Kia ora 
 
 
We have installed two new 100mm pipes to cater for any overflow if the sump becomes 
blocked. These pipes will ensure any overflow does not exceed the height of the islands. If water 
rises high enough to spill over these islands, the overland flow path will function in the same 
way as it did before. 
 
The analysis for the new 100mm pipes was conducted onsite, and while it did not directly 
compare to the previous set up, it was determined that the overland flow path across the 
islands will not be any worse in future events. If this does not prove to be correct, we will 
undertake work to install an additional sump. However, we want to assure you and 
of 
our confidence that the current set up will work effectively and the recent changes should not 
make the existing situation worse. This is supported by recent monitoring of the stormwater 
drainage following construction during periods of heavy rain to ensure the sumps were working 
as expected – and no concerns have been identified. 
 
We have attached a video showing this. Even with leaves and some rubbish (which is a common 
occurrence in your area), you can see the stormwater is managed and there is no evidence of 
water pooling around the raised threshold crossing. To ensure the ongoing effectiveness of the 
system, we have added the sump to our critical sump list which will mean it will be cleaned 
every three months. This is additional work to the monthly sweep by our maintenance team, 
with the most recent sweep occurring on 18/10/2024. 
 
If there are any issues between sweeps or sump cleaning, our contractor can complete urgent 
work earlier than the planned three-monthly cycle. If you notice rubbish clearly blocking the 
sump, please contact the Council or use the ‘FIXiT’ app. 
 
Shout out if you need anything more… 
 
Regards 
 
Brad Singh 




PrEng. CMEng. 
Kaiwhakahaere – Ngā Waka me te Hanga (Manager Transport & Infrastructure) 
Wellington City Council 
 E [email address] W Wellington.govt.nz |   |   
 
The information contained in this email is privileged and confidential and intended for the 
addressee only. 
If you are not the intended recipient, you are asked to respect that confidentiality and not 
disclose, copy or make use of its contents. 
If received in error you are asked to destroy this email and contact the sender immediately. Your 
assistance is appreciated. 
 
 


From:
Dan Ryan
To:
Cc:
Jack Sargentina; BUS: Karori Connections
Subject:
RE: Upcoming Work at Saint Mary Street
Date:
Monday, 9 September 2024 8:18:25 am
Attachments:
Screenshot_20240905_161034_Email.jpg
20240905_161451_55087670218559.mp4
image002.png
image003.png
Kia ora 
Thank you for sending these through. 
I will share these with our delivery lead, who can use them to refer to when assessing the
drainage in this area during the crossing works.
Jack and I will be on site at some point over the next few days to assess the disruption in and out
of work hours.
 
Please let me know if there is anything else you need prior to then.
 
Ngā mihi,
Dan Ryan
Project Manager Development | Street Transformation | City Design | Wellington City Council

 | [email address]W  Wellington.govt.nz
 
 
The information contained in this email is privileged and confidential and intended for the addressee only.
If you are not the intended recipient, you are asked to respect that confidentiality and not disclose, copy or make use of its
contents.
If received in error you are asked to destroy this email and contact the sender immediately. Your assistance is appreciated.
 
From: 
 
Sent: Thursday, September 5, 2024 4:15 PM
To: Dan Ryan [email address]
Subject: Drainage of block water flow from st mary street
 
Hi
Nice talk to u about  as mentioned about add photo
 As st mary work 
Thanxs 
 
 
 



Sent from my Galaxy
From: Dan Ryan 
Sent: Thursday, September 5, 2024 12:26 PM
To: 
Cc: Jack Sargentina <[email address]>; BUS: Karori Connections
<[email address]>; Darren Chetty <
>
Subject: Upcoming Work at Saint Mary Street
Kia ora 
Thank you for meeting with Jack and myself yesterday to discuss the upcoming work at Saint
Mary Street among other items which I will cover off below.
It was useful meeting to discuss the upcoming work, as we were able to also discuss some of your
other concerns, including the drainage issue and signage request for P10 at all times.
Here is a summary of what we discussed:
The current work at the Tinakori/Bowen bus stop is tracking for completion at the end of
this week (8/09/24) – weather dependant.
The work on Saint Mary Street is scheduled to start on the following week (9/09/24) and is
likely to take two weeks for completion (22/09/24) – weather dependant. The works will be
undertaken during the hours of 9.00am – 4.00pm.
During the work, there will be parking temporarily removed on Saint Mary Street and
Tinakori Road. Some of this will be re-instated outside of the work hours, except for 1-2
parks that may be required to store plant/equipment outside of the work hours. I have
attached the TMP for your reference also.
Jack and/or myself will be visiting site once the work has started to assess disruption, along
with a second visit outside of the work hours to assess this also.


A request for drainage investigation and assessment of the area we discussed has been
flagged to our delivery lead, I will update you once we know more about this matter – most
likely when the footpath has been opened in this zone.
A request for the P10 sign change to P10 at all times has also been made with the delivery
lead, I will also update you on this once I have received a confirmation of this change.
The site contact for this work from Downer will be Darren Chetty – 021 195 9211. For any
urgent site issues, please feel free to contact Darren. For anything else, please contact me
of Jack.
 
Thanks again for your time yesterday, please let me know if you have any questions or need
anything else at this time.
 
Ngā mihi,
Dan Ryan
Project Manager Development | Street Transformation | City Design | Wellington City Council
 | [email address]W  Wellington.govt.nz
 
 
The information contained in this email is privileged and confidential and intended for the addressee only.
If you are not the intended recipient, you are asked to respect that confidentiality and not disclose, copy or make use of its
contents.
If received in error you are asked to destroy this email and contact the sender immediately. Your assistance is appreciated.
 

Document Outline