RESOURCE CONSENTS SOUGHT UNDER THE FAST-TRACK 
APPROVALS ACT 2024 

In respect of the resource consents sought under the Resource Management Act 1991 
(“RMA”) through the fast-track application, the establishment, operation and rehabilitation 
of the BOGP must be considered against the rules and regulations of the following statutory 
planning documents: 
  Central Otago District Plan (“District Plan”); 
  Regional Plan: Water for Otago (“Regional Water Plan”); 
  Regional Plan: Air for Otago (“Regional Air Plan”); 
  Regional Plan: Waste for Otago (“Regional Waste Plan”); 
  Resource Management (National Environmental Standards for Freshwater) Regulations 
2020 (“Freshwater NES”); and 
  Resource Management (National Environmental Standard for Assessing and Managing 
Contaminants in Soil to Protect Human Health) Regulations 2011 (“NESCS”). 
The tables in the following sections set out each of the consents required for the BOGP as 
relevant to the Otago Regional Council – being the Regional Water Plan, Regional Air Plan, 
Regional Waste Plan and Freshwater NES – with a summary of the overall status of the 
proposed BOGP under the RMA presented at the end of this analysis. 
1. 
REGIONAL PLAN: WATER FOR OTAGO 
The following Tables 6 to 8 provide an analysis of the relevant rules in the Regional Water 
Plan relating to the activities associated with the BOGP.  This covers the following sections 
of the Regional Water Plan: 
  Chapter 12 – Water Take, Use and Management; 
  Chapter 13 – Land Use on Lake or River Beds or Regionally Significant Wetlands; and 
  Chapter 14 – Land Use other than in Lakes or River Beds. 
 
Matakanui Gold Limited – Bendigo-Ophir Gold Project 
Draft Rules Assessment for Fast-Track Application 

 
 


 
Table 1: 
Chapter 12 – Rules: Water Take, Use and Management 
Rule 
Activity Status 
Comment 
12.1 – The taking and use of surface water 
 
 
Rule 12.1.5.1 
Discretionary 
The proposed BOGP will involve the take 
and use of surface water from 
The take and use of surface water not provided for by other 
watercourses throughout the project site 
rules. 
during the construction and operation of 
the mining operations.  This take and 
diversion does not meet any of the 
permitted, controlled, restricted 
discretionary, non-complying or 
prohibited rules and therefore consent is 
required under this ‘catch all’ rule. 
12.2 – The taking and use of groundwater 
 
 
Rule 12.2.4.1(i) 
Discretionary 
The proposed groundwater take from the 
Bendigo Aquifer and for dewatering 
The take and use of groundwater not provided for by other 
purposes within the project site does not 
rules. 
meet any of the permitted, restricted 
discretionary, non-complying or 
prohibited rules and therefore consent is 
required under this ‘catch all’ rule. 
12.3 – The damming or diversion of water 
Matakanui Gold Limited – Bendigo-Ophir Gold Project 
Draft Rules Assessment for Fast-Track Application 

 
 


 
Rule 
Activity Status 
Comment 
Rule 12.3.4.1(i) 
Discretionary 
The damming and diversion of 
watercourses within the project site 
The damming or diversion of water outside the Waitaki 
associated with mining operations does 
catchment not provided for by other rules. 
not meet any of the permitted, restricted 
discretionary, non-complying or 
prohibited rules and therefore consent is 
required under this ‘catch all’ rule. 
12.A – Discharge of human sewage 
Rule 12.A.2.1 
Discretionary 
The discharge of human sewage through 
the on-site wastewater treatment plant 
The discharge of human sewage to water, or onto or into land in 
will not meet the permitted conditions in 
circumstances where it may enter water not provided for by 
Rule 12.A.1.4 as it will likely exceed 2000 
other rules. 
litres per day.  As such, it falls to be 
considered as a discretionary activity 
under this rule. 
12.B - Discharge of hazardous substances, hazardous wastes, specified contaminants, and stormwater; and discharges from industrial or trade 
premises and consented dams 

Rule 12.B.1.8 
Permitted 
For the parts of the project site that 
contain a reticulated stormwater system 
The discharge of stormwater from a reticulated stormwater 
these standards will be complied with. 
system to water, or onto or into land in circumstances where it 
may enter water, provided that: 
Matakanui Gold Limited – Bendigo-Ophir Gold Project 
Draft Rules Assessment for Fast-Track Application 

 
 


 
Rule 
Activity Status 
Comment 
(a)  Where the system is lawfully installed, or extended, after 
28 February 1998: 
(i)  The discharge is not to any Regionally Significant 
Wetland; and 
(ii)  Provision is made for the interception and removal of 
any contaminant which would give rise to the effects 
identified in Condition (d) of this rule; 
(b)  The discharge does not contain any human sewage; 
(c)  The discharge does not cause flooding of any other 
person’s property, erosion, land instability, sedimentation 
or property damage; 
(d)  The stormwater discharged, after reasonable mixing, does 
not give rise to all or any of the following effects in the 
receiving water: 
(i)  The production of any conspicuous oil or grease 
films, scums or foams, or floatable or suspended 
materials; 
(ii)  Any conspicuous change in the colour or visual 
clarity; 
(ii )  Any emission of objectionable odour; 
(iv)  The rendering of fresh water unsuitable for 
consumption by farm animals; or 
Matakanui Gold Limited – Bendigo-Ophir Gold Project 
Draft Rules Assessment for Fast-Track Application 

 
 


 
Rule 
Activity Status 
Comment 
(v)  Any significant adverse effects on aquatic life. 
Rule 12.B.1.9 
Permitted 
For the parts of the project site that 
contain a reticulated network, these 
The discharge of stormwater from any road not connected to a 
standards will be complied with. 
reticulated stormwater system to water, or onto or into land, 
provided that: 
To be confirmed against final Erosion and 
Sediment Control Plans to be prepared for 

(a)  The discharge does not cause flooding of any other 
whole site by EGL. 
person’s property, erosion, land instability, sedimentation 
or property damage; and 
(b)  Where the road is subject to works, provision is made for 
the interception of any contaminant to avoid, after 
reasonable mixing, the following effects in the receiving 
water: 
(i)  The production of any conspicuous oil or grease 
films, scums or foams, or floatable or suspended 
materials; 
(ii)  Any conspicuous change in the colour or visual 
clarity; 
(ii )  Any emission of objectionable odour; 
(iv)  The rendering of fresh water unsuitable for 
consumption by farm animals; or 
(v)  Any significant adverse effects on aquatic life. 
Matakanui Gold Limited – Bendigo-Ophir Gold Project 
Draft Rules Assessment for Fast-Track Application 

 
 


 
Rule 
Activity Status 
Comment 
Rule 12.B.3.1 
Restricted Discretionary 
The BOGP will involve the discharge of 
stormwater and associated contaminants 
The discharge of stormwater to water, or onto or into land in 
Matters of discretion: 
from diversion drains to land and / or 
circumstances where it may enter water, not provided for by 
  Any adverse effects of the discharge on 
water.  As such, consent is sought under 
other rules. 
(i) any natural and human use value 
this rule as a conservative approach to 
identified in Schedule 1 for any affected 
capture any discharges not provided for by 
water body, (ii) the natural character of 
other rules. 
any affected water body, (iii) any 
amenity value supported by any 
affected water body, and (iv) any 
heritage value associated with any 
affected water body; 
  Any effect on any Regionally Significant 
Wetland or on any regionally significant 
wetland value; 
  Any financial contribution for regionally 
significant wetland values or Regionally 
Significant Wetlands that are adversely 
affected; 
  The volume, rate and method of the 
discharge; 
  The nature of the discharge; 
  Treatment options; 
Matakanui Gold Limited – Bendigo-Ophir Gold Project 
Draft Rules Assessment for Fast-Track Application 

 
 


 
Rule 
Activity Status 
Comment 
  The location of the discharge point or 
area, and alternative receiving 
environments; 
  The likelihood of erosion, land 
instability, sedimentation or property 
damage resulting from the discharge of 
stormwater; 
  The potential for soil contamination; 
  The duration of the resource consent; 
  The information and monitoring 
requirements; 
  Any bond; 
  Any existing lawful activity associated 
with any affected water body; and 
  The review of conditions of the resource 
consent. 
Rule 12.B.4.3 
Discretionary 
The BOGP will involve the discharge of 
water and contaminants from diversion 
The discharge of water or any contaminant covered in section 
drains to land and / or water and the 
12.B.1 or 12.B.2, to water or onto or into land in circumstances 
discharge of contaminants from waste 
which may result in that water or contaminant entering water, 
rock stacks and tailing storage to land 
is a discretionary activity, unless it is: 
where contaminants may enter water. 
Matakanui Gold Limited – Bendigo-Ophir Gold Project 
Draft Rules Assessment for Fast-Track Application 

 
 


 
Rule 
Activity Status 
Comment 
(a)  Permitted by a rule in 12.B.1; or 
(b)  Provided for by a rule in 12.B.2, 12.B.3, 12.B.4.1 or 
12.B.4.2. 
12.C – Other Discharges 
Rule 12.C.3.2 
Discretionary 
The BOGP will involve the discharge of 
water and contaminants from various 
The discharge of water or any contaminant (i) to water, or (ii) 
activities (e.g. waste rock stacks and 
onto or into land in circumstances which may result in a 
tailing storage facilities and treated mine 
contaminant entering water that is not provided for by other 
water from the water treatment plant) to 
rules. 
land where it may enter water which is not 
covered by the rules listed. 
 
 
Matakanui Gold Limited – Bendigo-Ophir Gold Project 
Draft Rules Assessment for Fast-Track Application 

 
 


 
Table 2: 
Chapter 13 – Rules: Land Use on Lake or River Beds or Regionally Significant Wetlands 
Rule 
Activity Status 
Comment 
13.1 – The use of a structure  
 
 
Rule 13.1.2.1 
Restricted Discretionary 
Assume there will be culverts and other 
structures erected in the beds of streams 
The use of a structure that is fixed in, on, under or over the bed 
Matters of discretion: 
for crossings etc where the watercourses 
of any lake or river, or any Regionally Significant Wetland. 
  Any adverse effect on the function or 
are not fully reclaimed. 
structural integrity of the structure; 
  Any measures to avoid animal waste 
entering the lake, river, or Regionally 
Significant Wetland; 
  The duration of the resource consent; 
  The information and monitoring 
requirements; 
  Any insurance or other appropriate 
means of remedying the effects of 
failure; 
  Any bond; and 
  The review of conditions of the resource 
consent. 
13.2 – The erection or placement of a structure 
Matakanui Gold Limited – Bendigo-Ophir Gold Project 
Draft Rules Assessment for Fast-Track Application 

 
 


 
Rule 
Activity Status 
Comment 
Rule 13.2.3.1 
Discretionary 
Assume there will be culverts and other 
structures erected in the beds of streams 
The erection or placement of any structure fixed in, on, under 
for crossings etc where the watercourses 
or over the bed of any lake or river, or any Regionally Significant 
are not fully reclaimed. 
Wetland. 
13.5 – Alteration of the bed of a lake or river, or of a Regionally Significant Wetland 
Rule 13.5.3.1 
Discretionary 
The BOGP will involve the reclamation of 
several waterbodies within the project site 
The alteration of the bed of any lake or river not provided for by 
to develop mining operations. 
other rules. 
13.6 – The introduction or planting of vegetation 
 
 
Rule 13.6.2.1 
Permitted 
The proposed site rehabilitation works will 
likely include planting within 
The introduction or planting of any plant to or on the bed of any 
watercourses to restore or enhance 
lake or river for the purpose of remedying or mitigating the 
habitat that will not include crack or grey 
adverse effects of flooding, erosion, or non-point source 
willow (or any other pest plants) and will 
discharge of contaminants, or to restore or enhance habitat, 
meet the standards regarding 
provided that: 
sedimentation and flooding and erosion. 
(a)  Crack Willow Salix fragilis or Grey Willow Salix cinerea is 
 
not introduced to an area where it does not currently exist; 
(b)  The plant is not any pest plant listed in the Pest 
Management Strategy for Otago 2009; 
Matakanui Gold Limited – Bendigo-Ophir Gold Project 
Draft Rules Assessment for Fast-Track Application 
10 
 
 


 
Rule 
Activity Status 
Comment 
(c)  All reasonable steps are taken to minimise the release of 
sediment to the lake or river during the introduction or 
planting, and there is no conspicuous change in the colour 
or visual clarity of the water body beyond a distance of 100 
m downstream of the introduction or planting; 
(d)  The introduction or planting does not cause any flooding 
or erosion; and 
(e)  The site is left tidy following the introduction or planting. 
 
 
Matakanui Gold Limited – Bendigo-Ophir Gold Project 
Draft Rules Assessment for Fast-Track Application 
11 
 
 


 
Table 3: 
Chapter 14 – Rules: Land Use other than in Lake or River Beds 
Rule 
Activity Status 
Comment 
14.1 – Bore construction 
 
 
Rule 14.1.1.1 
Controlled 
Monitoring bores are proposed to be 
drilled at the Bendigo Aquifer.  In addition, 
The excavation, drilling or other disturbance of land, other than 
Matters of control: 
it is noted that Matakanui Gold Limit hold 
in the bed of any lake or river, for the purpose of creating a 
  The location of the bore including its 
an existing consent for abstraction bores 
bore. 
relationship to other bores and other 
proposed at the Bendigo Aquifer (refer to 
activities; 
Land Use Consent RM24.272.01). 
  The planned depth of the bore; 
  The management of the bore head and 
maintenance of the bore; 
  The nature of the bore; 
  The method of drilling or excavation; 
  The duration of the resource consent; 
  The information and monitoring 
requirements; 
  Any bond; and 
  The review of conditions of the resource 
consent. 
 
Matakanui Gold Limited – Bendigo-Ophir Gold Project 
Draft Rules Assessment for Fast-Track Application 
12 
 
 


 
Rule 
Activity Status 
Comment 
14.2 - Drilling 
Rule 14.2.2.1 
Controlled 
The BOGP will involve drilling associated 
with blasting activities over the Bendigo 
The drilling of land over an aquifer identified in the C-series 
Matters of control: 
Aquifer that will not mee the permitted 
maps, other than for the purpose of creating a bore and other 
  The potential for contamination of 
standards (Refer to Map C6 of Section C: 
than on the bed of any lake or river. 
groundwater; 
Aquifers, Groundwater Zones and 
  The location of the drilling; 
Groundwater Protection Zones). 

 
 
The planned depth of the drilling; 
  The management of the drill hole on 
completion; 
  The method of drilling; 
  The duration of the resource consent; 
  The information and monitoring 
requirements; 
  Any bond; and 
  The review of conditions of the resource 
consent. 
 
Matakanui Gold Limited – Bendigo-Ophir Gold Project 
Draft Rules Assessment for Fast-Track Application 
13 
 
 


 
2. 
REGIONAL PLAN: AIR FOR OTAGO  
The following table provides an analysis of the relevant rules and in the Regional Air Plan 
relating to the activities associated with the BOGP.  Part 4 of the Regional Air Plan contains 
the rules which are relevant to the Project. 
 
Matakanui Gold Limited – Bendigo-Ophir Gold Project 
Draft Rules Assessment for Fast-Track Application 
14 
 
 


 
Table 4: 
Rule Assessment for Regional Air Plan 
Rule 
Activity Status 
Comment 
Section 16.3.4 - Products of combustion from fuel burning equipment 
Rule 16.3.4.2 - Discharges from fuel burning equipment in Air Zone 3 
Permitted 
The mining operations at the project 
site will include the use of portable 
The discharge into air of products of combustion arising from fuel burning equipment 
generator sets for a range of activities 
(excluding domestic heating appliances) located on a site in Air Zone 3 which does not 
which will not exceed a heat generation 
exceed a heat generation capacity of 5MW (from single activities or a combination of 
capacity of 5MW, will not involve the 
activities located on one site) providing: 
burning of materials and will not result 
(a)  In the case of equipment installed after 28 February 1998, any chimney complies 
in any noxious, dangerous, offensive or 
with Schedule 6 (“Determination of Chimney Heights”); 
objectionable discharges. 
(b)  No material specified in Rule 16.3.3.1 is burnt; and 
In addition, it is noted that the gold 
(c)  Any discharge of smoke, odour, particulate matter or gases is not noxious, 
furnace at the processing plant will be 
dangerous, offensive or objectionable at or beyond the boundary of the property. 
electric. 
Section 16.3.5 – Discharges from industrial or trade processes 
Rule 16.3.5.7 – Discharges from petroleum and hydrocarbon processes 
Permitted 
Any discharges of hydrocarbons 
associated with the refuelling and 
The discharge of contaminants into air from: 
maintenance of trucks and machinery 
1.  The handling and purification by distillation of dry cleaning substances at retail 
within the project site are expected to 
outlets; 
comply with standards (3) and (4). 
2.  The handling and storage of hydrocarbons at service stations, bulk terminals and 
 
other facilities concerned with marketing and delivery of fuels and lubricants; 
Matakanui Gold Limited – Bendigo-Ophir Gold Project 
Draft Rules Assessment for Fast-Track Application 
15 
 
 


 
Rule 
Activity Status 
Comment 
3.  Processes not listed above that involve the handling and processing of 
hydrocarbons where the discharge from single activities or a combination of 
activities located on one site is less than 1 kg/hr of hazardous air contaminants, 
excluding Category A, B1 and B2 carcinogens as identified in Schedule 3; or 
4.  Processes not listed above that involve the handling and processing of 
hydrocarbons where the discharge from single activities or a combination of 
activities located on one site is less than 0.01 kg/hr of Category A, B1 and B2 
carcinogens as identified in Schedule 3; 
Provided that: 
  In the case of equipment installed after 28 February 1998, any chimney complies 
with Schedule 6 (“Determination of Chimney Heights”); and 
  Any discharge of odour or gases is not noxious, dangerous, offensive or 
objectionable at or beyond the boundary of the property. 
Rule 16.3.5.9 – Other discharges from industrial or trade processes 
Discretionary 
The BOGP will not meet the permitted 
standards for the discharge of 
The discharge of contaminants into air from industrial or trade processes that are not 
contaminants into air from mineral 
provided for under the other rules in section 16.3 of the Regional Air Plan. 
extraction and processing in Rule 
16.3.5.3 as the extraction of minerals 
from an open pit will exceed a rate of 
20,000 m3 per month and 100,000 m3 
per year. 
Section 16.3.10 – Water vapour, heat and energy 
Matakanui Gold Limited – Bendigo-Ophir Gold Project 
Draft Rules Assessment for Fast-Track Application 
16 
 
 


 
Rule 
Activity Status 
Comment 
Rule 16.3.10.1 – Discharges of steam or water vapour 
Permitted 
Any discharges of steam to air from the 
processing plant will meet these 
Except as provided for by the Rules in section 16.3.1 to 16.3.9, the discharge of 
conditions due to the rural and isolated 
condensed water vapour, including steam, into air provided that: 
location of the project site. 
(a)  Any plume does not impair visibility on any road or in any aircraft flight path; 
 
(b)  There is no drift of a noxious, dangerous, offensive or objectionable plume beyond 
the boundary of the property; and 
(c)  There is no venting of steam or water directly above footpaths or onto or over other 
properties. 
Rule 16.3.10.2 - Discharges of energy, including heat 
Permitted 
Any discharges of heat and energy to 
air from the processing plant, 
Except as provided for by the Rules in section 16.3.1 to 16.3.9, the discharge into air of: 
substation or any other activities within 
(a)  Air heated above ambient temperature, including but not limited to heated air 
the project site will fall to be 
from heat exchangers, and air used for the purpose of cooling plant and 
considered under this rule. 
equipment; 
(b)  Energy from sources of electromagnetic radiation, including radio and television 
transmitters and other telecommunications facilities, cell phones, and 
generators; or 
(c)  Heat generated by transmission lines and ancillary equipment. 
Section 16.3.13 – General Permitted Activities 
Rule 16.3.13.1 – Discharges from miscellaneous activities 
Permitted 
The construction and operation of the 
BOGP mining operations will include 
Matakanui Gold Limited – Bendigo-Ophir Gold Project 
Draft Rules Assessment for Fast-Track Application 
17 
 
 


 
Rule 
Activity Status 
Comment 
The discharge of contaminants into air from: 
the discharge of contaminants into air 
from vehicles, vehicle servicing 
1.  Vehicle engine maintenance and servicing; 
workshops, construction activities etc. 
2.  Building and construction activities, including road construction and 
maintenance, but excluding the remediation of asphalt surfaces (seal burning); 
3.  Any outdoor general engineering activity; 
4.  Using a smoke tracer to test underground drains or sewers; 
5.  Fertiliser application; 
6.  The engine exhaust of any motor vehicle, train or aircraft on an industrial or trade 
premises; or 
7.  Any smokeless heater frost-fighting device not using waste oil; 
Provided that any discharge of smoke, odour, particulate matter or gas is not noxious, 
dangerous, offensive or objectionable at or beyond the boundary of the property. 
 
Matakanui Gold Limited – Bendigo-Ophir Gold Project 
Draft Rules Assessment for Fast-Track Application 
18 
 
 


 
3. 
REGIONAL PLAN: WASTE FOR OTAGO  
The following table provides an analysis of the relevant rules in the Regional Waste Plan 
relating to the activities associated with the BOGP.  This covers the following sections of the 
Regional Waste Plan: 
  Chapter 5 – Contaminated Sites; 
  Chapter 6 – Hazardous Substances and Hazardous Wastes; and 
  Chapter 7 – Landfills. 
 
Matakanui Gold Limited – Bendigo-Ophir Gold Project 
Draft Rules Assessment for Fast-Track Application 
19 
 
 


 
Table 5: 
Rule Assessment for Regional Waste Plan 
Rule 
Activity Status 
Comment 
Chapter 5 – Contaminated Sites 
Rule 5.6.1 – Hazardous wastes at contaminated sites 
Discretionary 
Parts of the project site contain 
naturally elevated arsenic levels 
1.  The disturbance of land; 
which will be disturbed by mining 
2.  The discharge of hazardous waste into water; 
operations.  Further details on this 
3.  The discharge of hazardous waste onto or into land in circumstances that may 
contamination and how it will be 
result in that hazardous waste (or any other hazardous waste emanating as a result 
managed is provided in the 
of natural processes from that hazardous waste) entering water; 
Preliminary Detailed Investigation 
(Appendix X). 
4.  The deposit of any hazardous waste, in, on or under land; or 
5.  The discharge of hazardous waste into air at or from a contaminated site. 
Chapter 6 – Hazardous Substances and Hazardous Wastes 
Rule 6.6.1 - Operation of facilities for the treatment or disposal of hazardous wastes 
Discretionary 
The operation of the processing plant 
(discretionary activity) 
and discharge of tailings to land at 
the Shepherds TSF will include the 
1.  The discharge of any contaminant into or on to land; 
discharge of contaminants into land 
2.  The discharge of any contaminant into water; 
or water as a result of the treatment 
3.  The discharge of any contaminant into air; or 
and disposal of hazardous waste. 
4.  The discharge of water into water, 
 
In the course of, or as a result of, the treatment or disposal of hazardous wastes. 
Matakanui Gold Limited – Bendigo-Ophir Gold Project 
Draft Rules Assessment for Fast-Track Application 
20 
 
 


 
Rule 
Activity Status 
Comment 
Chapter 7 - Landfills 
Rule 7.6.1 - New or operating landfills (excluding cleanfill landfills, offal pits, farm 
TBC / Discretionary 
TBC - this rule is only relevant if the 
landfills and green waste landfills) 
BOGP includes the establishment of 
a landfill within the Engineered 
1.  The discharge of any contaminant into or onto land; 
Landform in the Shepherds Valley. 
2.  The discharge of any contaminant or water into water; or 
3.  The discharge of any contaminant into air, 
as a result of the operation of any landfill (except for a cleanfill landfill, offal pit, farm 
landfill, or green waste landfill) provided that no burning of waste is undertaken. 
 
 
Matakanui Gold Limited – Bendigo-Ophir Gold Project 
Draft Rules Assessment for Fast-Track Application 
21 
 
 


 
4. 
RESOURCE MANAGEMENT (NATIONAL ENVIRONMENTAL 
STANDARDS FOR FRESHWATER) REGULATION 2020 

The following table provides an analysis of the relevant rules in the Freshwater NES relating 
to the activities associated with the BOGP.  The relevant regulations that relate to freshwater 
(including natural inland wetlands, the reclamation of any streams or the placement of 
culverts in a stream) are covered in Part 3 of the Freshwater NES. 
 
Matakanui Gold Limited – Bendigo-Ophir Gold Project 
Draft Rules Assessment for Fast-Track Application 
22 
 
 


 
Table 6: 
Rule Assessment for the Freshwater NES 
Regulation 
Activity Status 
Comment 
Part 3: Subpart 1 – Natural inland wetlands 
Regulation 45D (1) 
Discretionary 
The valley floors and gully heads within 
the project site are expected to contain 
Vegetation clearance within, or within a 10 m setback from, a natural inland wetland for 
natural wetlands. 
the purpose of the extraction of minerals and ancillary activities. 
To be confirmed against final 
Terrestrial Ecology Assessment. 

Regulation 45D (2) 
Discretionary 
The valley floors and gully heads within 
the project site are expected to contain 
Earthworks or land disturbance within, or within a 10 m setback from, a natural inland 
natural wetlands. 
wetland for the purpose of the extraction of minerals and ancillary activities. 
To be confirmed against final 
Terrestrial Ecology Assessment.
 
Regulation 45D (3) 
Discretionary 
The valley floors and gully heads within 
the project site are expected to contain 
Earthworks or land disturbance outside a 10 m, but within a 100 m, setback from a 
natural wetlands. 
natural inland wetland that is (i) for the purpose of the extraction of minerals and 
ancillary activities and (i ) that results, or is likely to result, in the complete or partial 
To be confirmed against final 
drainage of all or part of the wetland. 
Terrestrial Ecology Assessment. 
Regulation 45D (4) 
Discretionary 
The valley floors and gully heads within 
the project site are expected to contain 
The taking, use, damming, or diversion of water within, or within a 100 m setback from, a 
natural wetlands. 
natural inland wetland that is (i) for the purpose of the extraction of minerals and 
Matakanui Gold Limited – Bendigo-Ophir Gold Project 
Draft Rules Assessment for Fast-Track Application 
23 
 
 


 
Regulation 
Activity Status 
Comment 
ancillary activities, (i ) there is a hydrological connection between the taking, use, 
To be confirmed against final 
damming, or diversion and the wetland and (iii) the taking, use, damming, or diversion 
Terrestrial Ecology Assessment. 
will change, or is likely to change, the water level range or hydrological function of the 
wetland. 
Regulation 45D (5) 
Discretionary 
The valley floors and gully heads within 
the project site are expected to contain 
The discharge of water into water within, or within a 100 m setback from, a natural inland 
natural wetlands. 
wetland that is (i) for the purpose of the extraction of minerals and ancillary activities, (i ) 
there is a hydrological connection between the discharge and the wetland, (iii) the 
To be confirmed against final 
discharge will enter the wetland and (iv) the discharge will change, or is likely to change, 
Terrestrial Ecology Assessment. 
the water level range or hydrological function of the wetland. 
Part 3: Subpart 2 – Reclamation of rivers 
Regulation 57 
Discretionary 
The establishment of mining 
operations in the project site will 
Reclamation of the bed of any river is a discretionary activity. 
include the reclamation of several 
watercourses, including sections of 
Rise and Shine Creek, Shepherds 
Creek and Jean Creek, and any other 
unnamed or ephemeral streams. 
Part 3: Subpart 3 – Passage of fish affected by structures 
Regulation 70 
N/A 
The watercourses within the project 
site have been confirmed to not 
Matakanui Gold Limited – Bendigo-Ophir Gold Project 
Draft Rules Assessment for Fast-Track Application 
24 
 
 




 
Regulation 
Activity Status 
Comment 
The placement, use, alteration, extension, or reconstruction of a culvert in, on, over, or 
provide habitat for any fish species (as 
under the bed of any river or connected area that complies with the following conditions: 
there is no above ground stream 
connection between the Lindis and 
  The culvert must provide for the same passage of fish upstream and downstream as 
Clutha Rivers).  As such, while culverts 
would exist without the culvert, except as required to carry out the works to place, 
will be proposed throughout the 
alter, extend, or reconstruct the culvert; 
project site, this regulation is not 
  The culvert must be laid parallel to the slope of the bed of the river or connected 
applicable as the structures will not 
area; 
affect fish passage. 
  The mean cross-sectional water velocity in the culvert must be no greater than that 
To be confirmed against final 
in all immediately adjoining river reaches; 
Freshwater Ecology Assessment. 
  The culvert’s width where it intersects with the bed of the river or connected area (s) 
 
and the width of the bed at that location (w), both measured in metres, must 
compare as follows: 
  where w ≤ 3, s ≥ 1.3 × w: 
  where w > 3, s ≥ (1.2 × w) + 0.6; and 
  The culvert must be open-bottomed, or its invert must be placed so that at least 
25% of the culvert’s diameter is below the level of the bed; 
  the bed substrate must be present over the full length of the culvert and stable at 
the flow rate at or below which the water flows for 80% of the time; and 
  The culvert provides for continuity of geomorphic processes (such as the movement 
of sediment and debris). 
Regulation 71 
Discretionary 
As above, the watercourses within the 
project site have been confirmed to not 
Matakanui Gold Limited – Bendigo-Ophir Gold Project 
Draft Rules Assessment for Fast-Track Application 
25 
 
 


 
Regulation 
Activity Status 
Comment 
The placement, use, alteration, extension, or reconstruction of a culvert in, on, over, or 
provide habitat for any fish species and 
under the bed of a river that does not comply with any of the conditions in regulation 
this regulation is therefore not 
70(2). 
applicable. 
To be confirmed against final 
Freshwater Ecology Assessment. 

 
 
Matakanui Gold Limited – Bendigo-Ophir Gold Project 
Draft Rules Assessment for Fast-Track Application 
26 
 
 


 
5. 
SUMMARY OF RESOURCE CONSENT REQUIREMENTS 
5.1 
REGIONAL PLAN: WATER FOR OTAGO 
Based on the analysis set out in Section 2 of this rules assessment, the following resource 
consents are required under the Regional Water Plan: 
  A water permit as a discretionary activity for the take and use of groundwater from the 
Bendigo Aquifer for water supply to support mining operations; 
  A water permit as a discretionary activity for the diversion, take and use of surface 
water during the construction and operation of mining operations; 
  A discharge permit as a restricted discretionary activity to discharge stormwater, 
water and associated contaminants to diversion drains to land and / or water; 
  A discharge permit as a discretionary activity to discharge contaminants from waste 
rock stacks and tailings storage to land where contaminants may enter water; 
  A discharge permit as a discretionary activity to discharge treated mine water from the 
water treatment plant to land and / or water; 
  A land use consent as a restricted discretionary activity to use structures (including 
culverts) in the bed of streams; 
  A land use consent as a discretionary activity to erect structures (including culverts) in 
the bed of streams; 
  A land use consent as a discretionary activity to alter / reclaim waterbodies within the 
project site to develop mining operations; 
  A discharge permit as a discretionary activity for the discharge of human sewage to 
water, or into or into land where it may enter water, from an on-site wastewater 
treatment plant that does not meet the permitted conditions; 
  A land use consent as a controlled activity for the construction of two bores; and 
  A land use consent as a controlled activity for the drilling of land over the Bendigo 
Aquifer. 
In summary, the overall activity status for the establishment of the BOGP under the Regional 
Water Plan is a discretionary activity
5.2 
REGIONAL PLAN: AIR FOR OTAGO 
Based on the analysis set out Section 3 of this rules assessment, the following resource 
consents are required under the Regional Air Plan: 
Matakanui Gold Limited – Bendigo-Ophir Gold Project 
Draft Rules Assessment for Fast-Track Application 
27 
 
 


 
  A discharge permit as a discretionary activity for the discharge of contaminants to air 
from the extraction and processing of mineral materials associated with the BOGP. 
The overall activity status for the establishment of the BOGP under the Regional Air Plan is a 
discretionary activity
5.3 
REGIONAL PLAN: WASTE FOR OTAGO 
Based on the analysis set out Section 4 of this rules assessment, the following resource 
consents are required under the Regional Waste Plan: 
  A land use consent as a discretionary activity for the disturbance of contaminated land 
due to naturally elevated levels of arsenic present within parts of the project site; and 
  A discharge permit as a discretionary activity for the discharge of contaminants into or 
onto land, into water or into air associated with the treatment or disposal of hazardous 
wastes from the processing plant and discharge of tailings into the Shepherds Tailings 
Storage Facility. 
  TBC on other discretionary consents relating to the establishment of a landfill 
The overall activity status for the establishment of the BOGP under the Regional Waste Plan 
is a discretionary activity
5.4 
RESOURCE MANAGEMENT (NATIONAL ENVIRONMENTAL STANDARDS FOR 
FRESHWATER) REGULATION 2020 

Based on the analysis set out in Section 5 of this rules assessment, the following resource 
consents are required under the NES Freshwater: 
  A land use consent as a discretionary activity for vegetation clearance and earthworks 
(for the purpose of the extraction of minerals and ancillary activities) within 10 m of a 
natural inland wetlands; 
  A land use consent as a discretionary activity for earthworks and land disturbance (for 
the purpose of the extraction of minerals and ancillary activities) within 100 m of natural 
inland wetlands that is likely to result in the complete or partial drainage of all or part of 
the wetland; 
  A discharge permit and water permit as a discretionary activity for the diversion and 
discharge of water (for the purpose of the extraction of minerals and ancillary activities) 
within 100 m of natural inland wetlands; and 
  A land use consent as a discretionary activity for the reclamation of the bed of a 
watercourse. 
Matakanui Gold Limited – Bendigo-Ophir Gold Project 
Draft Rules Assessment for Fast-Track Application 
28 
 
 


 
The overall activity status for the establishment of the BOGP under the NES Freshwater is a 
discretionary activity
5.5 
OVERALL ACTIVITY STATUS 
The overall activity status of the fast-track application for the establishment of the BOGP is 
discretionary activity
 
 
Matakanui Gold Limited – Bendigo-Ophir Gold Project 
Draft Rules Assessment for Fast-Track Application 
29 
 
 

Document Outline