hopua volcanic crater forming Onehunga Basin (Figure 
2.1).  The coastal edge is partially protected from erosion by tipped rock, vertical seawalls and engineered 
riprap revetments.     
THE  ACT
UNDER 
Onehunga Bay 
Ann’s Creek 
Mangere Inlet 
INFORMATION 
RELEASED 
 
Figure 2.1 – Changes in the northern shorelines between 1940 (shaded) and 2006. Source ARC (2009). 
OFFICIAL 
Ann’s creek remains in the northeast corner of the inlet, although it is highly modified with only a short 
section of open stream remaining.  Extensive reclamation along the eastern shore of Mangere Inlet was also 
carried out in the 1960’s, in relation to the development of the Westfield rail yards (ARC, 2009).   
The southern shore is less modified, with inlets to Harania and Tararata Creeks still largely intact, although 
the upper reaches of both creeks are dissected by high volume roads.  Both creeks are heavily forested with 
mangroves.   
2.1.2 
Onehunga Bay 
The development of SH20 and Mangere Bridge has resulted in the extensive reclamation to the west of 
Onehunga Port (refer to Figure 2.1).  The coastal fringe is lined with conventional sloping rock rip rap along 
East West Connections: Coastal Process Assessment to Support Option Selection // 15 October 2014  // 4 












Site Description 
the majority of SH20, with the slope varying from around 2.5(H):1(V) at the northern end to the Manukau 
Cruising Club, with larger diameter  rock and steeper slopes from the boat club to the Scout hall.   
An offshore rock breakwater is located immediately to the south of the boat club that provides a more 
sheltered environment to the seawall in this area. 
THE  ACT
UNDER 
 
Figure 2.2 – Gloucester Park coastal protection. Source: Northern Gateway Alliance (2006).  (It is noted that there is current reclamation 
being undertaken as part of the Onehunga foreshore beach construction project at present). 
2.2 
Coastal Processes 
INFORMATION 
2.2.1 
Water Levels 
Water levels throughout the project site are generally consistent apart from minor elevation of water levels 
within the Mangere Inlet due to the channel constriction at the Mangere Bridge.  Astronomical tidal levels and 
RELEASED 
extreme sea levels (NIWA, 2013) are presented in Table 2.1. 
Table 2.1 – Tidal Water Levels  
Water Level 
RL (m) 
100 yr 
3.00* 
OFFICIAL 
50 yr 
2.92* 
Highest Astronomical Tide (HAT) 
2.34 
Mean High Water Springs (MHWS) 
1.97 
Mean High Water Neaps (MHWN) 
1.12 
Mean Sea Level (MSL) 
0.22 
Mean Low Water Neaps (MLWN) 
-0.75 
Mean Low Water Springs (MLWS) 
-1.64 
Lowest Astronomical Tide (LAT) 
-2.08 
Source: NIWA(2013)* and Northern Gateway Alliance (2006). 
East West Connections: Coastal Process Assessment to Support Option Selection // 15 October 2014  // 5 






Site Description 
Future climate change is expected to increase still water levels with the latest guidance from MfE (2009) 
suggesting a minimum base level allowance on 0.5 m and a requirement to consider the consequence of a 
minimum sea level rise of 0.80 m by 2099.     
2.2.2 
Wind 
The prevailing surface wind direction as presented in Figure 2.3 is predominantly from the south-west (26%), 
west (10%) and from the north to north-east (24%).  The dominant winds speeds occur in the range of 2 to 4 
m/s (42%) while speeds in excess of 9 m/s occur for 15% of the time. Sustained winds over 15 m/s rarely 
occur (0.2%).  
THE  ACT
UNDER 
 
Figure 2.3 – Wind Rose from Auckland Airport (hourly data from 1996 to 2004) source: Northern Gateway Alliance, 2006. 
2.2.3 
Wave Climate 
Wave conditions within the Manukau Harbour are fetch limited and dominated by locally generated wind-
INFORMATION 
waves.  Onehunga Bay is exposed to a 17 km southwest fetch which corresponds to the prevailing wind 
conditions.  Within Mangere Inlet the wave climate is relatively benign with a maximum fetch of 3.5 km. 
In both areas the wave climate is dependent on water level with depth limited conditions and friction losses 
occurring as waves propagate across the intertidal flats. Nearshore seabed levels are approximately RL -
RELEASED 
0.4m with the majority of the shoals within Onehunga Bay situated at Mean Sea Level (MSL).  Typical 
significant wave heights (Hs), peak wave periods (Tp) and the percentage occurrence per year (%/yr) 
calculated via the Young and Verhagen method at MHWS are presented in Tables 2.2 and 2.3. 
Table 2.2 – Predicted Wave climate within Onehunga Bay 
OFFICIAL 
Wind Speed 
3 m/s 
7 m/s 
10 m/s 
15 m/s 
Direction 
Hs 
Tp 
%/y
Hs 
Tp 
%/yr 
Hs 
Tp 
%/yr 
Hs 
Tp 
%/yr 

0.06 
0.90 
7.00  0.15 
1.40 
2.00 
0.23 
1.70 
0.75 
0.36 
2.10 
0.25 
WSW 
0.11 
1.30 
9.00  0.29 
2.00 
10.0 
0.42 
2.40 
4.00 
0.64 
3.10 
3.00 
SW 
0.08 
1.10 
4.50  0.20 
1.60 
5.00 
0.29 
2.00 
2.50 
0.45 
2.40 
1.00 

0.06 
1.00 
4.00  0.17 
1.50 
2.00 
0.25 
1.80 
1.00 
0.38 
2.20 
0.25 
 
 
 
East West Connections: Coastal Process Assessment to Support Option Selection // 15 October 2014  // 6 


Site Description 
Table 2.3 – Predicted Wave climate within Mangere Inlet 
Wind Speed 
3 m/s 
7 m/s 
10 m/s 
15 m/s 
Direction 
Hs 
Tp 
%/y
Hs 
Tp 
%/yr 
Hs 
Tp 
%/yr 
Hs 
Tp 
%/yr 

0.06 
1.00 
7.00  0.13 
1.50 
2.00 
0.19 
1.80 
0.75 
0.28 
2.10 
0.25 
WSW 
0.08 
1.30 
9.00  0.18 
1.80 
10.0 
0.26 
2.10 
4.00 
0.38 
2.50 
3.00 
SW 
0.08 
1.30 
4.50  0.19 
1.90 
5.00 
0.27 
2.20 
2.50 
0.40 
2.60 
1.00 

0.06 
1.00 
4.00  0.13 
1.50 
2.00 
0.19 
1.80 
1.00 
0.28 
2.10 
0.25 
 
According to Tables 2.2 and 2.3 ambient wave conditions are generally less than 0.2 m and 0.3 m within 
Mangere Inlet and Onehunga Bay respectively the majority of the time. During extreme storm conditions 
significant wave heights of 1 m are likely within Onehunga Bay (Northern Gateway Alliance, 2006).  Within 
Mangere Inlet significant waves heights during storm events have the potential to reach 0.5 m.  
2.2.4 
Tidal Currents 
Tidal velocity information is available within the main channel adjacent to the Onehunga Wharf (NZ4314, 
THE  ACT
LINZ). The data suggests peak flood tide velocities of 1 m/s during springs tides and up to 0.6 m/s during 
neap tides.  During ebb tidal flows peak spring and neap tidal velocities of 0.80 m/s and 0.45 m/s 
respectively are expected.  
Observations from previous hydraulic investigations identified that on a flood tide there is a separation of 
flows at White Bluff due to a large shoal in this location.  One stream following the main channel and a 
second swinging into Onehunga Bay flowing around the bay approaching the wharf from the northwest.  
During ebb tides the flow is confined to the main channel (Northern Gateway Alliance, 2006). 
UNDER 
2.2.5 
Sedimentation 
Seabed sediments within the Mangere Inlet and Onehunga Bay are comprised of sandy mud with outcrops 
of gravelly sandy mud with areas of calcium carbonate in excess of 50% (ARC, 2009).  Suspended sediment 
rates are relatively high with a median of 26 mg/l with a long term range between 10 to 150 mg/l (ARC, 
INFORMATION 
2009).  Sedimentation concentration of up to 1 m a year have been observed at the Onehunga Port during 
annual maintenance dredging. 
ARC (2009) completed an assessment of sediment contamination throughout the Manukau Harbour and 
identified that the Mangere Inlet had the highest levels in the harbour of lead, copper and zinc.  Repeated 
RELEASED 
sampling between 1998 and 2007 has identified a trend of increasing zinc concentration and highly variable 
concentrations of copper and lead at the Mangere Cemetery and Ann’s Creek monitoring sites.  Sediment 
concentrations of other notable metal and organic contaminants were low relative to sediment quality 
guideline values at the Manukau State of the Environment (SoE) monitoring sites (ARC, 2009).  The 
exceptions were the Mangere Inlet monitoring sites adjacent to the Mangere Cemetary and Ann Creek that 
OFFICIAL 
include: 
n  dieldrin, which exceeds the ARCs environmental response criteria guideline value. 
n  DDT concentrations which are approaching Threshold Effects Level (ARC, 2009)  
n  arsenic, which exceeds ERL sediment quality guideline values (i.e. 8.2 mg kg-1). 
 
 
 
East West Connections: Coastal Process Assessment to Support Option Selection // 15 October 2014  // 7 


Assessment of Options 
    

Assessment of Options 
This assessment of options has only considered those options that impact on the foreshore.  Coastal 
process issues related to Option C are largely limited to the Gloucester Park and Ann’s Creek area and the 
following assessments of Options D, E and F address issues common to these areas. 
3.1  Assessment of Option D 
The potential impact on coastal processes is limited to the potential 12,500 m2 reclamation adjacent to 
Gloucester Park.  The proposal calls for a reclamation width of up to 40 m to accommodate the road 
alignment, car park and relocated Scott Club facilities including a boat ramp.   
The existing shoreline is partially protected by an offshore breakwater with the coastal edge protected by a 
tipped rock revetment.  In some areas construction rubble has been used as coastal armour (Northern 
Gateway Alliance, 2006). 
THE  ACT
Due to the limited seaward extent of the reclamation the impacts on coastal processes compared to the 
status quo are considered to be negligible.     
3.2  Assessment of Option E 
The potential impact on coastal processes includes similar reclamation at Gloucester Park described in 
Option D and a 0.19 km2 reclamation along the northern embankment of Mangere Inlet.  In order to preserve 
the environmental values of Ann’s Creek a piled bridge is proposed to connect Vesty Road to SH1 at 
UNDER 
Panama Road. 
Within Mangere Inlet the proposed reclamation is likely to reduce the inlet area by 3%.  As the proposed 
alignment options don’t restrict the main channel width the effects on tidal velocities and sedimentation are 
likely to be negligible.  The seaward edge of the reclamation will potentially be located in slightly deeper 
water thereby increasing the exposure to waves. However, due to the low wave climate (Section 2.2.3) the 
effects are expected to be low. It is noted that the eastern extent of the reclamation is likely to encroach into 
INFORMATION 
a channel that runs parallel to the northern edge of the inlet.  It is expected that following reclamation some 
morphological change may occur as the channel realigns.  
The proposed piled bridge section across Ann’s Creek is not expected to have significant effects on coastal 
processes.  Localised scour around piles is possible, however due to the expected low tidal velocities in the 
RELEASED 
area the impacts are likely to be minor.        
3.3  Assessment of Option F 
The potential impact on coastal processes includes similar reclamation at Gloucester Park described in 
OFFICIAL 
Option D and a 0.11 km2 reclamation along the northern embankment of Mangere Inlet. The proposed 
reclamation is likely to reduce the inlet area by 1.5% and similar to Option E the effects on coastal processes 
are likely to be negligible.   
Unlike Option E the proposed reclamation is unlikely to encroach the existing inlet channels and hence any 
morphological change is expected to be minimal. 
East West Connections: Coastal Process Assessment to Support Option Selection // 15 October 2014  // 8 


Assessment of Options 
3.4  Consideration of Climate Change 
All options will need to incorporate consideration of climate change issues associated with sea level rise.  
This is a design issue and the relevant consideration is construction of the chosen option accommodating 
accepted levels.  There may be some benefit from protection from inundation for landward properties arising 
from the construction of a foreshore option that accommodates climate change considerations. 
3.5  Mitigation Measures 
The following mitigation measures are suggested: 
n  Robust erosion protection solutions should be incorporated into the option development to ensure that the 
coastal edge is maintained to minimise the release of reclaimed fill to the CMA. 
n  The impacts of sea level rise should be addressed in the design which will dictate the setting of the road 
embankment level and slope of seaward erosion protection. 
 
 
THE  ACT
UNDER 
INFORMATION 
RELEASED 
OFFICIAL 
East West Connections: Coastal Process Assessment to Support Option Selection // 15 October 2014  // 9 


Conclusion and Recommendation 

Conclusion and Recommendation 
Only Options D, E and F have the potential to affect or be affected by coastal processes.  The remaining 
options are located outside the coastal marine area and therefore were not considered further (refer to notes 
in the text of this report regarding Option C).   
The proposed alignment options requires further reclamation within Mangere Inlet of up to 0.19 km2 
decreasing the inlet area by 3% and localised reclamation within Onehunga Bay of 0.0125 km2. Due to the 
scale and location of the proposed reclamations outlined in Options D, E and F the effects on coastal 
processes are expected to be negligible.  
With reference to the status quo the relative effects on coastal processes are directly related to reclamation 
area, thereby resulting in the following ranking (lowest to highest effects): 
n   Option D (lowest) 
n   Option F 
n   Option E (highest) 
THE  ACT
It is recommended that irrespective of which option is selected that appropriate coastal erosion protection 
solutions are installed along the existing and/or future reclamation edge to minimise land loss and release of 
historic fill material to the CMA.   Any option that tidies up the reclamation edge and provides better coastal 
erosion protection is considered to be positive. 
  
 
UNDER 
INFORMATION 
RELEASED 
OFFICIAL 
East West Connections: Coastal Process Assessment to Support Option Selection // 15 October 2014  // 10 


Bibliography 

Bibliography 
Auckland Regional Council (ARC), 2009: Environmental condition and values of Manukau Harbour. 
Reference December  TR 2009/112. 
MFE, 2009: Preparing for Coastal Change – a guide for local government in New Zealand. 
NIWA, 2013: Coastal Inundation by Storm-Tides and waves in the Auckland Region.  Prepared for Auckland 
Council. 
Northern Gateway Alliance, 2006: SH20 Manukau Harbour Crossing - S92 Response to ARC Coastal 
Processes.  Prepared for Transit New Zealand. 