Final allocative baselines for industrial allocation 
2024 

Key messages 
1.  This paper seeks your approval to issue drafting instructions to the Parliamentary 
Counsel Office to draft amendments to the Climate Change (Eligible Industrial Activities) 
Regulations 2010 to:  

update allocative baselines,  
ii 
revoke eligibility for two industrial activities, and 
iii 
update two activity descriptions.  
2.  Cabinet approved the delegation for issuing drafting instructions to you on 30 September 
2024 (CAB-24-MIN-0381 refers). 
3.  This briefing also seeks your approval to proactively release the associated Cabinet 
paper Progressing updates to industrial allocation in the emissions trading scheme, 
which you presented at Cabinet Economic Policy Committee on 25 September 2024, as 
well as the resulting minute of decision. No redactions are proposed. 
4.  The allocative baselines are listed in Appendix 1. These have been calculated from data 
provided over 2023 and 2024 from all firms receiving industrial allocation. The process of 
obtaining and reviewing submitted data was assisted by PWC. They include the latest 
information on the NZU price impact on electricity costs, as modelled by the Electricity 
Authority. Our data team have provided additional assurance reviews of calculations. 
5.  The allocative baselines for producing clay bricks and field tiles are unresolved. Historic 
data is being collected and reviewed from two manufacturers. We seek your approval to 
include the consequent allocative baselines in our drafting instructions. We will seek 
your approval of the allocative baselines and any minor policy changes needed for the 
drafting instructions before lodgement of the amendment regulations and Cabinet paper 
in November. 
6.  No data for production over 2016-2021 was received from firms in three activities. 

For the production of gelatine and the production of newsprint, because no data was 
also received in a call for projected data process, we recommend you set the 
respective allocative baselines to zero and revoke eligibility for the two activities. No 
firm is producing those products in New Zealand currently nor is expecting to in the 
future. The Climate Change Response Act 2002 requires a two-year delay before 
eligibility is revoked. 
ii 
For the production of carbon steel products, while no historic data was received, we 
recommend not amending the current baselines until a call for projected data is 
completed. We will provide further advice shortly. 
BRF-5270  
 


 
7.  We recommend you agree to amending the activity descriptions of producing carbamide 
(urea) and protein meal, as set out in Appendices 2 and 3. Data collected for the 
allocative baselines in Appendix 1 reflect the proposed new activity descriptions.  
Next steps 
8.  The amendment regulations need to be presented to Cabinet Legislation Committee 
before the end of November. This allows them to come into force from 1 January 2025 
and be implemented through the annual process of adjustments to provisional 
allocations. 
9.  The allocative baselines in Appendix 1 do not reflect recent policy decisions for NZ 
Steel’s use of cogenerated electricity or upcoming decisions on NZAS’s electricity 
contracts. Those decisions will take effect through setting unique allocative baselines in 
March 2025, which are developed once electricity consumption data for 2024 is received 
from both firms. Those unique allocative baselines will result in adjustments to 2024 
provisional allocations, in the same process as the rest of the new baselines. 
10.  The Cabinet paper notes you will contact the CEO of NZ Steel following Cabinet 
decisions. We will hold back the proactive release of the Cabinet paper and minute until 
this has occurred. 
Recommendations 
We recommend that you 
a. 
Agree to instruct Parliamentary Counsel Office to draft amendments to 
Yes | No 
the Climate Change (Eligible Industrial Activities) Regulations 2010 to 
prescribe the allocative baselines for 2024 as set out in Appendix 1 
b. 
Agree to instruct Parliamentary Counsel Office to draft amendments to 
 
the Climate Change (Eligible Industrial Activities) Regulations 2010 to 
revoke the eligibility for industrial allocation from 1 January 2027 for the 
production of 
 
i.  gelatine  
Yes | No 
 
ii.  newsprint 
Yes | No 
d. 
Agree to instruct Parliamentary Counsel Office to draft amendments to 
Yes | No 
the Climate Change (Eligible Industrial Activities) Regulations 2010 to 
amend the activity description of producing carbamide (urea) as per 
Appendix 2 
e. 
Agree to instruct Parliamentary Counsel Office to draft amendments to 
Yes | No 
the Climate Change (Eligible Industrial Activities) Regulations 2010 to 
amend the activity description of producing protein meal as per 
Appendix 3 
f. 
Agree the instructions to Parliamentary Counsel Office in 
Yes | No 
recommendation (a) can include the final allocative baselines for 
producing clay bricks and field tiles once calculated by officials following 
BRF-5270  
 


 
the formula set out in section 161C(2) of the Climate Change Response 
Act 2002 

Agree minor policy changes can be reflected in the drafting instructions   Yes | No 
h. 
Note your agreement to the allocative baselines for producing clay 
 
bricks and field tiles and any minor policy changes will be sought before 
the amendment regulations are presented to Cabinet 
i. 
Agree to proactively release the Cabinet paper Progressing updates to 
Yes | No 
industrial allocation in the emissions trading scheme (Appendix 4) and 
minute of decision (Appendix 5) following your conversation with NZ 
Steel. 
Signatures  
 
 
Mark Vink 
Hon Simon WATTS  
General Manager, Markets 
Minister of Climate Change 
Date 
Date 
 
BRF-5270  
 


 
Final allocative baselines for industrial allocation 
2024 

Purpose 
1.  This paper seeks your approval to  

Issue drafting instructions to PCO to draft amendments to the Climate Change 
(Eligible Industrial Activities) Regulations 2010 to update allocative baselines, 
revoke eligibility for two industrial activities, and update two activity descriptions. 
ii 
Proactively release the Cabinet paper Progressing updates to industrial allocation in 
the emissions trading scheme 
and minute of decision. 
2.  Broadly, the drafting instructions we seek your approval for follow directly from the 
Cabinet approval of the policy and there is limited judgement involved. However, there 
are four areas where we are seeking judgements from you: 

Gelatine and newsprint: we recommend that the eligibility of these activities is 
revoked in addition to setting their baselines at zero. 
ii 
Carbon steel from cold ferrous feed: we recommend that you do not update the 
existing baseline for this activity due to a separate process calling for projected data 
being underway. 
iii 
Clay bricks and field tiles: we recommend that you authorise us to continue to collect 
data about these activities and build that additional data into the drafting instructions 
we give to Parliamentary Counsel Office.  
iv 
Carbamide (urea) and protein meal: we recommend updates to the descriptions of 
these activities in regulations. 
Updates to allocative baselines 
3.  The allocative baselines in Appendix 1 represent the emissions per unit of production 
over 2026/17 to 2020/21 for each product in eligible industrial activities. They are 
weighted averages if there is more than one firm.  
4.  Data was collected and reviewed from late 2023 to early 2024. PWC was contracted to 
provide support to firms and to ensure data quality. Provisional allocative baselines were 
emailed to firms on 27 July 2024. The 2024 electricity allocation factor was then applied, 
resulting in slightly higher final allocative baselines. Our data team has provided 
additional tests of the calculations for assurance purposes. 
5.  A special process will be followed to adjust baselines early in 2025 for producing 
aluminium and for producing iron and steel from ironsand. Those adjustments are 
necessary to ensure the 2024 allocations to firms represent actual emission costs from 
consuming electricity under particular contracts. The baselines are updated from 
BRF-5270  
 


 
obtaining electricity consumption data in January then amending regulations in late 
March. 
Data was not collected for three activities 
Gelatine and newsprint 
6.  No firms were found to be producing gelatine or newsprint over 2016/17 to 2020/21. The 
appropriate baselines for the products in those activities are therefore zero, as there was 
no emissions or production.  
7.  We are mindful that a new entrant could restart the production of such products in the 
future and seek industrial allocation. The Act allows for new entrants to receive industrial 
allocation if tests are met, such as the prospective baseline must be lower than the 
current prescribed one. The setting of baselines at zero will make it very unlikely that the 
tests can be met by a new entrant.1 This means industrial allocation will be unlikely.  
8.  The requirements on any new entrants in the production of gelatine or newsprint to gain 
an industrial allocation would be much lower if the activity classes were removed from 
the regulations. The new entrant would then apply for eligibility as a new activity and not 
be bound by the constraint on increasing an existing baseline.  
9.  Decisions on eligibility were not possible from the 2026/17 to 2020/21 data collection 
process.2 Therefore, in order to provide you with the opportunity to revoke eligibility, we 
initiated a projected data collection process. Notices were issued seeking data from 
anyone considering starting either of the two activities in the next few years. No data 
was received. This allows you to decide if eligibility should be revoked. 
10.  To revoke eligibility, you must be satisfied the activity is either no longer moderately or 
highly emissions intensive, or trade exposed.3 Due to the absence of data on the 
emissions intensity of the activities, we consider this test is met. 
11.  Revoking eligibility takes effect at least two years following the publication of the 
regulation.4 We recommend that eligibility is revoked through amendment regulations 
that take effect from 1 January 2027. 
Carbon steel from cold ferrous feed 
12.  Data was also not collected from any person producing carbon steel from cold ferrous 
feed. This is the eligible activity that NZ Steel will use for electric arc furnace production.  
13.  We recommend not amending the existing baseline for that activity at this stage. A call 
for projected data is planned, enabling allocative baselines to be developed for the 
regulations. We are consulting on changes to the activity description and changing the 
 
1 Section 161A(3A)(c) 
2 Schedule 1AA Part 41 
3 Section 161A(3) 
4 Section 161A(5)(a) 
BRF-5270  
 


 
data collection forms to enable this call for projected data. NZ Steel has been engaged 
in that consultation process. 
14.  Even though no data was collected from 2016/17 to 2020/21 for the activity, that does 
not compel you to set the baseline at zero at this stage.   
15.  We expect to seek your approval to the update to the activity description of this activity 
and to issue the Gazette notice calling for projected data by the end of October. 
Data from clay bricks and field tile producers is not yet final 
16.  PWC contacted producers of clay bricks and field tiles but did not receive any response. 
We made our own enquiries in preparing for a call for projected data exercise and found 
two small producers. Data is being sought and assessed from those producers, but this 
process has not been completed yet. The table in appendix one contains ‘to be 
determined’ as entries against allocative baselines.  
17.  We seek your approval to a flexible approach to the updating of the clay brick and field 
tile allocative baselines. Cabinet agreed the changes would enter into force from 1 
January 2025 and be applied to final 2024 allocations. Holding back the full set of 
drafting instructions so that clay brick and field tile calculations could be made and 
added would make that timetable unachievable.  
18.  We will include the allocative baselines in our drafting instructions once they are 
calculated. Your formal approval of the respective allocative baselines and any broader, 
but still minor, policy changes will be sought when we provide the draft Cabinet 
Legislation Committee paper to you for feedback in November 2024. We will follow the 
required formula in section 161C(2) of the Act to determine the allocative baseline, 
exactly the same as the other allocative baselines. 
Updates to two activity descriptions  
19.  Consultation on changes to the activity descriptions for producing carbamide (urea) and 
protein meal was performed prior to the collection of 2016/17 to 2020/21 data. 
Engagement feedback from affected firms as wel  as Iwi/Māori was supportive. 
20.  Regulations did not need to be amended to collect that data. The allocative baselines in 
Appendix 1 were developed from data collected under the proposed new activity 
descriptions. The proposed new activity descriptions are in Appendix 2 and 3. 
Production of protein meal  
21.  The existing activity description for protein meal does not include tallow as a co-product 
as this was left out as an oversight when the regulations were drafted. The existing 
activity description needs to be updated to improve the future accuracy of allocations.  
22.  Without this change, there is a risk of under-allocating to firms producing protein meal as 
emissions from tallow production would not be included if there was another data 
collection process. This update is minor and consists of adding a line to the existing 
description. 
BRF-5270  
 


 
Production of carbamide (urea)  
23.  Ballance Agri-Nutrients Ltd (Ballance) is currently the only firm producing urea in New 
Zealand. They manufacture three liquid urea products that they do not receive an 
allocation for at present.  
24.  The liquid urea products do not contain a high enough concentration of urea to meet the 
concentration test in the existing activity description in regulations. The existing activity 
description needs to be amended to allow the urea solution products to be listed as 
eligible.  
25.  The impact that adding these products will have on current allocation levels is minor and 
will be outweighed by the reduction in allocation levels resulting from the new allocative 
baseline for urea production.  
Proactive release of Cabinet paper and minute 
26.  We seek your agreement to proactively release the Cabinet paper in Appendix 4 and the 
minute of decision in Appendix 5. No redactions are proposed. 
27.  The Cabinet paper notes you will contact the CEO of NZ Steel following Cabinet 
decisions. We will not publish the Cabinet paper or minute until you have done so. 
28.  The Cabinet paper and minute will be published alongside the final allocative baselines 
for 2024 as well as the provisional baselines that were emailed to firms in July. Those 
provisional baselines were requested under the Official Information Act 1982 and our 
response noted an intention to publish them on our website following Cabinet decisions. 
We have performed a commercial sensitivity test with all firms. Visy Glass asked their 
provisional allocative baseline be withheld, which we will do. 
Te Tiriti analysis 
29.  No Tiriti issues are associated with the proposals in this briefing 
Other considerations 
Legal issues 
30.  Cabinet approved the delegation for issuing drafting instructions to you on 30 September 
2024 (CAB-24-MIN-0381 refers). 
31.  Your decisions in this briefing will support our development of drafting instructions to the 
Parliamentary Counsel Office. We have engaged with the PCO to ensure they can draft 
the amendment regulations in order for presentation to Cabinet Legislation Committee in 
November. 
BRF-5270  
 


 
Next steps 
32.  We will issue drafting instructions as soon as we receive your direction through this 
briefing. We will add the final clay brick and field tile allocative baselines to those 
instructions once determined. 
33.  We will publish the allocative baselines, Cabinet paper and minute after your 
communication with NZ Steel.  
34.  A draft Cabinet Legislation Committee paper is being prepared and is timed for 
consideration on 21 November 2024. We will provide your office with a draft by mid-
October to ensure sufficient time for your and Ministerial consultation. 
35.  We will seek your approval to proactively release the following Cabinet papers, with 
appropriate redactions, in late October as a package: 

New Zealand Aluminium Smelter electricity allocation factor update5  
ii 
Amendments to the New Zealand Emissions Trading Scheme regulations6 
36.  Other upcoming industrial briefings are: 

9(2)(f)(iv)
 
 
ii 
Issuing calls for electricity consumption data from the production of iron and steel 
from iron-sand and from the production of aluminium – mid December 
 
 
 
5 Expected to be considered by Cabinet in mid-October 
6 Considered by Cabinet Legislation Committee on 19 September 2024 
BRF-5270  
 


 
Appendix 1: Final allocative baseline values for 2024 
Baseline 
Baseline for 
currently in 
regulation 
Activity  
Product   regulations  
amendments 
Aluminium smelting 

10.1304 
10.2511 
Manufacture of carbon steel from cold ferrous feed 

0.3693 
No change 
Manufacture of carbon steel from cold ferrous feed 

0.1470 
No change 
Manufacture of carbon steel from cold ferrous feed 

0.0940 
No change 
Manufacture of iron and steel from iron sand 

3.2613 
3.1783 
Manufacture of iron and steel from iron sand 

0.1190 
0.1422 
Manufacture of iron and steel from iron sand 

0.2800 
0.2077 
Manufacture of iron and steel from iron sand 

0.1630 
0.1839 
Manufacture of iron and steel from iron sand 

0.1493 
0.1592 
Manufacture of iron and steel from iron sand 

0.1470 
0.1654 
Production of burnt lime 

1.4115 
1.3012 
Production of carbamide (urea) 

1.6245 
1.6151 
Production of carbamide (urea) 

 
1.5580 
Production of cartonboard 

1.1783 
0.7434 
Production of cartonboard 

0.4784 
0.6461 
Production of cartonboard 

0.3377 
0.0754 
Production of caustic soda 

1.5926 
1.4953 
Production of cementitious products 

0.9615 
0.8300 
Production of cementitious products 

0.0234 
0.0235 
Production of clay bricks and field tiles 

0.2264 
TBD 
Production of clay bricks and field tiles 

0.8813 
TBD 
Production of clay bricks and field tiles 

0.2227 
TBD 
Production of cut roses 

0.000991 
0.0004 
Production of ethanol 

1.5076 
1.8715 
Production of fresh capsicums 

3.6064 
3.0098 
Production of fresh cucumbers 

3.4461 
0.7713 
Production of fresh tomatoes 

2.6006 
1.4963 
Production of gelatine 

6.4607 

Production of glass containers 

0.5946 
0.6125 
Production of hydrogen peroxide 

1.395 
1.2859 
Production of lactose 

1.4323 
1.3081 
Production of market pulp 

0.6215 
0.7320 
Production of market pulp 

1.3812 

Production of market pulp 

1.0463 
0.8293 
Production of methanol 

0.7854 
0.8191 
Production of newsprint 

0.5035 

Production of newsprint 

1.3662 

BRF-5270  
 
10 

 
Production of packaging and industrial paper 

0.4657 
0.5419 
Production of packaging and industrial paper 

0.5171 
0.5267 
Production of packaging and industrial paper 

0.0961 
0.1109 
Production of protein meal 

0.9360 
1.1288 
Production of reconstituted wood panels 

0.2134 
0.2089 
Production of tissue paper 

1.2176 
0.8651 
Production of tissue paper 

0.7896 

Production of whey powder 

0.8526 
0.6377 
 
 
 
BRF-5270  
 
11 

 
Appendix 2: Changes to the activity description of producing 
of carbamide (urea) 

1.  Change the existing product into two products A and B: 
 
A.  total tonnes of dry-weight carbamide (CO(NH2)2 urea) in high concentration products; 
B.  total tonnes of dry-weight carbamide (CO(NH2)2 urea) in low concentration products 
 
2.  And define these as 
High  concentration  products  means  products  where  the  concentration  of  carbamide 
(CO(NH2)2, urea) is greater than or equal to 80% with respect to mass. 
Low  concentration  products  means  products  where  the  concentration  of  carbamide 
(CO(NH2)2, urea) is between 31% and 41% with respect to mass. 
3.  Change the activity description to accommodate those products: 
Activity  means  the  production  of  carbamide  (urea)  by  the  chemical  transformation  of 
hydrocarbons  (or  other  hydrogen  and  carbon  feedstocks)  and  nitrogen  to  produce 
carbamide  solutions  (CO(NH2)2(aq),  urea),  where  the  concentration  of  carbamide 
(CO(NH2)2, urea) is is greater than or equal to 80% with respect to mass, where the outputs 
include:  
(a) carbamide solutions (CO(NH2)2(aq), urea); and/or 
(b) saleable granulated, prilled or other solid forms of carbamide (CO(NH2)2(s), urea). 
 
 
 
 
BRF-5270  
 
12 

 
Appendix 3: Changes to the production of protein meal 
1.  Amend the activity description by adding B as below: 
 
Activity means the physical and chemical transformation of raw livestock-derived animal 
material into: 
A.  protein meals (such as meat and bone meal, dried blood and feather meal) which 
must have a moisture content of 10% or less; and 
B.  tallow co-products. 
 
 
BRF-5270  
 