This is an HTML version of an attachment to the Official Information request 'Plan'.









SS
SS
W
W
W
W
W W
W
SW
SW
SS
TO FRUITVALE
TO GLEN EDEN
W
W
SS
GAS
GAS
W
SS
SW
SW
W
W
SW
SS
W
SS
GAS
W
W
PROVIDE 2X100Ø ADDITIONAL DUCTS
SW
ALONGSIDE EXISTING FIBRE, REFER TO
GAS
GAS
SS
DETAIL R ON DRG-NAL-CV-DT-0611-01
SW
SS
GAS
!
SW
SW
SW
W
SW
SW
REMOVE REDUNDANT OLE MAST, FOUNDATION AND ANCHOR
SW
SS
SW
!
FOLLOWING OLE CROSSOVER COMMISSIONING. FOUNDATION
SW
SW
SS
TO BE CUT DOWN TO PREFERRED 1.5m DEPTH BELOW TOP OF
W
SW
GAS
GAS
2X65Ø SUB DUCTS TO
GAS
RAIL, CONTRACTOR TO NOTIFY KIWIRAIL IF NOT ACHIEVABLE
GAS
PROVIDE 2X100Ø ADDITIONAL
SWALE
GAS
W
GAS
KM21750 L216 AX2
SS
GAS
GAS
DUCTS ALONGSIDE EXISTING
GAS
GAS
FIBRE, REFER TO DETAIL B
PROVIDE 2X100Ø ADDITIONAL
ON DRG-NAL-CV-DT-01592-01
GAS
NAL 021/35 3.0m OFFSET PROVIDED TO FACE OF
W
W
SS
SW
DUCTS. CONNECTION PIT TO BE
SS
MAST. LOCATE SERVICES CONDUCTS AND ADJUST
POND
GAS
EXISTING
DETERMINED ON SITE IN
SW
21650.000
21700.000
21750.000
LOCALLY PRIOR TO CONSTRUCTION OF FOUNDATION.
21800.000
GAS
POND
DISCUSSION WITH KIWIRAIL.
WEST COAST ROAD
GAS
4X65Ø SUB DUCTS 2871A:
SW
GAS
W
1X65Ø TO KM21701
1X65Ø TO KM21702
GAS
W
SS
SW
1X65Ø TO KM21706
SW
GAS
1X65Ø TO KM21707
NAL 021/31A 3.6m OFFSET
REFER TO DETAIL N ON
PROVIDED TO FACE OF MAST
W
DR-NAL-CV-DT-01584-01
SW
O P
Kiwirail Signal Cable
P
O
O
P
O
P
P
O
P
P
O
W
P
O
P O
P
MUSHROOM
SWALE
SWALE
P
Kiwirail Signal Cable
P
P
P
Kiwirail Signal Cable
P
P
P
Kiwirail Signal Cable
P
Kiwirail Signal Cable
Kiwirail Signal Cable
P
P
P
P
P
P
P
P O
SS
SW
P
SWALE
P
P
UP MAIN
W
SW
BRIDGE
L.O.W.
W
WEST COAST ROAD
SS
SW
SW
W
P
P
GAS
P
P
P
P
P
P
P
W
DOWN MAIN
O
O
O
O
SWALE
P
P
P
P
P
SW
P
W
SS
NEW UTX 2X100Ø DUCTS, REFER
REMOVE REDUNDANT OLE MAST,
TO UNDERTRACK TYPICAL DETAIL L
GAS
FOUNDATION AND ANCHOR
ON DRG-NAL-CV-DT-01584-01
SW
W
PROVIDE NEW SIGNALING PIT 3.0m MIN.
FOLLOWING OLE CROSSOVER
SUB STATION
WEST COAST ROAD
GAS
W
GAS
SW
21650.000
FROM TRACK CL. PIT TO BE 1200X600
21700.000
21750.000
21800.000
COMMISSIONING. FOUNDATION
EXISTING POWER CABLE WITHIN BALLAST TO BE
SS
EXISTING FIBRE OPTIC CABLE
CONCRETE ROADWAY STRENGTH.
TO BE CUT DOWN TO PREFERRED
RELOCATED DUE TO SHALLOW EXISTING DEPTH
SW
TO BE RELOCATED PRIOR TO
CONTRACTOR TO PROVIDE TEMPORARY
1.5m DEPTH BELOW TOP OF RAIL,
W
COMMENCEMENT OF WORKS.
SHORING TO THE DEPTH OF THE PIT
CONTRACTOR TO NOTIFY
DURING EXCAVATION.
GAS
GAS
KIWIRAIL IF NOT ACHIEVABLE
!
SID-006
1X65Ø SUB DUCT TO KM21701 APPROX.
NAL 021/ 34 3.3m OFFSET SW
PROVIDED TO FACE OF MAST
W
GAS
GAS
SW
SS
SW
OLE FOUNDATIONS AND DUCTING PLAN SHEET 1 OF 2
Scale 1:250
LEGEND
GENERAL
OLE FOUNDATIONS - EXISTING
TRACK CENTRELINE - PROPOSED
OLE FOUNDATIONS
SURVEYED RAIL
ANCHOR FOUNDATIONS
SURVEYED FEATURES
L.O.W.
LIMIT OF FORMATION WORKS
RAIL INFRASTRUCTURE - EXISTING
MUSHROOM
SERVICES - EXISTING
BALISE
SW
STORMWATER PIPE/CULVERT
DUCTING PIT - EXISTING
W
WATERMAIN
SS
WASTEWATER
DUCTING PIT
P
POWER
SERVICES - PROPOSED
O
FIBRE OPTIC
GAS
GAS / FUEL MAIN
KiwiRail Signal Cable
CABLE DUCTING
DUCTING PIT
DRAINAGE - EXISTING
!
!
!
!
!
OLE FOUNDATIONS - PROPOSED
CESS DRAIN
OLE FOUNDATIONS
ANCHOR FOUNDATIONS
NOTES:
1.
REFER TO DRG. DR-NAL-CV-GN-01574-01 FOR GENERAL NOTES.
2.
REFER TO CV-SD-SRA-00009 FOR SAFETY IN DESIGN REGISTER.
3.
DUCTING DESIGN SHOWN IS AS PER "RNGIM DUCTING V0.3.PDF", RECEIVED ON 12/11/2024 AND COMPLETED BY OTHERS.
4.
SUB-DUCTS NOT SHOWN FOR CLARITY.
5.
ALL PROPOSED DUCTS TO BE DRAW TAPED.
0
6.25
12.5
m
FOR CONSTRUCTION
1:250
CONSULTANT/CONTRACTOR:
KEYPLAN
REV
REVISION PARTICULARS
DRAWN
DATE
INITIALS
DATE
RNR
0.1
100% DESIGN FOR CLIENT REVIEW
LF
19/11/2024
DESIGNED
LF
19/11/2024
WO - 601101-55
APPROVED BY :
1.0
ISSUE FOR CONSTRUCTION
NY
16/12/2024
DRAWN
AO
19/11/2024
Copyright : "This drawing is and shall remain the property of KiwiRail Holdings Limited (KHL)
DATE :
CONTROLLED DOCUMENT
CHECKED
VA
19/11/2024
GLEN EDEN CROSSOVER
UNCONTROLLED WHEN PRINTED
APPROVED
TR
19/11/2024
Verify you are using the most recent version prior to use (Refer Kiwi Rail's Intranet)
NAL 21+700 TO 21+925
DRAWING No.
Original
Std Rev  No:
A1
1.0
Holders of printed versions are responsible for ensuring personal copies are kept up to date.
LINE: NAL
Km: 21+700 TO 21+925
Digital Data in Terms of .................................................... Co
NZGD2K.MOUNT EDEN
ordinate system.
DUCTING LAYOUT SHEET 1
C:\projectwise\nz_projects\global_jasmine.sim\d0168570\DR-NAL-CV-GA-01580-01.dwg  16-12-24  08:11 PM  Jasmine.Sim
SCALE:  1:250
Sht  No:
DR-NAL-CV-GA-01580-01
1











SS
SS
SW
SS
SS
TO FRUITVALE
TO GLEN EDEN
SS
SW
SWALE
! ! !
!
!
SS
!
SS
!
SW
! !
5X65Ø SUB DUCTS 2780CD:
1X65Ø TO KM21922 (AX)
PROPOSED LOCATION CASE
SWALE
1X65Ø TO KM21918
L220 SLAB FOOTPRINT
!
REFER TO DR-NAL-CV-GA-01580-01 FOR CONTINUATION
!
1X65Ø TO KM2917
1X65Ø TO KM2913
SW
MASS BLOCK RETAINING WALL,
REMOVE REDUNDANT OLE MAST,
REFER TO NOTE 6
FOUNDATION AND ANCHOR IN ACCORDANCE
!
1X65Ø TO KM21912
REFER TO DETAIL N ON DR-NAL-CV-DT-01584-01
NAL 021/43 3.0m OFFSET PROVIDED TO
FACE OF MAST. DRAINAGE TO BE LOCALLY
EXISTING
WITH KIWIRAIL STAGING PLAN. FOUNDATION
NAL 021/39 3.0m OFFSET PROVIDED TO
REDIRECTED AROUND FOUNDATION. IN
POND
TO BE CUT DOWN TO PREFERRED 1.5m
SW
PROVIDE 4X100Ø DUCTS TO LOC CASE
FACE OF MAST. LOCATE SERVICES
EVENT OF SOIL CAVING IN DURING PILE
DEPTH BELOW TOP OF RAIL, CONTRACTOR
CONDUITS AND ADJUST LOCALLY PRIOR
EXCAVATION FOR OLE FOUNDATION/
21800.000
TO NOTIFY KIWIRAIL IF NOT ACHIEVABLE
21850.000
2X65Ø SUB DUCTS FOR AXLE COUNTER KM21816
21900.000
TO CONSTRUCTION OF FOUNDATION.
21950.000
ANCHOR PROVIDE PILE CASING.
PROVIDE 2X100Ø ADDITIONAL DUCTS
NAL 021/37 3.0m OFFSET PROVIDED TO FACE OF MAST.
ALONGSIDE EXISTING FIBRE. REFER TO
MINOR RELOCATION OF FIBRE CONDUIT REQUIRED
DETAIL B ON DRG-NAL-CV-DT-01592-01
PRIOR TO CONSTRUCTION OF FOUNDATION.
SW
NAL 021/36 3.0m OFFSET PROVIDED
NEW UNDERTRACK SIGNAL CROSSING.
TO FACE OF MAST EMBANKMENT
REFER TO UNDERTRACK TYPICAL DETAIL
L ON DR-NAL-CV-DT-01584-01
!
SID-006
!
Kiwirail Signal Cable
P
O
P
O
P
O
P
P
Kiwirail Signal Cable
O
P
Kiwirail Signal Cable
O P
P O
SID-006
Kiwirail Signal Cable
P
P
P
O
O
P
P O
P
P
P O
O
O
O
P
O
P
P O
P O
P O
P O
P O
P O
P O
P O
P O
SWALE
SWALE
SWALE
SWALE
SW
UP MAIN
!
! ! ! ! ! ! ! ! ! ! !
L.O.W.
SW
SW
P
P
P
P
P
P
P
P
P
P
P
P
P
P
SWALE
DOWN MAIN
SWALE
SWALE
SWALE ! ! ! ! ! ! ! ! ! ! ! !
NAL 021/040 FOUNDATION TO
SW
1X65Ø SUB DUCT TO KM21918
BE RETAINED. FOUNDATION
EXPECTED TO BE 2950mm
PROVIDE NEW SIGNALLING PIT 3.0m MIN.
DEEP AND 700mm WIDE. TO BE
SW
21800.000
REMOVE REDUNDANT OLE MAST, FOUNDATION AND
21850.000
FROM TRACK CL. PIT TO BE 1200X600
21900.000
CONFIRMED ON SITE. KIWIRAIL
21950.000
W
W
ANCHOR PIN FOLLOWING OLE CROSSOVER
CONCRETE ROADWAY STRENGTH.
SW
W
TO BE  NOTIFIED IF
COMMISSIONING. FOUNDATION TO BE CUT DOWN TO
FOUNDATION DIMENSIONS
PREFERRED 1.5m DEPTH BELOW TOP OF RAIL,
ARE BELOW ABOVE VALUES.
CONTRACTOR TO NOTIFY KIWIRAIL IF NOT ACHIEVABLE
1X65Ø SUB DUCT TO KM21809 FOR NEW AX
W
4X65Ø SUB DUCTS 287CD:
4X65Ø SUB DUCTS 2870AB:
NAL 021/44 3.0m OFFSET
SW
1X65Ø TO KM21799
1X65Ø TO KM21819
NAL 021/38 3.0m OFFSET
PROVIDED TO FACE OF MAST
W
SW
1X65Ø TO KM21798
1X65Ø TO KM21820
PROVIDED TO FACE OF MAST
1X65Ø TO KM21794
1X65Ø TO KM21824
1X65Ø TO KM21793
1X65Ø TO KM21825
W
REFER TO DETAIL N ON DR-NAL-CV-DT-01584-01
REFER TO DETAIL N ON DR-NAL-CV-DT-01584-01
W
SW
OLE FOUNDATIONS AND DUCTING LAYOUT SHEET 2 OF 2
Scale 1:250
LEGEND
GENERAL
OLE FOUNDATIONS - EXISTING
TRACK CENTRELINE - PROPOSED
OLE FOUNDATIONS
SURVEYED RAIL
ANCHOR FOUNDATIONS
SURVEYED FEATURES
L.O.W.
LIMIT OF FORMATION WORKS
RAIL INFRASTRUCTURE - EXISTING
MUSHROOM
SERVICES - EXISTING
BALISE
SW
STORMWATER PIPE/CULVERT
DUCTING PIT - EXISTING
W
WATERMAIN
SS
WASTEWATER
DUCTING PIT
P
POWER
SERVICES - PROPOSED
O
FIBRE OPTIC
GAS
GAS / FUEL MAIN
KiwiRail Signal Cable
CABLE DUCTING
DUCTING PIT
DRAINAGE - EXISTING
OLE FOUNDATIONS - PROPOSED
NOTES:
!
!
!
!
!
CESS DRAIN
OLE FOUNDATIONS
1.
REFER TO DRG. DR-NAL-CV-GN-01574-01 FOR GENERAL NOTES.
ANCHOR FOUNDATIONS
2.
REFER TO CV-SD-SRA-00009 FOR SAFETY IN DESIGN REGISTER.
3.
DUCTING DESIGN SHOWN IS AS PER "RNGIM DUCTING V0.3.PDF", RECEIVED ON 12/11/2024 AND COMPLETED BY OTHERS.
4.
SUB-DUCTS NOT SHOWN FOR CLARITY.
5.
ALL PROPOSED DUCTS TO BE DRAW TAPED.
6.
REFER TO THE FOLLOWING DRAWINGS FOR LOC CASE MASS BLOCK RETAINING WALL DETAILS:
6.1 DR-NAL-CV-GA-01635-01 RETAINING WALL LAYOUT
6.2 DR-NAL-CV-PL-01638-01 PLAN VIEW
6.3 DR-NAL-CV-LS-01636-01 CROSS SECTIONS
6.4 DR-NAL-CV-DT-01641-01 DETAIL DRAWING
0
6.25
12.5
m
FOR CONSTRUCTION
1:250
CONSULTANT/CONTRACTOR:
KEYPLAN
REV
REVISION PARTICULARS
DRAWN
DATE
INITIALS
DATE
RNR
0.1
100% DESIGN FOR CLIENT REVIEW
LF
19/11/2024
DESIGNED
LF
19/11/2024
WO - 601101-55
APPROVED BY :
1.0
ISSUE FOR CONSTRUCTION
NY
16/12/2024
DRAWN
AO
19/11/2024
Copyright : "This drawing is and shall remain the property of KiwiRail Holdings Limited (KHL)
DATE :
CONTROLLED DOCUMENT
CHECKED
VA
19/11/2024
GLEN EDEN CROSSOVER
UNCONTROLLED WHEN PRINTED
APPROVED
TR
19/11/2024
Verify you are using the most recent version prior to use (Refer Kiwi Rail's Intranet)
NAL 21+700 TO 21+925
DRAWING No.
Original
Std Rev  No:
A1
1.0
Holders of printed versions are responsible for ensuring personal copies are kept up to date.
LINE: NAL
Km: 21+700 TO 21+925
Digital Data in Terms of .................................................... Co
NZGD2K.MOUNT EDEN
ordinate system.
DUCTING LAYOUT SHEET 2
C:\projectwise\nz_projects\global_jasmine.sim\d0168570\DR-NAL-CV-GA-01582-01.dwg  16-12-24  08:11 PM  Jasmine.Sim
SCALE:  1:250
Sht  No:
DR-NAL-CV-GA-01582-01
1








 NOTES
1.
ALL DIMENSIONS ARE IN METRES UNLESS
OTHERWISE STATED
2.
COORDINATES ARE IN TERMS OF THE NEW
ZEALAND GEODETIC 2000 DATUM BASED ON MOUNT
EDEN 2000. VERTICAL DATUM ARE IN TERMS OF
NZVD2016.
3.
SURVEY DATA HAS BEEN PROVIDED BY EXTERNAL
SURVEY COMPANY.
4.
ANY SERVICES ARE SHOWN AS INDICATIVE AND ARE
TO BE ACCURATELY LOCATED IN THE GROUND BY
SERVICE OWNER/PROVIDER BEFORE ANY WORK IS
CARRIED OUT IN THE AREA SHOWN IN THIS
DRAWING.
5.
CONTRACTOR IS TO ENSURE ALL RELEVANT
KIWIRAIL PERMITS ARE OBTAINED AND THE
REQUIRED LEVEL OF RAIL PROTECTION ID ON SITE
PRIOR TO ACCESSING THE RAIL CORRIDOR.
6.
CONTRACTOR TO CARRY OUT SERVICE LOCATE
ACCURATELY IDENTIFY ANY SERVICES PRIOR TO
CONSTRUCTION SITE PLAN.
7.
REFER TO MR-04885 FOR THE STANDARD MARTINUS
44m
EXTENT OF LIFTS/LOWER
1 IN 18 3.8m RH CROSSOVER, V2.0 AND MR-04886
FOR THE STANDARD MARTINUS 1 IN 18 3.8m LH
CROSSOVER, V2.0.
8.
DESIGN COMPLIES WITH T-ST-DE-5200 UNLESS
STATED OTHERWISE.
9.
NO HORIZONTAL CLEARANCE ISSUES TO OLE.
10. ALL CENTERLINE- CENTERLINE DIMENSIONS
GREATER THAN 3.67m INCLUDING CANT CENTER
THROW AND END THROW.
11. REFER DR-NAL-TR-LY-01438-01.dwg FOR LAYOUT
PLAN.
12. REFER DR-NAL-TR-PL-01440-01.dwg FOR SETTING
OUT.
40m
H&V TABLE KEY
   UPMAIN
SLEWS(-ve)
EXTENT OF LIFTS/LOWER
LIFTS (+ve)
39m
DATUM
LH CURVE RADIUS(-ve)
INCREASING CHAINAGE
 FEATURES: 
OB Start
OB End
SLEWS(+ve)
LOWERS (-ve)
RH CURVE RADIUS(+ve)
 KILOMETRAGE: 
In the Increasing Direction of Chainage,
 21362.927 
 21370.000 
 21380.000 
 21388.636 
 21390.000 
 21400.000 
 21410.000 
 21420.000 
 21430.000 
 21440.000 
 21450.000 
 21455.636 
 21460.000 
 21470.000 
 21480.000 
 21490.000 
 21500.000 
 21510.000 
 21520.000 
 21530.000 
 21540.000 
 21550.000 
 21560.000 
 21570.000 
 21580.000 
 21582.156 
 21590.000 
 21600.000 
 21610.000 
 21620.000 
 21630.000 
 21640.000 
 21640.441 
 21645.156 
 21650.000 
 21651.695 
 21660.000 
EXISTING CANT  (+ve) IF LHR >RHR
EXISTING CANT  (-ve)  IF LHR <RHR
R 322.000m
LEGEND
 HORIZONTAL ALIGNMENT 
TL 67.000m
L 126.520m
TL 63.000m
L 25.709m
L 316.216m
EXISTING TRACK
POB 21362.927
S 21388.636
CTP 21455.636
CTP 21582.156
S 21645.156
PROPOSED TRACK CENTERLINE
ADJACENT PROPOSED TRACK
VC 20.000m
 VERTICAL DESIGN 
L 30.160m
L 63.913m
L 41.338m
L 42.447m
L 25.263m
L 32.584m
L 55.399m
G:1.845%
G:1.545%
R 5674m
G:1.193%
G:1.457%
G:1.718%
G:1.433%
G:1.148%
TIE INS WITH EXISTING
 PR LOW RAIL LEVELS: 
39.437 
39.567 
39.752 
39.911 
39.936 
40.100 
40.255 
40.409 
40.564 
40.718 
40.873 
40.960 
41.026 
41.167 
41.290 
41.410 
41.529 
41.648 
41.772 
41.918 
42.063 
42.209 
42.355 
42.524 
42.696 
42.733 
42.857 
43.000 
43.143 
43.283 
43.398 
43.512 
43.517 
43.571 
43.627 
43.647 
43.742 
GEOMETRY CODING
 HORIZONTAL SLEW: 




-6 
-15 
-25 

-41 
-54 
-56 
-52 
-50 
-44 
-39 
-34 
-34 
-27 
-28 
-24 
-24 
-22 
-21 
-20 
-21 
-20 
-20 
-11 
34 
50 
63 
63 
65 
62 
61 
49 
          PVI     =       POINT OF VERTICAL INTERSECTION
          PVC   =       POINT OF VERTICAL CURVATURE
 LIFTS / FALLS: 
-0
6
3
0
1
6
13
22
24
35
43
48
52
47
30
15
11
10
14
31
41
36
22
20
20
20
16
2
4
20
14
10
10
9
8
7
2
          PVT   =       POINT OF VERTICAL TANGENCY
             G     =       GRADIENT
 EX. LOW RAIL LEVELS: 
           GL     =       GRADIENT LENGTH
39.437 
39.562 
39.749 
39.911 
39.935 
40.094 
40.241 
40.387 
40.540 
40.684 
40.830 
40.912 
40.975 
41.120 
41.260 
41.395 
41.518 
41.638 
41.757 
41.886 
42.023 
42.173 
42.332 
42.504 
42.676 
42.713 
42.840 
42.998 
43.139 
43.263 
43.383 
43.502 
43.508 
43.562 
43.619 
43.639 
43.740 
           RV     =       RADIUS OF VERTICAL CURVE
 PROPOSED CANT 
0
0
0
0
1
12
22
33
43
54
64
70
70
70
70
70
70
70
70
70
70
70
70
70
70
70
61
50
39
28
17
6
5
0
0
0
0
          T/O     =       TURNOUT
 EXISTING CANT 
5
6
10
15
16
25
40
38
49
58
67
72
75
76
77
74
75
73
75
75
78
75
76
73
72
70
65
58
49
39
31
18
18
14
12
12
11
         POS     =      POINT OF SWITCH
       TOTP     =      TURNOUT TANGENTIAL POINT
         TNC     =      THEORETICAL NOSE OF CROSSING
Approved for Construction
            IP      =      INTERSECTION POINT OF TURNOUT
POF     =      POINT OF FROG
 ETC      =     EXISTING TRACK CENTRE
PTC      =     PROPOSED TRACK CENTRE
PRL      =     PROPOSED RAIL LEVEL
ERL      =     EXISTING RAIL LEVEL
EL       =     ELEVATION
KM/ STA =     KILOMETERAGE
CT       =     CENTRE THROW
LLB      =      LAST LONG BEARER
REFERENCE DRAWINGS:
DR-NAL-TR-LY-01438-01.dwg (LAYOUT PLAN)
0
12.5
25
m H=1:500
V=1:50
0
1.25
2.5
-
CONSULTANT/CONTRACTOR:-
KEYPLAN
REV
REVISION PARTICULARS
DRAWN
DATE
INITIALS
DATE
1
ISSUED FOR CONSTRUCTION
SR
23/08/2024
DESIGNED
GLEN EDEN
RA
22/08/2024
-
APPROVED BY : -
-
-
-
DRAWN
SR
22/08/2024
WO - 601101
kas6849
Copyright : KiwiRail entities KiwiRail Holdings Limited, and New Zealand Railways Corporation
-
DATE : -
-
-
-
CHECKED
23/08/2024
ND
22/08/2024
CONTROLLED DOCUMENT
NAL 21.360 - 22.660
UNCONTROLLED WHEN PRINTED
-
-
-
-
REVIEWED
KA
22/08/2024
Verify you are using the most recent version prior to use (Refer KiwiRail's Intranet)
CROSS OVER 1 & 2
-
DRAWING No.
Original A1 Std Rev  No  1
Holders of printed versions are responsible for ensuring personal copies are kept up to date.
Digital data in terms of [Coordinate System] MOUNT EDEN
-
-
-
LINE: NAL
Km: 21.360-22.660
and [Vertical Datum] NZVD2016
-
LONG SECTION
Sht No
C:\BC-WorkSpace\SVC_MDN_PROD\M-Pd-aue-ma-01-vm,D-KiwiRail\Projects\Major Projects\601101 - RNGIM\601101-55-DES-D001 - New Lynn (Glen Eden) Crossover\Track\DR-NAL-TR-LS-01439-01.dwg  27-8-24  02:03 PM  svc_mdn_prod
-
-
-
SCALE:  H= 1:500, V= 1:50
DR-NAL-TR-LS-01439-01
1
PROJECT FILE No: -
Signed by Keith Ashington on: 27/08/2024 10:22:55 AM Issued for Construction








 NOTES
EXTENT OF
48m
EXTENT OF FORMATION
FORMATION
21765.072
217993.363
21747.276
1.
ALL DIMENSIONS ARE IN METRES UNLESS
21853.656
LLB 1A
CH  
21884.303
OTHERWISE STATED
ELEVATION: 45.021
21918.595
21819.365
50-FLAT
50-FLAT
50-FLAT
50-FLAT
50-FLAT
50-FLAT
标记
3
3
3
3
3
3
3
3
3
POF 1B CH  
ELEVATION: 45.314
2.
COORDINATES ARE IN TERMS OF THE NEW
标记
50-FLAT
50-FLAT
50-FLAT
ELEVATION: 45.858
3
3
3
3
3
3
3
3
POS 1B CH  
3
3
3
3
3
3
3
3
21872.900
ZEALAND GEODETIC 2000 DATUM BASED ON MOUNT
标记
50-FLAT50-FLAT
50-FLAT50-FLAT
50-FLAT
50-FLAT
3
3
3
3
3
3
3
3
3
标记
50-FLAT
50-FLAT
50-FLAT
50-FLAT
POF 2B CH  
LLB 1A
CH  
ELEVATION: 47.193
ELEVATION: 47.013
POS 2B CH  
EDEN 2000. VERTICAL DATUM ARE IN TERMS OF
ELEVATION: 47.737
LLB 1B CH  21754.393
50-FLAT
50-FLAT
50-FLAT
50-FLAT
50-FLAT
50-FLAT
NEW POF 2A CH  
NZVD2016.
标记
ELEVATION: 46.719
3
3
3
3
3
3
3
3
3
21701.582
ELEVATION: 45.133
50-FLAT
50-FLAT
50-FLAT
50-FLAT
标记
21735.873
3
3
3
3
3
NEW POS 2A CH  
ELEVATION: 46.175
3
3
3
3
3
3
3
3
3
3
3
标记
50-FLAT50-FLAT
50-FLAT50-FLAT
50-FLAT50-FLAT
3.
SURVEY DATA HAS BEEN PROVIDED BY EXTERNAL
3
3
3
3
3
3
3
3
3
标记
EXTENT OF
50-FLAT
50-FLAT
50-FLAT
SURVEY COMPANY.
ELEVATION: 44.296
FORMATION
LLB 2A CH  21865.783
ELEVATION: 44.840
POS 1A CH  
ELEVATION: 46.900
POF 1A CH  
20.000
4.
ANY SERVICES ARE SHOWN AS INDICATIVE AND ARE
45m
TO BE ACCURATELY LOCATED IN THE GROUND BY
SERVICE OWNER/PROVIDER BEFORE ANY WORK IS
EXTENT OF FORMATION
CARRIED OUT IN THE AREA SHOWN IN THIS
DRAWING.
5.
CONTRACTOR IS TO ENSURE ALL RELEVANT
KIWIRAIL PERMITS ARE OBTAINED AND THE
   UPMAIN
REQUIRED LEVEL OF RAIL PROTECTION ID ON SITE
43m
PRIOR TO ACCESSING THE RAIL CORRIDOR.
DATUM
6.
CONTRACTOR TO CARRY OUT SERVICE LOCATE
ACCURATELY IDENTIFY ANY SERVICES PRIOR TO
 FEATURES: 
CONSTRUCTION SITE PLAN.
L218 Signal
1A- POS
1A- POF
300 Dia Culvert
2B- POF
2B- POS
7.
REFER TO MR-04885 FOR THE STANDARD MARTINUS
1 IN 18 3.8m RH CROSSOVER, V2.0 AND MR-04886
 KILOMETRAGE: 
FOR THE STANDARD MARTINUS 1 IN 18 3.8m LH
CROSSOVER, V2.0.
 21660.000 
 21670.000 
 21680.000 
 21690.000 
 21696.222 
 21700.000 
 21700.493 
 21701.582 
 21710.000 
 21716.635 
 21720.000 
 21730.000 
 21735.844 
 21735.873 
 21740.000 
 21742.737 
 21742.775 
 21750.000 
 21760.000 
 21770.000 
 21772.040 
 21780.000 
 21790.000 
 21800.000 
 21810.000 
 21820.000 
 21830.000 
 21840.000 
 21850.000 
 21860.000 
 21870.000 
 21877.401 
 21877.439 
 21880.000 
 21884.303 
 21884.333 
 21890.000 
 21900.000 
 21903.542 
 21910.000 
 21918.595 
 21919.683 
 21920.000 
 21930.000 
 21940.000 
 21950.000 
 21960.000 
8.
DESIGN COMPLIES WITH T-ST-DE-5200 UNLESS
STATED OTHERWISE.
 HORIZONTAL ALIGNMENT 
L 316.216m
9.
NO HORIZONTAL CLEARANCE ISSUES TO OLE.
10. ALL CENTERLINE- CENTERLINE DIMENSIONS
GREATER THAN 3.67m INCLUDING CANT CENTER
VC 20.000m
 VERTICAL DESIGN 
L 245.969m
L 55.399m
L 63.630m
THROW AND END THROW.
R 4570m
G:1.586%
G:1.148%
G:1.385%
11. REFER DR-NAL-TR-LY-01438-01.dwg FOR LAYOUT
 PR LOW RAIL LEVELS: 
PLAN.
43.742 
43.857 
43.975 
44.114 
44.211 
44.271 
44.279 
44.296 
44.430 
44.535 
44.588 
44.747 
44.839 
44.840 
44.905 
44.949 
44.949 
45.064 
45.222 
45.381 
45.413 
45.540 
45.698 
45.857 
46.015 
46.174 
46.332 
46.491 
46.650 
46.808 
46.967 
47.084 
47.085 
47.125 
47.193 
47.194 
47.284 
47.442 
47.499 
47.601 
47.737 
47.754 
47.760 
47.918 
48.077 
48.215 
48.354 
12. REFER DR-NAL-TR-PL-01440-01.dwg FOR SETTING
 HORIZONTAL SLEW: 
49 
43 
36 
41 
41 
34 
33 
32 
25 
25 
25 
36 
36 
36 
35 
31 
31 
29 
30 
21 
21 
27 
32 
39 
46 
47 
46 
41 
42 
39 
38 
38 
38 
38 
34 
34 
29 
21 
24 
24 
22 
22 
22 
25 
29 
35 
43 
OUT.
 LIFTS / FALLS: 
2
-9
-12
3
24
33
34
34
33
37
39
52
64
64
76
81
81
97
120
127
127
126
127
142
153
146
138
136
140
134
130
128
128
127
128
128
134
126
119
105
88
86
86
74
71
66
59
H&V TABLE KEY
 EX. LOW RAIL LEVELS: 
SLEWS(-ve)
43.740 
43.865 
43.988 
44.111 
44.187 
44.238 
44.245 
44.262 
44.396 
44.498 
44.549 
44.695 
44.775 
44.775 
44.830 
44.868 
44.868 
44.967 
45.103 
45.254 
45.286 
45.414 
45.571 
45.715 
45.862 
46.028 
46.194 
46.355 
46.510 
46.674 
46.836 
46.956 
46.957 
46.998 
47.066 
47.066 
47.150 
47.317 
47.379 
47.496 
47.649 
47.668 
47.674 
47.844 
48.005 
48.149 
48.295 
LIFTS (+ve)
 PROPOSED CANT 
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
LH CURVE RADIUS(-ve)
 EXISTING CANT 
11
14
15
15
14
17
17
16
18
18
18
15
14
14
16
17
17
14
13
14
15
15
15
14
18
16
16
16
17
17
15
16
16
17
19
19
18
18
12
18
16
16
16
16
14
11
14
INCREASING CHAINAGE
EXTENT OF LIFTS/LOWER
EXTENT OF FORMATION
EXTENT OF FORMATION
SLEWS(+ve)
EXTENT OF LIFTS/LOWER
LOWERS (-ve)
48m
LLB 1A CH  21746.562
RH CURVE RADIUS(+ve)
ELEVATION: 45.021
21799.363
50-FLAT
50-FLAT
50-FLAT
50-FLAT
50-FLAT
50-FLAT
标记
In the Increasing Direction of Chainage,
3
3
3
3
3
3
3
3
3
NEW POS 1B
标记
50-FLAT
50-FLAT
50-FLAT
CH  
ELEVATION:
45.858
3
3
3
3
3
3
3
3
EXISTING CANT  (+ve) IF LHR >RHR
3
3
3
3
3
3
3
3
标记
50-FLAT50-FLAT
50-FLAT50-FLAT
50-FLAT50-FLAT
POS 1A CH  21701.582
EXISTING CANT  (-ve)  IF LHR <RHR
3
3
3
3
3
3
3
3
3
标记
ELEVATION: 44.296
50-FLAT
50-FLAT
50-FLAT
EXTENT OF FORMATION
21735.873
20.000
LEGEND
21753.688
21765.072
21853.656
EXISTING TRACK
NEW POF 1B
CH  
ELEVATION: 44.840
21884.303
21819.365
21918.595
PROPOSED TRACK CENTERLINE
POF 1A CH  
ELEVATION: 45.133
ELEVATION: 45.314
ADJACENT PROPOSED TRACK
LLB 1B CH  
EXTENT OF LIFTS/LOWER
21872.176
ELEVATION: 46.175
TIE INS WITH EXISTING
POF 2B CH  
LLB 1A
CH  
ELEVATION: 47.193
ELEVATION: 47.013
POS 2B CH  
ELEVATION: 47.737
45m
50-FLAT50-FLAT
50-FLAT50-FLAT
50-FLAT50-FLAT
NEW POF 2A CH  
标记
ELEVATION: 46.719
3
3
3
3
3
3
3
3
3
50-FLAT
50-FLAT
50-FLAT
标记
3
3
3
3
3
3
NEW POS 2A CH  
3
3
3
3
3
3
3
3
3
3
标记
50-FLAT50-FLAT
50-FLAT
50-FLAT
50-FLAT50-FLAT
3
3
3
3
3
3
3
3
3
标记
50-FLAT
50-FLAT
50-FLAT
50-FLAT
GEOMETRY CODING
LLB 2A CH  21865.059
ELEVATION: 46.900

EXTENT OF FORMATION
          PVI     =       POINT OF VERTICAL INTERSECTION
          PVC   =       POINT OF VERTICAL CURVATURE
   DOWNMAIN
          PVT   =       POINT OF VERTICAL TANGENCY
EXTENT OF LIFTS/LOWER
             G     =       GRADIENT
43m
DATUM
           GL     =       GRADIENT LENGTH
           RV     =       RADIUS OF VERTICAL CURVE
 FEATURES: 
          T/O     =       TURNOUT
OB End DM
Power Feed
1B- POF
300 Dia
Pipe Culvert
1B- POS
2A- POS
2A-POF
         POS     =      POINT OF SWITCH
Approved for Construction
       TOTP     =      TURNOUT TANGENTIAL POINT
 KILOMETRAGE: 
         TNC     =      THEORETICAL NOSE OF CROSSING
            IP      =      INTERSECTION POINT OF TURNOUT
 21648.497 
 21648.682 
 21650.000 
 21660.000 
 21670.000 
 21680.000 
 21690.000 
 21700.000 
 21710.000 
 21720.000 
 21730.000 
 21740.000 
 21749.244 
 21750.000 
 21758.170 
 21758.208 
 21760.000 
 21765.072 
 21765.101 
 21770.000 
 21770.820 
 21780.000 
 21784.310 
 21790.000 
 21799.363 
 21800.000 
 21800.452 
 21810.000 
 21818.276 
 21819.365 
 21820.000 
 21830.000 
 21834.418 
 21840.000 
 21850.000 
 21853.627 
 21853.656 
 21860.000 
 21860.520 
 21860.558 
 21870.000 
 21880.000 
 21890.000 
 21900.000 
 21910.000 
 21920.000 
 21930.000 
 21940.000 
 21950.000 
 21959.559 
POF     =      POINT OF FROG
 ETC      =     EXISTING TRACK CENTRE
 HORIZONTAL ALIGNMENT 
L 311.063m
PTC      =     PROPOSED TRACK CENTRE
PRL      =     PROPOSED RAIL LEVEL
ERL      =     EXISTING RAIL LEVEL
VC 20.000m
VC 20.000m
VC 20.000m
 VERTICAL DESIGN 
L 53.438m
L 20.000m
L 140.000m
L 30.023m
L 31.539m
G:1.383%
R 4725m
R 3192m
R 4440m
EL       =     ELEVATION
G:0.959%
G:1.586%
G:2.036%
G:1.799%
KM/ STA =     KILOMETERAGE
 PR LOW RAIL LEVELS: 
CT       =     CENTRE THROW
43.801 
43.803 
43.821 
43.960 
44.098 
44.236 
44.364 
44.470 
44.566 
44.662 
44.774 
44.917 
45.063 
45.075 
45.205 
45.205 
45.234 
45.314 
45.315 
45.392 
45.405 
45.551 
45.619 
45.710 
45.858 
45.868 
45.875 
46.027 
46.158 
46.175 
46.185 
46.344 
46.414 
46.503 
46.661 
46.719 
46.719 
46.820 
46.828 
46.829 
46.978 
47.137 
47.307 
47.499 
47.703 
47.906 
48.110 
48.290 
48.470 
48.642 
LLB      =      LAST LONG BEARER
 HORIZONTAL SLEW: 
-6 
-6 
-4 


11 
12 
13 
14 
11 
13 
17 
18 
18 
21 
21 
22 
21 
21 
25 
26 
25 
27 
33 
32 
32 
33 
29 
33 
32 
31 
28 
26 
26 
21 
21 
21 
21 
21 
21 
17 
14 
15 
15 
13 
11 
10 



 LIFTS / FALLS: 
3
4
5
-0
-8
-18
-31
-61
-106
-151
-189
-191
-172
-170
-156
-156
-156
-154
-154
-153
-153
-153
-154
-156
-148
-147
-147
-146
-149
-150
-151
-157
-157
-156
-158
-158
-157
-158
-159
-159
-157
-167
-171
-148
-103
-56
-13
0
1
0
 EX. LOW RAIL LEVELS: 
43.797 
43.800 
43.816 
43.960 
44.106 
44.254 
44.395 
44.531 
44.672 
44.813 
44.963 
45.108 
45.236 
45.245 
45.361 
45.362 
45.390 
45.468 
45.468 
45.545 
45.558 
45.705 
45.774 
45.866 
46.006 
46.016 
46.022 
46.173 
46.307 
46.325 
46.336 
46.501 
46.571 
46.658 
46.819 
46.876 
46.877 
46.978 
46.987 
46.987 
47.136 
47.304 
47.478 
47.647 
47.806 
47.962 
48.123 
48.290 
48.469 
48.642 
 PROPOSED CANT 
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
 EXISTING CANT 
-4
-4
-5
-4
-4
-6
-4
-1
2
3
4
6
1
1
5
5
4
1
1
2
2
1
1
1
-2
-2
-2
0
1
1
1
0
-2
-3
-1
1
1
2
2
2
2
2
1
0
0
1
-1
2
1
6
0
12.5
25
REFERENCE DRAWINGS:
m H=1:500
V=1:50
DR-NAL-TR-LY-01438-01.dwg (LAYOUT PLAN)
0
1.25
2.5
-
CONSULTANT/CONTRACTOR:-
KEYPLAN
REV
REVISION PARTICULARS
DRAWN
DATE
INITIALS
DATE
1
ISSUED FOR CONSTRUCTION
SR
23/08/2024
DESIGNED
GLEN EDEN
RA
22/08/2024
-
APPROVED BY : -
-
-
-
DRAWN
SR
22/08/2024
WO - 601101
kas6849
Copyright : KiwiRail entities KiwiRail Holdings Limited, and New Zealand Railways Corporation
-
DATE : -
-
-
-
CHECKED
23/08/2024
ND
22/08/2024
CONTROLLED DOCUMENT
NAL 21.360 - 22.660
UNCONTROLLED WHEN PRINTED
-
-
-
-
REVIEWED
KA
22/08/2024
Verify you are using the most recent version prior to use (Refer KiwiRail's Intranet)
CROSS OVER 1 & 2
-
DRAWING No.
Original A1 Std Rev  No  1
Holders of printed versions are responsible for ensuring personal copies are kept up to date.
Digital data in terms of [Coordinate System] MOUNT EDEN
-
-
-
LINE: NAL
Km: 21.360-22.660
and [Vertical Datum] NZVD2016
-
LONG SECTION
Sht No
C:\BC-WorkSpace\SVC_MDN_PROD\M-Pd-aue-ma-01-vm,D-KiwiRail\Projects\Major Projects\601101 - RNGIM\601101-55-DES-D001 - New Lynn (Glen Eden) Crossover\Track\DR-NAL-TR-LS-01439-01.dwg  27-8-24  02:03 PM  svc_mdn_prod
-
-
-
SCALE:  H= 1:500, V= 1:50
DR-NAL-TR-LS-01439-01
2
PROJECT FILE No: -
Signed by Keith Ashington on: 27/08/2024 10:22:55 AM Issued for Construction








 NOTES
1.
ALL DIMENSIONS ARE IN METRES UNLESS
OTHERWISE STATED
2.
COORDINATES ARE IN TERMS OF THE NEW
ZEALAND GEODETIC 2000 DATUM BASED ON MOUNT
EDEN 2000. VERTICAL DATUM ARE IN TERMS OF
NZVD2016.
3.
SURVEY DATA HAS BEEN PROVIDED BY EXTERNAL
SURVEY COMPANY.
4.
ANY SERVICES ARE SHOWN AS INDICATIVE AND ARE
TO BE ACCURATELY LOCATED IN THE GROUND BY
SERVICE OWNER/PROVIDER BEFORE ANY WORK IS
CARRIED OUT IN THE AREA SHOWN IN THIS
DRAWING.
5.
CONTRACTOR IS TO ENSURE ALL RELEVANT
KIWIRAIL PERMITS ARE OBTAINED AND THE
REQUIRED LEVEL OF RAIL PROTECTION ID ON SITE
PRIOR TO ACCESSING THE RAIL CORRIDOR.
6.
CONTRACTOR TO CARRY OUT SERVICE LOCATE
ACCURATELY IDENTIFY ANY SERVICES PRIOR TO
CONSTRUCTION SITE PLAN.
7.
REFER TO MR-04885 FOR THE STANDARD MARTINUS
EXTENT OF LIFTS/LOWER
1 IN 18 3.8m RH CROSSOVER, V2.0 AND MR-04886
FOR THE STANDARD MARTINUS 1 IN 18 3.8m LH
CROSSOVER, V2.0.
51m
8.
DESIGN COMPLIES WITH T-ST-DE-5200 UNLESS
STATED OTHERWISE.
9.
NO HORIZONTAL CLEARANCE ISSUES TO OLE.
50m
10. ALL CENTERLINE- CENTERLINE DIMENSIONS
GREATER THAN 3.67m INCLUDING CANT CENTER
THROW AND END THROW.
11. REFER DR-NAL-TR-LY-01438-01.dwg FOR LAYOUT
PLAN.
12. REFER DR-NAL-TR-PL-01440-01.dwg FOR SETTING
OUT.
EXTENT OF LIFTS/LOWER
H&V TABLE KEY
SLEWS(-ve)
LIFTS (+ve)
47m
LH CURVE RADIUS(-ve)
DATUM
INCREASING CHAINAGE
 FEATURES: 
SLEWS(+ve)
KM Post
Signal
LOWERS (-ve)
RH CURVE RADIUS(+ve)
 KILOMETRAGE: 
In the Increasing Direction of Chainage,
EXISTING CANT  (+ve) IF LHR >RHR
 21960.000 
 21961.372 
 21970.000 
 21977.333 
 21980.000 
 21990.000 
 22000.000 
 22010.000 
 22020.000 
 22021.372 
 22030.000 
 22040.000 
 22050.000 
 22060.000 
 22070.000 
 22080.000 
 22090.000 
 22100.000 
 22110.000 
 22120.000 
 22130.000 
 22130.543 
 22140.000 
 22150.000 
 22160.000 
 22163.878 
EXISTING CANT  (-ve)  IF LHR <RHR
LEGEND
 HORIZONTAL ALIGNMENT 
R 622.000m
TL 60.000m
L 142.505m
EXISTING TRACK
S 21961.372
CTP 22021.372
CTP 22163.878
PROPOSED TRACK CENTERLINE
ADJACENT PROPOSED TRACK
VC 85.000m
L 30.055m
 VERTICAL DESIGN 
L 63.630m
L 44.946m
G:-0.561%
G:1.385%
G:1.466%
R 4194m
TIE INS WITH EXISTING
 PR LOW RAIL LEVELS: 
48.354 
48.373 
48.492 
48.594 
48.631 
48.769 
48.908 
49.051 
49.198 
49.218 
49.345 
49.491 
49.638 
49.769 
49.876 
49.960 
50.020 
50.056 
50.068 
50.056 
50.020 
50.018 
49.966 
49.910 
49.854 
GEOMETRY CODING
 HORIZONTAL SLEW: 
          PVI     =       POINT OF VERTICAL INTERSECTION
43 
43 
43 
42 
40 
26 
18 
13 
13 
14 
14 
21 
18 
20 
19 
23 
23 
21 
17 
12 





10 
          PVC   =       POINT OF VERTICAL CURVATURE
 LIFTS / FALLS: 
59
57
47
40
37
19
19
11
4
4
11
12
18
18
16
9
11
3
6
17
6
5
-3
2
1
          PVT   =       POINT OF VERTICAL TANGENCY
             G     =       GRADIENT
 EX. LOW RAIL LEVELS: 
           GL     =       GRADIENT LENGTH
48.295 
48.316 
48.446 
48.553 
48.594 
48.751 
48.888 
49.040 
49.194 
49.214 
49.333 
49.479 
49.620 
49.751 
49.861 
49.951 
50.009 
50.052 
50.061 
50.038 
50.014 
50.013 
49.968 
49.908 
49.853 
49.829 
           RV     =       RADIUS OF VERTICAL CURVE
 PROPOSED CANT 
0
0
10
19
22
33
45
57
68
70
70
70
70
70
70
70
70
70
70
70
70
70
70
70
70
70
          T/O     =       TURNOUT
 EXISTING CANT 
14
15
26
31
35
51
68
72
73
73
80
79
75
78
79
77
79
78
79
81
78
78
78
76
70
71
         POS     =      POINT OF SWITCH
       TOTP     =      TURNOUT TANGENTIAL POINT
   UPMAIN
         TNC     =      THEORETICAL NOSE OF CROSSING
Approved for Construction
            IP      =      INTERSECTION POINT OF TURNOUT
POF     =      POINT OF FROG
 ETC      =     EXISTING TRACK CENTRE
PTC      =     PROPOSED TRACK CENTRE
PRL      =     PROPOSED RAIL LEVEL
ERL      =     EXISTING RAIL LEVEL
EL       =     ELEVATION
KM/ STA =     KILOMETERAGE
CT       =     CENTRE THROW
LLB      =      LAST LONG BEARER
REFERENCE DRAWINGS:
DR-NAL-TR-LY-01438-01.dwg (LAYOUT PLAN)
0
12.5
25
m H=1:500
V=1:50
0
1.25
2.5
-
CONSULTANT/CONTRACTOR:-
KEYPLAN
REV
REVISION PARTICULARS
DRAWN
DATE
INITIALS
DATE
1
ISSUED FOR CONSTRUCTION
SR
23/08/2024
DESIGNED
GLEN EDEN
RA
22/08/2024
-
APPROVED BY : -
-
-
-
DRAWN
SR
22/08/2024
WO - 601101
kas6849
Copyright : KiwiRail entities KiwiRail Holdings Limited, and New Zealand Railways Corporation
-
DATE : -
-
-
-
CHECKED
23/08/2024
ND
22/08/2024
CONTROLLED DOCUMENT
NAL 21.360 - 22.660
UNCONTROLLED WHEN PRINTED
-
-
-
-
REVIEWED
KA
22/08/2024
Verify you are using the most recent version prior to use (Refer KiwiRail's Intranet)
CROSS OVER 1 & 2
-
DRAWING No.
Original A1 Std Rev  No  1
Holders of printed versions are responsible for ensuring personal copies are kept up to date.
Digital data in terms of [Coordinate System] MOUNT EDEN
-
-
-
LINE: NAL
Km: 21.360-22.660
and [Vertical Datum] NZVD2016
-
LONG SECTION
Sht No
C:\BC-WorkSpace\SVC_MDN_PROD\M-Pd-aue-ma-01-vm,D-KiwiRail\Projects\Major Projects\601101 - RNGIM\601101-55-DES-D001 - New Lynn (Glen Eden) Crossover\Track\DR-NAL-TR-LS-01439-01.dwg  27-8-24  02:03 PM  svc_mdn_prod
-
-
-
SCALE:  H= 1:500, V= 1:50
DR-NAL-TR-LS-01439-01
3
PROJECT FILE No: -
Signed by Keith Ashington on: 27/08/2024 10:22:55 AM Issued for Construction